ML20072F345
| ML20072F345 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 06/10/1983 |
| From: | Mooney J CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| Shared Package | |
| ML20072F323 | List: |
| References | |
| CSC-6738, NUDOCS 8306270349 | |
| Download: ML20072F345 (1) | |
Text
n-u, i
/+trk h medh
&laam w Ma&w O' CODSum8fS Power a 4 =oon v Executive Mmager Midland I+oject Office General officos: 1945 West Parnall Road, Jackson, MI 49201 e (517) 788-0774 June 10, 1983 PMNCIPAL STAFFi RA i
l5NF Mr J J Harrison 3/RA i 13CS 43 b Midland Project Section N3M PAC l-I
~
U S Nuclear Regulatory Commission
$[d--
Region Ill P - -.'4 799 Roosevelt Road Ig[-- g Glen Ellyn, IL 60137 i,
j
$t.
F(111
! /dhl)&d4 MIDLAND ENERGY CENTER GWO 7020 REMEDIAL SOILS WORK AUTHORIZATION
@t(OCd/lXMCi/l 4 PAY File: 0485.16 UFI: 42*05*22*04 Serial: CSC-6738
@SCS 12*32 As per discussions with the NRC during their May 11 and 12 site visit, attached is a report on the evaluation of the continuous sampling torings in the Service Water Pump Structure (SWPS) area. This evaluation is based on the first six borings. The report summarizes our findings included are boring logs, piezometer installation details, etc.
Based on this evaluation CPCo has determined to install the SWPS dewatering wells to elevation 570 feet.
It should be noted that the NRR had suggested this elevation at the June 25, 1982 meeting, in Bethesda MD, in lieu of the investigation of the initial borings.
Based on our review, we concluded that we are ready to start work:
207050605 - Install Remaining Ejector Wells 207050600 - Install Piezometers According to the NRC/CPCo Work Authorization Procedure, we request author-ization for the above activities.
- J
/DWP/klm Attachments (3) copies f
eggsgrea8yh m20m A
L
fB h h ttac$me,tt A At#W g,dmia~
Oy consumers Power 4 4 =oonav b,
Company
" " " * ' ^ " " " "
Atidiand Project Office General offices: 1945 West Parnall Road, Jackson, MI 49201 * (517) 788-0774 pggpggp g
g IRA l
lith;l 0/R1 I iscs+4+3 IA03.Li ido I 0
l2.?O'_)i isLO i f
June 13, 1983 6:3.':Li lRC I 6
iC%E P; i
i gg--- ;
GI.
t l
+
Mr. J. J. Harrison I
Midland Project Section U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND ENERGY CENTER CWO 7020 REMEDIAL SOILS WORK AUTHORIZATION File: 0485.10 UFI:
42*05*22*04 Serial:
CSC-6746 12*32 We have completed our review of the documents for the activities listed below.
Based on our review, we concluded that we are ready to start the work:
207050635 - Install Dewatering Discharge System (including headers, tank, pumps and electrical) l According to the NRC/CPCo Work Authorization Procedure, we request authori-zation for the above activities.
l OOl &