Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
TAC:MF0104 | 21 December 2012 | ||
ML13037A380 | 17 December 2012 | Attachment 1b, 2012 Annual Report of the Ceng Independent Nuclear Advisory Committee | Cyber Security |
ML123550040 | 17 December 2012 | ISFSI Decommissioning Funding Plan | Fitness for Duty Decommissioning Funding Plan Authorized possession limits |
ML12352A123 | 13 December 2012 | 60-Day Interim Report Involving an Evaluation of a Design Change to Magne-Blast Circuit Breakers | |
ML12348A136 | 13 December 2012 | Part 21 60-Day Interim Report Notification: Adequacy of Design Change in Am Magne-Blast Circuit Breakers | |
ML12347A308 | 12 December 2012 | Part 21 60-Day Interim Report Notification: Error in Main Steam Line High Flow Calculational Methodology | |
ML12348A394 | 7 December 2012 | NRC Bulletin 2012-01: Design Vulnerability in Electric Power System - Supplemental Response | Open Phase Condition Offsite Circuit |
ML13004A003 | 30 November 2012 | Kld TR-521, Final Report, Rev. 1, Nine Mile Point Nuclear Station and James A. FitzPatrick Nuclear Power Plant Development of Evacuation Time Estimates | |
ML12342A323 | 30 November 2012 | Reactor Pressure Vessel Head Weld Flaw Evaluation - Clarification Regarding Subsequent Examination of the Weld Flaw Indication | Incorporated by reference |
TAC:NE6721 | 30 November 2012 | ||
ML12342A286 | 30 November 2012 | ISFSI - General License 30-Day Cask Registration Notification and First System Thermal Performance Assessment | |
IR 05000220/2012404 | 29 November 2012 | IR 05000220-12-404, 05000410-12-404, 10/22/2012 - 10/26/2012, Nine Mile Point Nuclear Plant, Units 1 and 2, Protective Strategy Evaluation - Letter Only | Significance Determination Process Affidavit |
ML12340A402 | 28 November 2012 | 2012 Summary of Regulatory Commitment Changes | |
ML123380158 | 28 November 2012 | ISFSI, General License 30-day Cask Registration Notification and First System Thermal Performance Assessment | |
ML12348A083 | 27 November 2012 | Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic, Part 3 of 5 | Scram Discharge Volume Scaffolding |
ML12348A087 | 27 November 2012 | Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic, Part 1 of 5 | Safe Shutdown Unanalyzed Condition Ultimate heat sink Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Emergency Lighting Finite Element Analysis Aging Management Fukushima Dai-Ichi Seismically rugged Scram Discharge Volume Earthquake Weak link |
ML12348A084 | 27 November 2012 | Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic, Part 4 of 5 | Earthquake Scaffolding |
ML12348A088 | 27 November 2012 | Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic, Part 2 of 5 | Scram Discharge Volume Scaffolding |
ML12348A089 | 27 November 2012 | Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic, Part 5 of 5 | Earthquake Scaffolding |
ML12335A029 | 27 November 2012 | R. E. Ginna - Response to 10CFR50.54(f) Request for Information, Recommendation 2.3 Flooding | Safe Shutdown Unanalyzed Condition Time of Discovery High winds Fire Barrier Hydrostatic Locked High Radiation Area Fukushima Dai-Ichi Tornado Missile Protection Earthquake |
ML12348A086 | 27 November 2012 | Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic | Fukushima Dai-Ichi |
ML12342A031 | 27 November 2012 | Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3, Seismic. Part 1 of 5 | Fukushima Dai-Ichi |
TAC:MF1104 | 27 November 2012 | ||
TAC:MF0345 | 21 November 2012 | ||
ML123380336 | 21 November 2012 | License Amendment Request Pursuant to 10 CFR 50.90: Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report | Pressure and Temperature Limits Report |
ML12335A288 | 20 November 2012 | Corrected Copy of 2012 Owner'S Activity Report for Refueling Outage 13 Inservice Examinations | |
ML12326A467 | 16 November 2012 | Verification of Information in Aging Management Technical Letter Report | Safe Shutdown Boric Acid Ultimate heat sink Non-Destructive Examination Fire Barrier Weld Overlay Coatings VT-2 Aging Management Foreign Material Exclusion Moisture barrier License Renewal Subsequent License Renewal Earthquake Biofouling EVT-1 Through-Wall Leak Through-Wall Leakage Preliminary White Finding Fire Protection Program Dissimilar Metal Weld Power Uprate |
ML12313A091 | 15 November 2012 | Request for Withholding Information from Public Disclosure License Response Dated October 31, 2012 | |
ML12314A023 | 14 November 2012 | Request for Withholding Information from Public Disclosure Final Steam Dryer Stress Report at 115% CLTP, Continuum Dynamics, Incorporated Report No. 12-18P, Dated October 2012 | |
ML12320A020 | 14 November 2012 | Update: PNO-I-12-007A Hurricane Sandy Update Causes Oyster Creek Alert and Shutdowns of Reactors at Nine Mile Point Unit 1, Indian Point Unit 3 and Salem Unit 1 | |
ML12319A263 | 13 November 2012 | ME8899 Draft RAIs License Amendment Request to Adopt NFPA-805 | Hot Short Safe Shutdown Fire Barrier Time to boil Probabilistic Risk Assessment Multiple Spurious Operation Maintenance Rule Program Power Operated Valves Fire Protection Program |
IR 05000220/2012004 | 9 November 2012 | IR 05000220-12-004, 05000410-12-004; 07/01/2012 - 09/30/2012; Nine Mile Point Nuclear Station, Units 1 and 2, Maintenance Effectiveness, Plant Modifications and Radiation Safety | Half scram Fire Barrier Internal Flooding Hydrostatic Enforcement Discretion Functionality Assessment Fukushima Dai-Ichi Significance Determination Process Operability Determination Fuel cladding Flow Induced Vibration Power Uprate |
ML12319A416 | 9 November 2012 | ISFSI - General License 30-day Cask Registration Notification and Thermal Performance Assessment | |
ML12307A352 | 1 November 2012 | Email Dated 11-2-12 Nine Mile Point NPP Reasonable Assurance of Offsite Capabilities | |
IR 05000244/2012007 | 1 November 2012 | Notice of Violation - Constellation Energy Nuclear Group MEMO | |
IR 05000220/2012008 | 1 November 2012 | Notice of Violation - Constellation Energy Nuclear Group MEMO | |
ML12213A182 | 1 November 2012 | Notice of Violation - Constellation Energy Nuclear Group Memo | |
IR 05000317/2012008 | 1 November 2012 | Notice of Violation - Constellation Energy Nuclear Group MEMO | |
PNO-I-12-007, Hurricane Sandy Causes Oyster Creek Alert and Shutdowns of Reactors at Nine Mile Point Unit 1, Indian Point Unit 3, and Salem Unit 1 | 31 October 2012 | PNO-I-12-007 - Hurricane Sandy Causes Oyster Creek Alert and Shutdowns of Reactors at Nine Mile Point Unit 1, Indian Point Unit 3, and Salem Unit 1 | Safe Shutdown |
ML12312A256 | 31 October 2012 | Calculation 32-9157438-000, NMP-1 LAS Scc/Sicc Evaluation. | Finite Element Analysis |
ML12312A255 | 31 October 2012 | Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair of Control Rod Drive Housing Penetrations - Response to NRC Request for Additional Information | Non-Destructive Examination Weld Overlay Nondestructive Examination |
Press Release-I-12-043, NRC Maintains Heightened Watch Over Nuclear Plants Impacted by Sandy; Three Reactors Experienced Shutdowns During Storm; Oyster Creek Plant Remains in Alert | 30 October 2012 | Press Release-I-12-043: NRC Maintains Heightened Watch Over Nuclear Plants Impacted by Sandy; Three Reactors Experienced Shutdowns During Storm; Oyster Creek Plant Remains in Alert | Safe Shutdown |
ML12311A017 | 26 October 2012 | Initial Status Report in Response to Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies | FLEX |
ML12313A203 | 26 October 2012 | Attachment 1, NMP2 Extended Power Uprate, Power Ascension Test Report | Shutdown Margin Reactor Vessel Water Level Power change |
ML12311A016 | 26 October 2012 | Initial Status Report in Response to Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order EA-12-050) | Containment Hardened Vent |
ML12311A015 | 26 October 2012 | Initial Status Report in Response to Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent | Spent Fuel Pool Instrumentation |
ML12313A206 | 26 October 2012 | Submittal of Extended Power Uprate Power Ascension Testing Information in Accordance with Operating License Condition 2.3.(20)(a)3 and 2.C.(20)(b)3 | |
ML12313A204 | 26 October 2012 | Attachment 2, Final Steam Dryer Stress Report, Continuum Dynamics, Incorporated Report No. 12-18NP, Attachment 3, Affidavit from CDI | Finite Element Analysis Liquid penetrant Flow Induced Vibration |
TAC:ME8349 | 25 October 2012 | ||
ML12298A221 | 25 October 2012 | Correction to Letter Request for Withholding Information from Public Disclosure EPU Power Ascension Report Dated September 26, 2012 |