Monthly Operating Rept for June 1993 for Cooper Nuclear Station
ML20045G577
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/30/1993
From: Gardner R, Sullivan E
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CNSS938721, NUDOCS 9307140141
Download: ML20045G577 (5)


Text

.

4 i

e iTM COOPER NUCLEAR STATON g.

k 9a P.O. DOX 98. BROWNVILLE, NEBRASM A 68321 F'WR..sj, Nebraska Public Power District "im"!J:ti,""

tea n nu a

- =:

w n.

_.a, s:= mumm =gu.

-m a = =====g g,= = -- =

=.

CNSS938721 July 8, 1993 Document Control Desk U. S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Monthly Operating Status Report for June, Docket No. 50-298.

Centlemen:

Enclosed for your information and use is the Cooper Nuc1 car Station Monthly Operating Status Report for June 1993.

The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data and a Narrative Summary of Operating Experience.

Should you have any comments, or require additional information regarding this report, please contact me.

Sincerely, ff L. Gardner Plant Manager RLG:MRE: dis Enclosures cc:

G. D. Watson J.

L. Milhoan 130005 9307140141 930630 DR ADOCK 05000298

[6.2 Y PDR gj

= a w w w asuua ap hppgd;lL l &,=y, L,xh_aa=.a muau.' nmnypm, ry rwmm r ym-,w,v-g ne p

e 77 mq pm s

.t a

.:=

I, L

i-OPERATING DATA REPORT DOCKET NO.

050-0298 UNIT CNS DATE July 8. 1993 OPERATING STATUS TELEPHONE (402) 825 5291 1.

Unit Name:

CooDer Nuclear Station Notes 2.

Reporting Period:

June 1993 3.

Ucensed Thermal Power (MWt):

2381 4.

Nameplate Rating (Gross MWe):

836 5.

Design Electrical Rating (Not MWe):

778 6

Maximum Dependable Capacity (Gross MWe):

787 7.

Maximum Dependable Capacity (Net MWe):

764 8

N Changes Occur in Capacity Ratings (Mems Number 3 Through 7) Since Last Report, Give Reasons:

g.

Power Level To Which Restricted, N Any (Net MWe):

10.

Reasons For Restriction, N Any:

This Month Yr.-to-Date Cumulative 11.

Hours in Reporting Period 720.0 4.343.0 166.560.0 12.

Number of Hours Reactor Was Cr;tical 0.0 1.526.0 126.493.0 13.

Reactor Reserve Shutdown Hours 0.0 0.0 0.0 14.

Hours Generator On-une 0.0 1.526 0.

124.734.9 15.

Unit Reserve Shutdown Hours 0.0 0.0 0.0 te, Gross Thermal Energy Generated (MWH) 0.0 3.405.552.0 256,249.516.0 17.

Gross Electric Energy Generated (MWH) 0.0 1.134.134.0 83.125.116.0 18.

Net Electric Energy Generated (MWH) 0.0 1.096.791.0 80.255.107.0 19.

Unit Service Factor 0.0 35.1 74.9 20.

Unit Availability Factor 0.0 35.1 74.9 21.

Unit Capacity Factor (Using MDC Net) 0.0 33.1 63.1 22.

Unit Capacity Factor (Using DER Net) 0.0

'32.5 61.9 23 Unit Forced Outage Rate 0.0 0.0 4.3 24.

Shutdown Scheduled Over Next 6 Months (Type, Dateiand Duration of Each):

25.

H Shut Down At End of Report Period, Estimated Date of Startup: ' July 11.1993 26 Units in Test Status (Prior to Commercial Operation):

Forecast

. Achieved INITIAL CRITICAUTY INITIAL ELECTRICITY COMMERCIAL OPERATION

4 4

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

050-0298 UNIT CNS DATE Julv 8, 1993 TELEPHONE (402) 825-5291 MONTH June 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

4' O

20 0

5 0

21 0

6 0

22 0

7 0

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 16 0

INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

050-0298 UNIT NAME Cooper Nuclear Station DATE July 8.1993 COMPLETED BY E. A. Sullivan TELEPHONE (402) 825-5291 REPORT MONTH June 1993 Method Of Ucensee Cause & Corrective Duration Shutting Event System' Component' Action to No.

Date Type' (Hours)

Reason' Down Reactor' Report Code Code Prevent Recurrence 93-1 3/5/93 S

720 C

2 N/A N/A N/A Diesel generator #2 overhaul through 6/18/93; RHR work through end o' June (see Operations Narrative).

h 1

F: Forced 2

Ressen:

3 Method:

4 Exhibit G - Instructions for S: Scheduled A - Equipment Failure (Explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets for Ucensee Event i

C - Refueling 3 - Automatic Scram Report (LER) File (NUREG4161)

D - Regulatory Restriction 4 - Continued E - Operator Training & Ucense Examination 5 - Reduced Load 5 Exhibit I-Same Source F - Administrative 6 - Other G - Operational &ror (Explain)

H - Other (Explain)

?

r OPERATIONS NARRATIVE COOPER NUCLEAR STATION June 1993

?

The EOC 15 Refueling Outage' began March 5 and continued through the month of June.

Maintenance and repair activities continued through the month of June.

f t

t Cooper Station had 0.0 percent capacity factor for the month of June.