MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2251997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20198M2331997-11-30030 November 1997 Corrected Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9171997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Point Beach Nuclear Plant,Units 1 & 2 NPL-97-0715, Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 21997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9361997-10-31031 October 1997 Revised Monthly Operating Rept for Oct 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0621, Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 21997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9311997-09-30030 September 1997 Revised Monthly Operating Rept for Sept 1997 for Point Beach Nuclear Plant,Unit 2 NPL-97-0553, Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 21997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20203F9261997-08-31031 August 1997 Revised Monthly Operating Rept for Aug 1997 for Point Beach Nuclear Plant,Unit 2 ML20210H9531997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20210H9601997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for Point Beach Nuclear Plant,Units 1 & 2,which Provides Corrected Forced Outage Rates NPL-97-0318, Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 21997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Point Beach Nuclear Plant,Unit 1 & 2 ML20141C2381997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20141C2461997-03-31031 March 1997 Corrected Operating Data Rept for Mar 1997 for Point Beach Nuclear Plant,Unit 1 ML20137P5781997-03-31031 March 1997 Monthly Operating Repts for March 1997 for Point Beach Nuclear Plant Units 1 & 2 ML20137P5711997-02-28028 February 1997 Corrected MOR for Feb 1997 for Point Beach Nuclear Plant Unit 1 ML20135F2721997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for Point Beach Nuclear Plant,Units 1 & 2 ML20134J8711997-01-31031 January 1997 Monthly Operating Repts for Jan 1996 for Point Beach Nuclear Plant,Units 1 & 2 ML20135F2771997-01-31031 January 1997 Revised Monthly Operating Rept for Jan 1997 for Point Beach Nuclear Plant,Unit 2 ML20133N0601996-12-31031 December 1996 Revised MOR Rept for Dec 1996 for Point Beach Nuclear Plant, Units 1 & 2 ML20133F6471996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Point Beach Nuclear Plant,Unit 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARNPL-99-0569, Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with1999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Pbnp,Units 1 & 2. with ML20212D5961999-09-15015 September 1999 Safety Evaluation Supporting Licensee IPEEE Process.Plant Has Met Intent of Suppl 4 to GL 88-20 NPL-99-0051, Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with1999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Pbnp,Units 1 & 2. with NPL-99-0449, Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with1999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Pbnp,Units 1 & 2. with ML20196J4251999-06-30030 June 1999 Safety Evaluation Authorizing Proposed Alternatives Described in Relief Requests VRR-01,ROJ-16,PRR-01 & VRR-02 ML20209D2691999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Pbnps,Units 1 & 2 ML20196F3341999-06-22022 June 1999 Safety Evaluation for Implementation of 422V+ Fuel Assemblies at Pbnp Units 1 & 2 ML20195F9781999-06-10010 June 1999 Unit 2 Refueling 23 Inservice Insp Summary Rept for Form NIS-1 ML20209D2751999-05-31031 May 1999 Revised MORs for May 1999 for Pbnps,Units 1 & 2 NPL-99-0328, Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with1999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Pbnp,Units 1 & 2. with NPL-99-0273, Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With1999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Point Beach Nuclear Plant,Units 1 & 2.With ML20196F3521999-04-30030 April 1999 Non-proprietary WCAP-14788, W Revised Thermal Design Procedure Instrument Uncertainty Methodology for Wepc Point Beach Units 1 & 2 (Fuel Upgrade & Uprate to 1656 Mwt - NSSS Power) NPL-99-0193, Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with1999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Pbnp,Units 1 & 2. with NPL-99-0134, Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with1999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Pbnp,Units 1 & 2. with ML20207D6751999-02-22022 February 1999 Assessment of Design Info on Piping Restraints for Point Beach Nuclear Plant,Units 1 & 2.Staff Concludes That Licensee Unable to Retrieve Original Analyses That May Have Been Performed to Justify Removal of Shim Collars ML20206R9001999-01-13013 January 1999 SER Accepting Nuclear Quality Assurance Program Changes for Point Beach Nuclear Plant,Units 1 & 2 NPL-99-0008, Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with1998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Pbnp,Units 1 & 2. with NPL-99-0091, 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with1998-12-31031 December 1998 1998 Annual Results & Data Rept for Pbnps,Units 1 & 2. with ML20198C7671998-12-10010 December 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME BPV Code,1986 Edition,Section XI Requirement IWA-2232, to Use Performance Demonstration Initiative Program During RPV Third 10-yr ISI for Plant,Unit 2 NPL-98-1006, Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20195J5101998-11-16016 November 1998 Proposed Revs to Section 1.3 of FSAR for Pbnp QA Program ML20198J5941998-11-0303 November 1998 1998 Graded Exercise,Conducted on 981103 NPL-98-0948, Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Point Beach Nuclear Plant,Units 1 & 2.With NPL-98-0880, Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored1998-10-21021 October 1998 Special Rept:On 980913,fire Alarm Control Panels Inoperable for More That Fourteen Days.Troubleshooting of D-401 Panel Following Installation of Replacement Batteries Revealed No Apparent Cause for Spurious Alarms.Panel D-401 Restored ML20154M9121998-10-14014 October 1998 Unit 1 Refueling 24 Repair/Replacement Summary Rept for Form NIS-2 ML20154L6751998-10-14014 October 1998 Unit 1 Refueling 24 ISI Summary Rept for Form NIS-1 NPL-98-0826, Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With1998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Point Beach Nuclear Plant,Units 1 & 2.With ML20151W3851998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Pbnp Units 1 & 2 NPL-98-0653, Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 21998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4471998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 2 ML20151W4541998-07-31031 July 1998 Corrected Page to MOR for July 1998 for Pbnp Unit 1 ML20236Q3161998-07-10010 July 1998 Safety Evaluation Accepting Licensee Proposed Alternative to ASME Code Requirements PTP-3-01 & PTP-3-02 ML20236L6771998-07-0707 July 1998 Safety Evaluation Approving Wepco Implementation Program to Resolve USI A-46 at Point Beach NPP Units 1 & 2 NPL-98-0558, Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 21998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Pbnp,Units 1 & 2 ML20151W4261998-06-30030 June 1998 Corrected Page to MOR for June 1998 for Pbnp Unit 2 ML20151W4221998-05-31031 May 1998 Corrected Page to MOR for May 1998 for Pbnp Unit 2 NPL-98-0481, Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 21998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W4011998-04-30030 April 1998 Corrected Page to MOR for April 1998 for Pbnp Unit 2 NPL-98-0356, Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 21998-04-30030 April 1998 Monthly Operating Repts for April 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20217F3131998-04-17017 April 1998 Safety Evaluation Accepting Proposed Alternative to ASME Code for Surface Exam of Nonstructural Seal Welds,For Plant, Unit 1 ML20216D7071998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3981998-03-31031 March 1998 Corrected Page to MOR for March for Pbnp Unit 2 NPL-98-0209, Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable1998-03-30030 March 1998 Special Rept Re Fire Barrier Inoperable for Greater than Seven Days.Compensatory Measures Implemented in Accordance W/Fire Protection Program Requirements During Time That Barriers Were Inoperable ML20217A8501998-03-19019 March 1998 SER Accepting Proposed Changes Submitted on 980226 by Wiep to Pbnp Final SAR Section 1.8 Which Will Impact Commitments Made in Pbnp QA Program Description.Changes Concern Approval Authority for Procedures & Interviewing Authority ML20216J0101998-03-17017 March 1998 Safety Evaluation Accepting Third 10-yr Inservice Insp Interval Relief Request RR-1-18 for Plant NPL-98-0159, Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 21998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20151W3891998-02-28028 February 1998 Corrected Page to MOR for Feb 1998 for Pbnp Unit 2 ML20216D7121998-02-28028 February 1998 Revised Corrected MOR for Feb 1998 for Point Beach Nuclear Plant,Unit 2 NPL-98-0084, Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 21998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Point Beach Nuclear Plant,Units 1 & 2 ML20198L1151998-01-0808 January 1998 SER Accepting Licensee Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Point Beach Nuclear Plant,Units 1 & 2 1999-09-30
[Table view] |
Text
.... ...
Wisconsin 1
Electnc POWER COMPAtN 231 w rAe,oon t>o wu ;oa twoaee a 53n M14) 2212345 VPNPD-93-126 NRC-93-083 July 7, 1993 Document Control Desk U.S. NUCLEAR REGULATORY COMMISSION Mail Station P1-137 Washington, DC 20555 Gentlemen:
DOCKEl'S 50-266 AND 50-3 01 liONTHLY OPERATING REPORTS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 Attached are monthly operating reports for Units 1 and 2 of the Point Beach Nuclear Plant for the calendar month of June 1993.
Sincerely, x ,f u-
~
Bob Link Vice President Nuclear Power MFB/jg cc: L. L. Smith, PSCW NRC Regional Administrator, Region III NRC Resident Inspector
'I i
130006 i 9307140134 930707 PDR ADOCK 05000266 y N
A sukauroflikm&Lewnepwim
[
R PDR g t fj(
'1 "
OPERATING DATA. REPORT DOCKET NO. 50-266 DATE: 07/02/93 COMPLETED BY: Richard F. Arnold TELEPHONE: (414)755-6193 OPERATING STATUS
- 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 1
- 2. REPORTING PERIOD: June - 1993 . .
- 3. LICENSED THERMAL POWER (MWT): 1518.5 . .
l
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE): 497.0 . .
- 6. MAXIMUM DEPENDABLE CAPADITY (GROSS MWE): 509.0 . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . . . . . . .
'8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 4,343.0 198,551.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 3,418.6 164,301.9
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 667.3
- 14. HOURS GENERATOR ON LINE 720.0 3,383.8 161,223.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 846.9
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,084,491 5,048,797 226,785,770
- 17. GROSS ELECTRICAL ENERGY GENERATED 368,950 1,709,630 76,586,030
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 353,066 1,633,639 72,985,802
- 19. UNIT SERVICE FACTOR 100.0% 77.9i 81.2%
-20. UNIT AVAILABILITY-FACTOR 100.0% 77.9% 81.6%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 101.1% 77.6% 75.4%
- 22. UNIT CAPACITY FACTOR (USING DER NET) 98.7% 75.7%. 74.0%
- 23. UNIT FORCED OUTAGE RATE 0.0% 0.0% 1.6%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF'EACH):
NONE
- 25. IF SHUTDOWN AT END 41F REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED'IN NRC LETTER DATED SEPTEMBER 22,~1977 se.- _ _ aen a s- t d- w fsur1 w- 1 e we v w-' e w * *W-er m- _ _ - - - -
e a & -' -- r* - -_________m__2._o____ _ _ . _ __-m s._._ --
PGINT BEACH NUCLEAR PLANT DOCKET NO. 50-266 AVERAGE DAILY UNTT POWER LEVEL UNrr NAME Point Beach, Unit I ;_
f MONTli JUNE - 1903 DATE July 1.1093
. COMPLETED BY R. F. AmW TELEPHONE 414n55-6193 AVERAGE AVERAGE AVERAGE DAILY DAILY DAILY POWER LEVEL POWER LEVEL POWER LEVEL
- DAY MWe NET DAY MWe NET DAY MWe NET 1 492 11. 494 21 494 2 495 12 369 22 495 3 495 13 489 23 - 493 4
4 495' 14 495 24 494 5 496 15 4% 25 496 6 496 16 496 26 494 l
7 496 -
17 496 27 496 -
8 495 18 495 28 494 '
9 494 19 495 29 493 10 495 20 496 30 492 i
i i
i a
PBr~0025a (03-90) ,
,__a. y y y , .%.i- W = - , . an = a w=- T- ~r == y -- '____m_ - - _ _ _ - - _ _ _ _
q POINT BEACH. NUCLEAR PLANT Docket No. 50-266 Unit Name Point Beach. Unit 1 UNIT SIIUTDOWNS AND IV)WER REDI.?CTIONS Date July 2.1993
^.
Completed By R. F. Amold y REPORT MONTH M AY - 1993 Telephone No. 414r755-6193 Mettux! of Shutting No. Date Type' Duration Reason
- Down Ucensee Event System Congonent Cause and Cormtive Action 2 6-12-93 F 0 B 5 NA HH PUMPB Observed leakage of the condensate pump casing initiated a load reduction to 300 MWe for pung
, inspection and repair.
F: Formi 2
. Reason: . ' Method: / Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of .y B - Maintenance or Testing 2 - Manual Scram ' data entry sheets
- C - Refueling 3 - Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of.
. E - Operator Training & .
Previous Shutdown Licensing Exam 5 - Reduced Load F - Administrative 6 - Other (explain) 5 Exhibit I - Same Source G - Operational Error (explain)
H - Other (explain) '
PBF-CD28b
-(03-90) .
' DOCKET No. 50-266 UNIT NAME Point Beach Unit 1 DATE July 2, 1993
. COMPLETED BY R. F. Arnold ,
TELEPHONE 414/755-6193 f
Unit 1 operated at approximately 490 MWe net for-the report period with one significant load reduction to facilitate the inspection and temporary repair of a casing leak on one of the main condensate pumps.
Safety-related maintenance included:
- 1. Replaced service water pump P32F. ,
- 2. Installed amptector and disabled discriminator circuit on B52-23C, supply breaker to primary auxiliary building .
safeguards motor. control center.
- 3. Replaced sp'eed control card for the turbine independent overspeed protection channel "C". t 1
3 l
l
.- 1 e
, + - , - , , ~ , - .,. , . , , ,,. r-- , ,,
7 OPERATING DATA REPORT DOCKET NO. 50-301 .
DATE: 07/02/93 COMPLETED BY: Richard F. Arnold TELEPHONE: (414)755-6193 OPERATING STATUS
] 1. UNIT NAME: POINT BEACH NUCLEAR PLANT - UNIT 2 . NOTES .
- 2. REPORTING PERIOD: June - 1993 . .
- 3. LICENSED THERMAL POWER (MWT): 1518.5 . .
- 4. NAMEPLATE RATING (GROSS MWE): 523.8 . .
- 5. DESIGN ELECTRICAL RATING (NET MWE}: 497.0 . .
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE): 509.0 . .
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE): 485.0 . . . . . . . . . . . . . . . . . .
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:
NA
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (NET MWE): NA
- 10. REASONS FOR RESTRICTIONS, (IF ANY):
NA THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD 720.0 4,343.0 183,336.0
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 720.0 4,330.7 160,606.6
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 4.0 233.9
- 14. HOURS GENERATOR ON LINE 720.0 4,322.3 158,304.8 i 302.2
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0
- 16. GROSS THEREAL ENERGY GENERATED (MWH) 1,071,687 6,452,997 227,099,258
< 17. GROSS ELECTRICAL ENERGY GENERATED 373,000 2,219,590 77,219,710
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 356,671 2,124,612 73,611,019
- 19. UNIT SERVICE FACTOR 100.0% 99.5% 86.3%
- 20. UNIT AVAILABILITY FACTOR 100.0% 99.5% 86.5%
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.1% 100.9% 82.2%
- 22. UNIT CAPACITY FACIOR (USING DER NET) 99.7% 98.4% 80.8%
- 23. UNIT FORCED OUTAGE RATE 0.0% 0.5% 1.0%
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):
Refueling Outage, 9/25/93, 42 days
- 25. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
NA DATA REPORTED AND FACTORS CALCULATED AS REQUESTED IN NRC LETTER DATED SEPTEMBER 22, 1977
POINT BEACH NUCLEAR PLANT DOCKET NO. 50-301 AVERAGE DAILY UNIT POWER LEVEL UNIT NAME Poir:t Besch'. Unit 2 f.
MONTri JUNE - 1993 DATE July 1.1993 1
l - COMPLETED BY R. F. Amold i TELEPHONE 414/755 4 193 -
l i
, AVERAGE AVERAGE AVERAGE
- f. DAILY DAILY DAILY-l .
. POWER LEVEL POWER LEVEL POWER LEVEL DAY MWe NET DAY MWe NET DAY MWe NET 1 496 11 496 21 495 2 495 12 499 22 495 3 495 13 491 23 464 4 495 14 497 24 494 i- 5 495 15 497 25 495 6 497 16 496 26 494
. 7 496 17 497 27 496 8 496' 18 495 28 495 9 497 19 496 29 -493 10 497 20 496- 30 492 PBF@28a (03-90)
_ _ - _ . . _ - _ _ _ _ _ . . . - - _ - - - . _ - - - - . _ _ , _ _ _ _ _ _ _ , _ _ , . _ _ _ _ _ - _ _ _ Y- ,k q -- - s ,
+n- - -
y wr-f T "Yv r'-
POIhT BEACH NUCLEAR PLANT - Docket No. 50-301 .,
Unit Name Point Beach. Unit 2 INrr SilUTDOWNS AND POWER REDUCTIONS Date July 2.1993 Completed By R. F. Arnold --
c.
REPORT MONTH JUNE - 1993 Telephone No. 414 0 55-6193 i'
Method of Shuning Duration % Licensee Event System Component Cause ami Corrective Action No. Date Type' (Hours) Reasod p,,g Report No. Code' Code' To Prevent Recurrence NA NA NA NA NA NA NA NA NA F: Forced 2 Reason: ' Method: ' Exhibit G - Instructions S: Scheduled A - Equipment Failure (explain) 1 - Manual for preparation of
~
B - Maintenance or Testing - 2 - Manual Scram data entry sheets C - Refueling 3 -' Automatic Scram LER file (NUREG-0161)
D - Regulatory Restriction 4 - Continuation of
- E - Operator Training & Previous Shutdown ,
Licensing Exam 5 - Reduced Load F - Arirninistrative 6 - Other (explain) 5 Exhibit I - Same Source G - Operational Ermr (explain)
- H - Other (explain)
PBF4028b ,
(0300)
s.. _ ..._.. .. _ . . . ~ - _
..% 'r.;.
t DOCKET NO. 50-301 UNIT NAME Point Beach Unit 2 DATE- July 2, 1993 j COMPLETED BY R. F. Arnold i TELEPHONE 414/755-6193 Unit 2 operated at approximately 495 MWe net throughout the report period with no significant load reductions.
Safety-related maintenance included:
- 1. Installed amptectors and disabled discrimin tor circuits on BS2-32C and B52-388, supply breakers to the primary auxiliary I
building safeguards motor control conter.
- 2. Replaced "A" reactor coolant loop flow low oistable.
- 3. Replaced the input block and chord on a hyh ogen monitor input EMF /E converter module.
- 4. Replaced the steam trap inlet valve for auxiliary feed pump (P29) motor operated steam supply valve.
- 5. Replaced the core exit TC temperature input EMF /E converter module.
l e
l
. .l
. i !!
l!!
n 4
n
'