Portland General Electric Company Trojan Nuclear Plant 71760 Columbia River Hwy.
Rainier, Oregon 97048 (503) 556-3713 SMQ-051-93 July 7, 1993 Trojan Nuclear Plant Docket 50-344 License NPF-1 U.S.
Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sirs:
M_onthly Operatina Recor_t.
In accordance with the Trojan Nuclear Plant Technical Specifications reporting requirements, the Monthly Operating Report is submitted for June 1993.
Sincerely, d n1 S.
M.
Quennoz General Manager Trojan Nuclear Plant Attachment c:
Mr. Bobby H.
Faulkenberry Regional Administrator, Region V U.S.
Nuclear Regulatory Commission Mr. David Stewart-Smith State of Oregon Department of Energy Mr.
J.
F.
Melfi USNRC Resident Inspector Trojan Nuclear Plant 1 G I) O O 7 Ohk o$00@44 g
761Y PDR g
lfy
1 c
..a Trdjan Nuclear Plant Document Control Desk Docket 50-344 July 7,-1993 License NPF-1 Attachment 4 pages
.1 TROJAN NUCLEAR PLANT 1
l Trojan Monthly Operating Report i
June 1993 OPERATIONS The reporting period began and ended with the plant defueled.
U L.-
-~
l l'
OPERATING DATA REPORT DOCKET No.
50-344 DATE A ly 1993 COMPLETED BY B. k. Hugo ggEATING STATUS:
TELEPHONE (H3) 556-5529 I 1. Unit Name Trojan Nuclear-Notes:
- Cumulativo values Plant as of 3 p.m.
January 4 when Portland General Electric 2 Reporting Persod June 1993 Company's Board of Directors announced the permanent.
- 3. Licensed Thermal Nwer (MWt)
N/A closure of Trojan.
4, Nameplate Ratmg (Gross t%)
1216
- 5. Design Electrical katant. (Net tMe) 1130
- 6. Maximum Dependable Capacity F,ross MWe>
0
- 7. Maximum Dependable Capacity (Net fMe >
0 8.
If Changes Occur in Capacity Ratit.gs (Iten.s No. 3 Fossession-Only License received May 5, 1993.
thzough 7) Since Last Report, Gtve Reasons 9.
Power Level To Which hestricted. If Any INat fMe) 0 10, Reasons For Restrictions, I f Ar.y Fermar.ent Plant shutdown This Month Yr-to-Date Cumulative
- 11. Hours in Repart tr.s f eriod 720 4343 L43271'
- 12. Number of Hours Reacter Was Critical 0
0 85710'
- 13. *8.eactor Reserve Shutdown Hauts 0
0 5097'
- 14. 11ours Generator On-Line 0
0 83545'
- 15. Unit. Reserve Shutelawn Hours 0
0 4468*
- 16. Gross Thermal Energy Generat ed (tWH )
0 0
267291694' 17 Gross Electrical Energy Generated RMH) 0 0
68265599' 18, Net Elect rical f.nes sy Gei.e r at ed OMH ]
O O
63477241'
- 19. Unit Service fartor 0.0 0.0 58.3"
- 20. Unit Availabittty l ac t.c r 0.0 0.0 61.4*
- 21. Unit Capacity Factor (Ustug MDC Net) 0.0 0.0 54.2' l
- 22. Ur.it Capacity Facter (Uning LER Net) 0.0 0.0 51.6' l
j
[ 23. Unit. Forced Outage Rat e 0.0 100.0
- 13. T j
24 Ehut downs Scheduled Over Next b Hun th t.
(Type, N/A Dat e and Euration of Each)-
- 25. If Shut Down at Er.J c f Repor t Feta J.
N/A Estimated Date of Startup:
26, Units in Test Status (Frier to r%cuercial FORFCA97 ACHIEVED Operation):
INITIAL CKITICALITY N/A N/A INITIAL ELECTK! CITY N/A N/A C0t?!EkCIAL OFERATION N/A N/A 1
~ <
~
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-344 UNIT TROJAN DATE JULY 1993 COMPLETED BY B.
R.
HUGO TELEPHONE (503) 556-5529 l
MONTH: June, 1993 j
l I
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
LEVEL (MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
)
i 4
0 20 0
5 0
21 0
i 6
0 22 0
7 0
23 0
8 0
24 0
^j 9
0 25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 16 0
INSTRUCTIONS:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
.a-r.
.I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-344 UNIT NAME.
Troian DATE July. 1993 f
REPORT MONTH June. 1993 COMPLETED BY B. R Huno t
TELEPHONE-(503) 556-5529 I
l
[
i NO.
DATE TYPE
- D'1 RATION EDCON' METSCD CF LICENSE SYSTD*
C m PONENT CAUSE & CORRECTIVE ACTION TO PREVENT KECtTdCNCE-HOURS SHUTTING EVENT CCCE' CODE' DOWN REPLET #
EEACTOR' 93-01 930106 720.0 2
Portland General Electric's Board of Directors voted to permanently cease Trojan operations on January 4, 1993.
i 4
4 f
I-t 1
h 4
l
- 1. F: Forced 2 EE.ASON:
- 3. METHOD:
4 IEEE Standard 805-1984 S: Scheduled I.
A-Equitment Failure (Explain) 1-Manual
C-Refueling 3-Automatic Scram.
D-Regulatory Restriction
'4-Other (Explain)
E-Operator Training &
_ Licensing Examination F-Administrative G-Operational Error (Ex plain)
B-Other (Explain)
....w
<~s
.m.
.m