Semantic search

Jump to navigation Jump to search
 Issue dateFromTitleProject stage
ML21319A35429 November 2021Benjamin Beasley
NRC/NRR/DANU/UARL
Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLCAcceptance Review
ML22024A49210 January 2022NRCHermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1Request
ML22198A00119 January 2022
25 January 2022
Summary of 21Jan2022 Phone Conversation W City of Oak Ridge Public WorksRequest
ML22028A0022 February 2022Office of Nuclear Material Safety and Safeguards
Tami Dozier
Kairos Hermes Environmental Audit PlanOther
ML22041A3373 February 2022Hastings P
Kairos Power
Kairos Power LLC, Transmittal of Responses-to NRC Questions 2.3-1 and 2.3-2 on the Hermes Preliminary Safety Analysis ReportRequest
ML21364A0138 February 2022Benjamin Beasley
NRC/NRR/DANU/UARL
Kairos Power LLC - Application for Construction Permit for Hermes Test ReactorOther
ML22040A3369 February 2022Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit ApplicationRequest
ML22040A3389 February 2022Kairos PowerKairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit ApplicationOther
ML22042A09510 February 2022Kairos Power LLC, Transmittal of Changes to Hermes Construction Permit ApplicationRequest
ML21204A03915 February 2022Kenneth Erwin
NRC/NMSS/DREFS/ENRB
Federal Register Notice of Intent to Conduct Scoping and Prepare an EIS - Kairos Hermes CP ReviewRequest
ML22039A22617 February 2022William Kennedy
NRC/NRR/DANU/UARL
Audit Plan for the Kairos Hermes Preliminary Safety Analysis Report (PSAR) Section 6.3 Decay Heat Removal System - February 2022Other
ML21326A05918 February 2022Kenneth Erwin
NRC/NMSS/DREFS/ENRB
Kairos Hermes CP Review - Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact StatementOther
ML22106A00028 February 2022US Dept of Defense (DOD)
Secretary
Construction and Demonstration of a Prototype Mobile Microreactor Feis: Reference for Kairos Hermes CP ApplicationOther
ML22060A2721 March 2022Hastings P
Kairos Power
Kairos Power, LLC, Transmittal of Changes to Maximum Hypothetical Accident Dose Results in Hermes Construction Permit ApplicationRequest
ML22031A28910 March 2022Kenneth Erwin
NRC/NMSS/DREFS/ENRB
Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit ReviewRequest
ML22088A29411 March 2022Mcintyre E
State Of TN
Historical Commission
Scoping Comment (3) from Tennessee Historical Commission Kairos Hermes CP Application ReviewOther
ML22089A1668 April 2022William Kennedy
NRC/NRR/DANU/UARL
Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011)Other
ML22169A00912 April 2022US Dept of Interior
National Park Service
Kirby K
NPS Scoping Comments on Kairos Test ReactorRequest
ML22107A00617 April 2022Oak Ridge
Freeny L
Professional Project Services
Oak Ridge Reservation Annual Site Environmental Report 2017: Reference for Kairos Hermes CP ApplicationOther
ML22115A20422 April 2022Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes Environmental ReportRequest
ML22117A21522 April 2022
27 April 2022
Kairos Power LLC, Transmittal of Supplemental Information for NRC Information Need HCUL-10 for the Hermes Environmental ReviewRequest
ML22117A21827 April 2022Kairos Power LLC, Transmittal of Changes to Hermes Environmental Report Resulting from NRC Environmental Review AuditRequest
ML22110A0185 May 2022Benjamin Beasley
NRC/NRR/DANU
Kairos Power LLC, Summary of March 23, 2022, Public Outreach Meeting on the Proposed Kairos Hermes Test Reactor with Designated Period for Receipt of Environmental Scoping CommentsRequest
ML22143B01627 May 2022William Kennedy
NRC/NRR/DANU/UARL
Audit Plan for Hermes Site Characteristics PSAR Chapter 2Other
ML22181B15730 June 2022Kairos Power LLC Transmittal of Changes to Construction Permit ApplicationRequest
ML22194A0141 August 2022
31 August 2022
Kairos Hermes Construction Permit Application - Issuance of Environmental Scoping Summary ReportRequest
ML22230D0765 August 2022Benjamin Beasley
NRC/NRR/DANU/UAL1
Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas SystemOther
ML22227A1808 August 2022Benjamin Beasley
NRC/NRR/DANU/UAL1
Final RAI 348 on Shutdown Rod ReliabilityRAI
ML22196A38724 August 2022Kairos Hermes CP Review - Environmental Audit ReportRequest
ML22272A59329 September 2022Kairos Power, LLC - Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1Request
ML23019A3606 November 2022
15 November 2022
Kairos Power LLC, Additional Information Related to Construction Permit Application - PSAR Chapter 1Request
ML23019A36115 November 2022Hastings P
Kairos Power
Kairos Power LLC, Additional Information Related to Construction Permit Application - PSAR Chapter 1Other
ML22329A01116 November 2022NRC Region 1Deis Public Meeting Transcript for Kairos Hermes Construction Permit ApplicationMeeting
ML22311A55316 November 2022Benjamin Beasley
Peyton Doub
Office of Nuclear Material Safety and Safeguards
Office of Nuclear Reactor Regulation
Tami Dozier
Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test ReactorRequest
ML22342B2828 December 2022Hastings P
Kairos Power
Kairos Power LLC, Transmittal of Reponses to NRC Question on Hermes Preliminary Safety Analysis ReportRequest
ML22353A62519 December 2022Hastings P
Kairos Power
Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 6 and Response to NRC Question on Dhrs TestingRequest
ML23055A67224 February 2023
28 February 2023
Kairos Power LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 2Request
ML23031A16521 March 2023Tami Dozier
NRC/NMSS/DREFS/ENRB
Kairos Attendance ListRequest
ML23031A16021 March 2023Tami Dozier
NRC/NMSS/DREFS/ENRB
Summary of Public Meeting for the Draft Environmental Impact Statement for the Kairos Hermes Test Reactor Construction Permit Application
ML23151A74331 May 2023Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3Request
ML23158A26613 June 2023Mohamed Shams
NRC/NRR/DANU/UNPL
Transmittal of Safety Evaluation for Hermes Construction Permit ApplicationApproval
ML23158A26513 June 2023Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes Non-Power Test ReactorRequest
ML23158A26813 June 2023NRC/NRR/DANU/UNPLSafety Evaluation for Hermes Construction Permit ApplicationApproval
ML23181A10718 July 2023Cuadrado De Jesus S
NRC/NRR/DANU/UAL1
Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis ReportMeeting
ML23353A0695 January 2024NRC/NMSS/DREFS/ENRB
Doub J
Kairos Power, LLC-Hermes 2-Environmental Report Audit PlanOther