Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML21319A354 | 29 November 2021 | Benjamin Beasley NRC/NRR/DANU/UARL | Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLC | Acceptance Review |
ML22024A492 | 10 January 2022 | NRC | Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 | Request |
ML22198A001 | 19 January 2022 25 January 2022 | Summary of 21Jan2022 Phone Conversation W City of Oak Ridge Public Works | Request | |
ML22028A002 | 2 February 2022 | Office of Nuclear Material Safety and Safeguards Tami Dozier | Kairos Hermes Environmental Audit Plan | Other |
ML22041A337 | 3 February 2022 | Hastings P Kairos Power | Kairos Power LLC, Transmittal of Responses-to NRC Questions 2.3-1 and 2.3-2 on the Hermes Preliminary Safety Analysis Report | Request |
ML21364A013 | 8 February 2022 | Benjamin Beasley NRC/NRR/DANU/UARL | Kairos Power LLC - Application for Construction Permit for Hermes Test Reactor | Other |
ML22040A336 | 9 February 2022 | Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application | Request | |
ML22040A338 | 9 February 2022 | Kairos Power | Kairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application | Other |
ML22042A095 | 10 February 2022 | Kairos Power LLC, Transmittal of Changes to Hermes Construction Permit Application | Request | |
ML21204A039 | 15 February 2022 | Kenneth Erwin NRC/NMSS/DREFS/ENRB | Federal Register Notice of Intent to Conduct Scoping and Prepare an EIS - Kairos Hermes CP Review | Request |
ML22039A226 | 17 February 2022 | William Kennedy NRC/NRR/DANU/UARL | Audit Plan for the Kairos Hermes Preliminary Safety Analysis Report (PSAR) Section 6.3 Decay Heat Removal System - February 2022 | Other |
ML21326A059 | 18 February 2022 | Kenneth Erwin NRC/NMSS/DREFS/ENRB | Kairos Hermes CP Review - Notice of Intent to Conduct Scoping Process and Prepare an Environmental Impact Statement | Other |
ML22106A000 | 28 February 2022 | US Dept of Defense (DOD) Secretary | Construction and Demonstration of a Prototype Mobile Microreactor Feis: Reference for Kairos Hermes CP Application | Other |
ML22060A272 | 1 March 2022 | Hastings P Kairos Power | Kairos Power, LLC, Transmittal of Changes to Maximum Hypothetical Accident Dose Results in Hermes Construction Permit Application | Request |
ML22031A289 | 10 March 2022 | Kenneth Erwin NRC/NMSS/DREFS/ENRB | Request to Initiate Section 106 Consultation and Scoping Process for Kairos Power Hermes Non-Power Test Reactor Construction Permit Review | Request |
ML22088A294 | 11 March 2022 | Mcintyre E State Of TN Historical Commission | Scoping Comment (3) from Tennessee Historical Commission Kairos Hermes CP Application Review | Other |
ML22089A166 | 8 April 2022 | William Kennedy NRC/NRR/DANU/UARL | Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011) | Other |
ML22169A009 | 12 April 2022 | US Dept of Interior National Park Service Kirby K | NPS Scoping Comments on Kairos Test Reactor | Request |
ML22107A006 | 17 April 2022 | Oak Ridge Freeny L Professional Project Services | Oak Ridge Reservation Annual Site Environmental Report 2017: Reference for Kairos Hermes CP Application | Other |
ML22115A204 | 22 April 2022 | Kairos Power, LLC, Transmittal of Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes Environmental Report | Request | |
ML22117A215 | 22 April 2022 27 April 2022 | Kairos Power LLC, Transmittal of Supplemental Information for NRC Information Need HCUL-10 for the Hermes Environmental Review | Request | |
ML22117A218 | 27 April 2022 | Kairos Power LLC, Transmittal of Changes to Hermes Environmental Report Resulting from NRC Environmental Review Audit | Request | |
ML22110A018 | 5 May 2022 | Benjamin Beasley NRC/NRR/DANU | Kairos Power LLC, Summary of March 23, 2022, Public Outreach Meeting on the Proposed Kairos Hermes Test Reactor with Designated Period for Receipt of Environmental Scoping Comments | Request |
ML22143B016 | 27 May 2022 | William Kennedy NRC/NRR/DANU/UARL | Audit Plan for Hermes Site Characteristics PSAR Chapter 2 | Other |
ML22181B157 | 30 June 2022 | Kairos Power LLC Transmittal of Changes to Construction Permit Application | Request | |
ML22194A014 | 1 August 2022 31 August 2022 | Kairos Hermes Construction Permit Application - Issuance of Environmental Scoping Summary Report | Request | |
ML22230D076 | 5 August 2022 | Benjamin Beasley NRC/NRR/DANU/UAL1 | Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System | Other |
ML22227A180 | 8 August 2022 | Benjamin Beasley NRC/NRR/DANU/UAL1 | Final RAI 348 on Shutdown Rod Reliability | RAI |
ML22196A387 | 24 August 2022 | Kairos Hermes CP Review - Environmental Audit Report | Request | |
ML22272A593 | 29 September 2022 | Kairos Power, LLC - Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 1 | Request | |
ML23019A360 | 6 November 2022 15 November 2022 | Kairos Power LLC, Additional Information Related to Construction Permit Application - PSAR Chapter 1 | Request | |
ML23019A361 | 15 November 2022 | Hastings P Kairos Power | Kairos Power LLC, Additional Information Related to Construction Permit Application - PSAR Chapter 1 | Other |
ML22329A011 | 16 November 2022 | NRC Region 1 | Deis Public Meeting Transcript for Kairos Hermes Construction Permit Application | Meeting |
ML22311A553 | 16 November 2022 | Benjamin Beasley Peyton Doub Office of Nuclear Material Safety and Safeguards Office of Nuclear Reactor Regulation Tami Dozier | Kairos Hermes NRC Staff Presentation at Nov 16 Public Meeting on the Draft Environmental Impact Statement for the Construction Permit for the Kairos Hermes Test Reactor | Request |
ML22342B282 | 8 December 2022 | Hastings P Kairos Power | Kairos Power LLC, Transmittal of Reponses to NRC Question on Hermes Preliminary Safety Analysis Report | Request |
ML22353A625 | 19 December 2022 | Hastings P Kairos Power | Kairos Power LLC, Transmittal of Changes to Preliminary Safety Analysis Report Chapter 6 and Response to NRC Question on Dhrs Testing | Request |
ML23055A672 | 24 February 2023 28 February 2023 | Kairos Power LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 2 | Request | |
ML23031A165 | 21 March 2023 | Tami Dozier NRC/NMSS/DREFS/ENRB | Kairos Attendance List | Request |
ML23031A160 | 21 March 2023 | Tami Dozier NRC/NMSS/DREFS/ENRB | Summary of Public Meeting for the Draft Environmental Impact Statement for the Kairos Hermes Test Reactor Construction Permit Application | |
ML23151A743 | 31 May 2023 | Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 | Request | |
ML23158A266 | 13 June 2023 | Mohamed Shams NRC/NRR/DANU/UNPL | Transmittal of Safety Evaluation for Hermes Construction Permit Application | Approval |
ML23158A265 | 13 June 2023 | Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes Non-Power Test Reactor | Request | |
ML23158A268 | 13 June 2023 | NRC/NRR/DANU/UNPL | Safety Evaluation for Hermes Construction Permit Application | Approval |
ML23181A107 | 18 July 2023 | Cuadrado De Jesus S NRC/NRR/DANU/UAL1 | Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report | Meeting |
ML23353A069 | 5 January 2024 | NRC/NMSS/DREFS/ENRB Doub J | Kairos Power, LLC-Hermes 2-Environmental Report Audit Plan | Other |