Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20045G516 + (ML20045G516)
- ML20045G517 + (ML20045G517)
- ML20045G518 + (ML20045G518)
- ML20045G522 + (ML20045G522)
- ML20045G525 + (ML20045G525)
- ML20045G526 + (ML20045G526)
- ML20045G527 + (ML20045G527)
- JAFP-93-0381, Monthly Operating Rept for June 1993 for Ja FitzPatrick Nuclear Power Plant + (ML20045G529)
- L-93-026, Forwards Proprietary Update to C-E Physical Security Plan, Providng Info Re Removal of Room 224C in Bldg 5 of Product Development Facility from NRC Approved Security Plan,Since Vendor No Longer Plans to Handle SNM in Room.Encl Withheld + (ML20045G530)
- ML20045G531 + (ML20045G531)
- ML20045G532 + (ML20045G532)
- ML20045G534 + (ML20045G534)
- ML20045G535 + (ML20045G535)
- ML20045G536 + (ML20045G536)
- ML20045G537 + (ML20045G537)
- ML20045G538 + (ML20045G538)
- ML20045G539 + (ML20045G539)
- ML20045G541 + (ML20045G541)
- ML20045G542 + (ML20045G542)
- ML20045G543 + (ML20045G543)
- PNO-III-93-039, on 930706,augmented Insp Team Dispatched to Facility Due to Fuel Assembly Stuck as Upper Reactor Internals Lifted.Licensee Stopped Lift & Closed Containment Hatch to Restore Containment Integrity + (ML20045G544)
- ML20045G545 + (ML20045G545)
- ML20045G546 + (ML20045G546)
- ML20045G547 + (ML20045G547)
- ML20045G548 + (ML20045G548)
- ML20045G549 + (ML20045G549)
- ML20045G551 + (ML20045G551)
- PNO-III-93-038A, licensee & Fuel Vendor Confirmed That Highly Radioactive Object Found in Refueling Area Was Fuel Rod from Fuel Assembly Currently Located in Reactor Vessel.Three Pieces of Fuel Rod Recovered.Some Pellets Still Missing + (ML20045G552)
- ML20045G553 + (ML20045G553)
- ML20045G558 + (ML20045G558)
- HL-3334, Part 21 Rept Re Defect in safety-related Solenoid Valve Mfg by Automatic Valve Co & Supplied by Atwood & Morrill Co,Inc. Solenoid Valves Installed in Unit 1 MSIVs Visually Inspected.Spare Solenoids Inspected Also + (ML20045G559)
- ML20045G560 + (ML20045G560)
- ML20045G561 + (ML20045G561)
- ML20045G564 + (ML20045G564)
- ML20045G565 + (ML20045G565)
- ML20045G567 + (ML20045G567)
- PNO-III-93-040, on 930619,plant Shut Down for Repair of Leak in HPCI Sys.Licensee Does Not Plan to Restart Plant as Previously Scheduled Because of Flooding of Area Evacuation Routes + (ML20045G568)
- ML20045G569 + (ML20045G569)
- ML20045G570 + (ML20045G570)
- ML20045G571 + (ML20045G571)
- B14519, Forwards Applied Research Associates,Inc Final Rept 5773.1, Tornado PRA of CT Yankee Atomic Power Station:Update 1992, to Support Closeout of SEP Topics III-2 & III-4.A Re Wind & Tornado Loadings/Tornado Missiles,Respectively + (ML20045G572)
- ML20045G574 + (ML20045G574)
- ML20045G575 + (ML20045G575)
- ML20045G576 + (ML20045G576)
- ML20045G577 + (ML20045G577)
- ML20045G578 + (ML20045G578)
- BSEP-93-0108, Provides Suppl Info Re Tornado Wind Loads on Reactor Bldg Fan Room Miscellaneous Steel Framing for Partition Walls + (ML20045G579)
- ML20045G581 + (ML20045G581)
- 05000325/LER-1993-003-03, :on 930608,RPS MG a Tripped,Resulting in Successful ESF Actuations & Isolations Due to Defective Procedure.Voltage Adjust Potentiometer for MG a Voltage Regulator Replaced on 930617 + (ML20045G582)
- B14539, Forwards Rev 26 to Haddam Neck Plant Physical Security Plan. Rev Withheld,Per 10CFR2.790(a) + (ML20045G583)
- ML20045G584 + (ML20045G584)