Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML08347065230 December 2008Summary of Periodic Meeting with Firstenergy Nuclear Operating Company (FENOC) Staff on Licensing Action Status
TAC:MD706930 December 2008
ML08296072929 December 2008Request for Relief Related to Inservice Inspection Relief Request IR-054Incorporated by reference
ML09009037329 December 2008Submittal of Semi-Annual Sewage Isotopic Report
ML08359014824 December 2008Meeting Notice, Significant Licensee Meeting with Firstenergy Nuclear Operating Company (FENOC) Regarding Beaver Valley, Perry, and Davis-Besse Nuclear Generating Stations
ML08359016124 December 2008Letter to Firstenergy Nuclear Operating Company (FENOC) Regarding Public Meeting Notice Regarding Beaver Valley, Perry and Davis-Besse Nuclear Generating Stations, Fleet Performance Review
ML09126022122 December 2008Enclosure B, Offsite Dose Calculation Manual, Revision 17Time of Discovery
Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Annual Radiological Effluent Release Report
Power change
ML08357045422 December 2008Acceptance of Eight Separate IST Program 10 CFR 50.55a Requests in Support of Third Ten-Year Interval
L-08-383, Supplemental Information Regarding NRC Generic Letter 2008-0119 December 2008Supplemental Information Regarding NRC Generic Letter 2008-01
ML08310028416 December 2008Request for Relief Related to Inservice Inspection Relief Requests IR-056 and IR-057VT-2
Incorporated by reference
EVT-1
ML09005001616 December 2008NPDES Discharge Monitoring Report for November 2008
M091103, SRM-M091103B - Briefing on Fire Protection Lessons Learned from Shearon Harris10 December 2008SRM-M091103B - Briefing on Fire Protection Lessons Learned from Shearon Harris
ML09344125810 December 2008SRM-M091103B - Briefing on Fire Protection Lessons Learned from Shearon Harris
ML0834502285 December 200808 Perry Re Waiver Request
ML0835704435 December 2008Acceptance of License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497 for Review
ML0834501614 December 2008GFE Annual Registration Letter - 2009 ExaminationsGeneric Fundamentals Examination
ML08334000228 November 2008Re NRC Office of Investigations Report No. 3-2008-008 (AMS File No. RIII-2008-A-0004)
ML08323010225 November 2008Project Manager Reassignment
ML08302003120 November 2008Application to Use Weighting Factors for External ExposureDeep Dose Equivalent
TAC:ME020418 November 2008
TAC:ME019118 November 2008
L-08-325, License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 49718 November 2008License Amendment Request No. 08-18 to Incorporate Technical Specification Task Force Travelers 479 and 497Incorporated by reference
Foreign Material Exclusion
L-08-347, Eight Separate In-Service Testing Program 10 CFR 50.55a Alternatives Requests in Support of the Third Ten-Year Interval18 November 2008Eight Separate In-Service Testing Program 10 CFR 50.55a Alternatives Requests in Support of the Third Ten-Year IntervalSafe Shutdown
Stroke time
Power Operated Valves
Pressure Boundary Leakage
L-08-330, 2009 Perry Nuclear Power Plant Initial Examination Proposed Exam Files14 November 20082009 Perry Nuclear Power Plant Initial Examination Proposed Exam Files
ML08344025613 November 2008October NPDES Discharge Monitoring Report
IR 05000440/200850212 November 2008IR 05000440-08-502 on 10/06/2008 - 10/10/2008 for Perry Baseline Emergency Preparedness Biennial Exercise
ML08319001712 November 2008Notification of Potential Part 21 on All Dimensionally Verified Commercial Grade Items Processed Per Fisher Manufacture Procedure Fmp 2K28
L-08-329, and Perry Nuclear Power Plant, Unit 1 Actions Required by Confirmatory Order EA-07-19912 November 2008and Perry Nuclear Power Plant, Unit 1 Actions Required by Confirmatory Order EA-07-199
ML0830801853 November 2008Information Request to Support Upcoming Perry Nuclear Power Station Problem Identification and Resolution (Pi&R) InspectionTemporary Modification
IR 05000440/20080043 November 2008IR 0500440-08-004, on 10/27/2008, Errata to Perry Nuclear Power Plant NRC Integrated
ML08301045427 October 2008IR 05000440-08-004 on 07/01/2008 - 09/30/2008 for PerryUnanalyzed Condition
High winds
High Radiation Area
Ultimate heat sink
Fire Barrier
Internal Flooding
Enforcement Discretion
Probabilistic Risk Assessment
Fire impairment
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Tornado-Generated Missile
Significance Determination Process
Thermoset
Fuel cladding
Through-Wall Leakage
Fire Protection Program
Scaffolding
Grace period
Downpower
ML08288044627 October 2008Closeout of Generic Letter 2007-01 Inaccessible or Underground Power Cable Failures That Disable Accident Mitigation Systems or Cause Plant Transients
ML08298035315 October 2008Quarterly Report, Facility Id: 02-43-12-0922, for the Period July 1 Through September 30, 2008
L-08-315, Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems14 October 2008Nine Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray SystemsSafe Shutdown
Mission time
Hydrostatic
Past operability
ML08288034614 October 2008Notification of NRC Inspection and Request for InformationSafe Shutdown
Enforcement Discretion
Control of Heavy Loads
ML08303004413 October 2008September NPDES Discharge Monitoring Report
IR 05000440/20084048 October 2008IR 05000440-08-404 (DRS) on 09/08/2008 - 09/12/2008 for Perry, Routine Security Baseline Inspection - Cover Letter
ML0828806637 October 2008Ltr. 10/07/2008 Perry Re Confirmation of Initial/Requalification Operator License Examinations
L-08-349, Calculation for Contingency Flaw Evaluation Support6 October 2008Calculation for Contingency Flaw Evaluation SupportFinite Element Analysis
Dissimilar Metal Weld