Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000397/LER-1987-025, :on 870808,ESF Isolations & Actuations Occurred.Caused by Spurious Trip of Breaker Due to Oxide Formation on Coil Plunger End of Undervoltage Relay Coil. Breakers Replaced + (ML17279A621)
- ML17279A623 + (ML17279A623)
- ML17279A624 + (ML17279A624)
- ML17279A625 + (ML17279A625)
- GO2-87-273, Responds to NRC Re Violations Noted in Insp Rept 50-397/87-26.Corrective Actions:On 870901,util Submitted Request for Amend to Tech Specs (Table 3.3.2-2) to Raise Main Steam Tunnel Temp Trip Setpoint to 164 F + (ML17279A637)
- GO2-87-275, Application for Amend to License NPF-21,changing Tech Spec Page 3/4 3-12 Correcting Inaccuracies/Inconsistencies in Items 1.d,1.c.3 & 1.e.Fee Paid + (ML17279A638)
- ML17279A639 + (ML17279A639)
- ML17279A641 + (ML17279A641)
- GO2-86-076, Application for Amend to License NPF-21,modifying Tech Spec 3/4.3.8 to Revise Turbine Valve Test Interval from Weekly to Monthly.Fee Paid + (ML17279A642)
- ML17279A644 + (ML17279A644)
- ML17279A645 + (ML17279A645)
- ML17279A648 + (ML17279A648)
- GO2-86-370, Forwards XN-NF-85-138(P), LOCA Break Spectrum Analysis for BWR 5 & Affidavit for Withholding,In Support of Request for Amend to Tech Specs Re Cycle 2 Reload.W/O Rept + (ML17279A649)
- GO2-87-278, Application for Amend to License NPF-21,modifying Snubber Functional Testing Sampling Plans,Per Guidelines of Draft Ansi/Asme - OM-4 Document, Exam & Performance Testing of Nuclear Power Plant Dynamic Restraints. Fee Paid + (ML17279A658)
- ML17279A659 + (ML17279A659)
- ML17279A660 + (ML17279A660)
- ML17279A662 + (ML17279A662)
- ML17279A665 + (ML17279A665)
- ML17279A666 + (ML17279A666)
- ML17279A672 + (ML17279A672)
- ML17279A675 + (ML17279A675)
- ML17279A676 + (ML17279A676)
- ML17279A679 + (ML17279A679)
- ML17279A680 + (ML17279A680)
- ML17279A681 + (ML17279A681)
- ML17279A682 + (ML17279A682)
- GO2-86-367, Provides Supplemental Info Re 860226 Reload Summary Rept Concerning Changes in Expected Cycle 2 Reload Batch.Meeting Requested to Address NRC Concerns w/860520 Restart Date + (ML17279A692)
- ML17279A693 + (ML17279A693)
- ML17279A694 + (ML17279A694)
- ML17279A696 + (ML17279A696)
- ML17279A700 + (ML17279A700)
- ML17279A702 + (ML17279A702)
- ML17279A708 + (ML17279A708)
- IR 05000397/1987029 + (ML17279A710)
- 05000397/LER-1987-030, :on 871106,upgraded Plant Tech Spec Fire Wall Not Constructed to Qualify as 3 H Fire Barrier & Wall Penetration Not Sealed.Cause Unknown.Engineering Evaluation of Wall & Penetration Will Be Conducted + (ML17279A714)
- RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change + (ML17279A715)
- ML17279A718 + (ML17279A718)
- ML17279A720 + (ML17279A720)
- ML17279A724 + (ML17279A724)
- IR 05000397/1987028 + (ML17279A726)
- GO2-87-282, Forwards Feedwater Nozzle Insp Rept for Refueling Outage RF87A,Spring 1987, Per NUREG-0619 Requirements + (ML17279A727)
- ML17279A728 + (ML17279A728)
- ML17279A730 + (ML17279A730)
- ML17279A732 + (ML17279A732)
- ML17279A734 + (ML17279A734)
- ML17279A735 + (ML17279A735)
- ML17279A740 + (ML17279A740)
- ML17279A742 + (ML17279A742)
- GO2-87-290, Forwards Final Response to IE Bulletin 85-003 Per .Responses to Items a Through E Have Been Changed to Reflect Addition of & Uses of Movats,Inc Test Equipment + (ML17279A743)
- GO2-87-288, Requests Extension to Required Response Time to 880205 for Responding to Violations Noted in Insp Rept 50-397/87-19,per 871216 Telcon + (ML17279A744)
- GO2-87-289, Responds to Violation Noted in Insp Rept 50-397/86-25 Re Failure to Follow Procedures That Implemented Fire Protection Program.Special fire-rated Window Will Be Installed in Shift Manager Ofc by 880430 + (ML17279A747)