ML20045G571

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1993 for Trojan Nuclear Plant
ML20045G571
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 06/30/1993
From: Hugo B, Quennoz S
PORTLAND GENERAL ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
SMQ-051-93, SMQ-51-93, NUDOCS 9307140136
Download: ML20045G571 (5)


Text

.

cm f

/-7 M.

!==

s

\\

Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River Hwy.

Rainier, Oregon 97048 (503) 556-3713 SMQ-051-93 July 7, 1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S.

Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sirs:

M_onthly Operatina Recor_t.

In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly Operating Report is submitted for June 1993.

Sincerely, d n1 S.

M.

Quennoz General Manager Trojan Nuclear Plant Attachment c:

Mr. Bobby H.

Faulkenberry Regional Administrator, Region V U.S.

Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr.

J.

F.

Melfi USNRC Resident Inspector Trojan Nuclear Plant 1 G I) O O 7 Ohk o$00@44 g

761Y PDR g

lfy

1 c

..a Trdjan Nuclear Plant Document Control Desk Docket 50-344 July 7,-1993 License NPF-1 Attachment 4 pages

.1 TROJAN NUCLEAR PLANT 1

l Trojan Monthly Operating Report i

June 1993 OPERATIONS The reporting period began and ended with the plant defueled.

U L.-

-~

l l'

OPERATING DATA REPORT DOCKET No.

50-344 DATE A ly 1993 COMPLETED BY B. k. Hugo ggEATING STATUS:

TELEPHONE (H3) 556-5529 I 1. Unit Name Trojan Nuclear-Notes:

  • Cumulativo values Plant as of 3 p.m.

January 4 when Portland General Electric 2 Reporting Persod June 1993 Company's Board of Directors announced the permanent.

3. Licensed Thermal Nwer (MWt)

N/A closure of Trojan.

4, Nameplate Ratmg (Gross t%)

1216

5. Design Electrical katant. (Net tMe) 1130
6. Maximum Dependable Capacity F,ross MWe>

0

7. Maximum Dependable Capacity (Net fMe >

0 8.

If Changes Occur in Capacity Ratit.gs (Iten.s No. 3 Fossession-Only License received May 5, 1993.

thzough 7) Since Last Report, Gtve Reasons 9.

Power Level To Which hestricted. If Any INat fMe) 0 10, Reasons For Restrictions, I f Ar.y Fermar.ent Plant shutdown This Month Yr-to-Date Cumulative

11. Hours in Repart tr.s f eriod 720 4343 L43271'
12. Number of Hours Reacter Was Critical 0

0 85710'

13. *8.eactor Reserve Shutdown Hauts 0

0 5097'

14. 11ours Generator On-Line 0

0 83545'

15. Unit. Reserve Shutelawn Hours 0

0 4468*

16. Gross Thermal Energy Generat ed (tWH )

0 0

267291694' 17 Gross Electrical Energy Generated RMH) 0 0

68265599' 18, Net Elect rical f.nes sy Gei.e r at ed OMH ]

O O

63477241'

19. Unit Service fartor 0.0 0.0 58.3"
20. Unit Availabittty l ac t.c r 0.0 0.0 61.4*
21. Unit Capacity Factor (Ustug MDC Net) 0.0 0.0 54.2' l
22. Ur.it Capacity Facter (Uning LER Net) 0.0 0.0 51.6' l

j

[ 23. Unit. Forced Outage Rat e 0.0 100.0

13. T j

24 Ehut downs Scheduled Over Next b Hun th t.

(Type, N/A Dat e and Euration of Each)-

25. If Shut Down at Er.J c f Repor t Feta J.

N/A Estimated Date of Startup:

26, Units in Test Status (Frier to r%cuercial FORFCA97 ACHIEVED Operation):

INITIAL CKITICALITY N/A N/A INITIAL ELECTK! CITY N/A N/A C0t?!EkCIAL OFERATION N/A N/A 1

~ <

~

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-344 UNIT TROJAN DATE JULY 1993 COMPLETED BY B.

R.

HUGO TELEPHONE (503) 556-5529 l

MONTH: June, 1993 j

l I

DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

LEVEL (MWe-Net) 1 0

17 0

2 0

18 0

3 0

19 0

)

i 4

0 20 0

5 0

21 0

i 6

0 22 0

7 0

23 0

8 0

24 0

^j 9

0 25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 16 0

INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

.a-r.

.I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-344 UNIT NAME.

Troian DATE July. 1993 f

REPORT MONTH June. 1993 COMPLETED BY B. R Huno t

TELEPHONE-(503) 556-5529 I

l

[

i NO.

DATE TYPE

  • D'1 RATION EDCON' METSCD CF LICENSE SYSTD*

C m PONENT CAUSE & CORRECTIVE ACTION TO PREVENT KECtTdCNCE-HOURS SHUTTING EVENT CCCE' CODE' DOWN REPLET #

EEACTOR' 93-01 930106 720.0 2

Portland General Electric's Board of Directors voted to permanently cease Trojan operations on January 4, 1993.

i 4

4 f

I-t 1

h 4

l

1. F: Forced 2 EE.ASON:
3. METHOD:

4 IEEE Standard 805-1984 S: Scheduled I.

A-Equitment Failure (Explain) 1-Manual

5. IEEE Standard 803A-1983 S-Maintenance or Test 2-Manual Scram.

C-Refueling 3-Automatic Scram.

D-Regulatory Restriction

'4-Other (Explain)

E-Operator Training &

_ Licensing Examination F-Administrative G-Operational Error (Ex plain)

B-Other (Explain)

....w

<~s

.m.

.m