ML20045G522

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for June 1993 for Millstone, Unit 2 & Revised Unit Shutdowns & Power Reductions Data for May 1993 for Millstone,Unit 2
ML20045G522
Person / Time
Site: Millstone Dominion icon.png
Issue date: 07/09/1993
From: Scace S
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20045G523 List:
References
MP-93-543, NUDOCS 9307140074
Download: ML20045G522 (1)


Text

.

e o-b General Offices

-m amow tw a wwe aan 1

.me wwxu ns unw u "

P.O. BOX 270

=*w m w=EwYc1, EEE HARTFORD. CONNECTICUT 06141-0270 k

J w m. cww (203) 665-5000 July 9, 1993 MP-93-543 Re:

10CFR50.71(a)

U.S. Nuclear Regulatory Commission Document Control Derk 1Jashington, D. C.

20555

Reference:

Facility Operating License No. DPR-65 Docket No. 50-336

Dear Sir:

This letter is forwarded to provide the report of operating and shutdown experience relating to Millstone Unit 2 for the month of June 1993, in accordance with Appendix A Technical Specifications, Section.6.9.1.6.

One additional copy of the report is enclosed. Also enclosed is a revised copy of the May, 1993, Unit Shutdowns and Power Reductions.

Very truly yours, f

NORTHEAST NUCLEAR ENERGY COMPANY

  • M 4

Stapheh E. Scace Vice President - Millstone Station SES/sid cc: T. T. Martin, Region I Administrator G. S. Vissing, NRC Project Manager, Millstone Unit No. 2 P. D. Swetland, Senior Resident Inspector, Millstone Unit Nos. 1, 2 & 3 i-I I

w I^

9307140074 930709 sy j 3 lh l'

PDR ADOCK 05000336

$g PDR yi g

R k

OSX/ RE V 4-88