ML083030044
| ML083030044 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 10/13/2008 |
| From: | Bezilla M FirstEnergy Nuclear Operating Co |
| To: | Office of Nuclear Reactor Regulation, State of OH, Environmental Protection Agency |
| References | |
| PY-CEI/OEPA-0495L | |
| Download: ML083030044 (10) | |
Text
FENOC Perry Nuclear Power Station 10 Center Road FirstEnergy Nuclear O!peratiQg. Company Perry, Ohio 44081 Mark B. Bezilla 440-280-5382 Vice President Fax: 440-280-8029 October-13,;20.08 PY-CEIIOEPA-0495L.
Ohiio, Envirp omental-PIrotection Agency Division~of Water Pollution Control Enforcement Section, ES/DMR P.O. Box 1049 Columbus, Ohio 43216-1049
SUBJECT:
Perry Nuclear Power Plant, September NPDES Discharge Monitoring Report Enclosed are the Perry Nuclear Power Plant, NPDES monthly report forms for
.the month of September 2008. No violations occurred during this period.
If you have questions or require additional information, please contact Mrs. Liz Ryan at (440) 280-5536.
Sincerely, Mark Bezilla. *-.
Enclosures-.
A.Station-Code 004 Report,,
B Station Code 094 Report C Station Code 601 Report P Station."Code 602-Report E..Station Code 800 Report cc: NRC Region III NRC Resident Inspector NRR Project Manager
..NRC Document Control Desk (Docket Nb. 50-440)
Page 1 of 9 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Plt 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
3IB00016*ID 004 2008-09-01 To: 2008-09-30 CCB125 Liz Ryan Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 1
50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY 1/Day I/Day 2/Week I/Month 1/Month When Disch.
When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-09-01 76 93.0 AH AA 0.05 2008-09-02 76 92.2 8.43 AH AA 0.05 2008-09-03 77 88.0 AA 8.0 6
AH AA 0.05 2008-09-04 77 88.0 AH AA 0.05 2008-09-05 74 97.2 8.43 AH AA 0.05 2008-09-06 75 88.0 AH AA 0.05 2008-09-07 75 88.0 AH AA 0.05 2008-09-08 75 89.6 AH AA 0.05 2008-09-09 75 92.5 8.44 AH AA 0.05 2008-09-10 74 94.6 AH AA 0.05 2008-09-11 74 93.4 AH AA 0.05 2008-09-12 75 92.0 8.57 AH AA 0.05 2008-09-13 76 92.1 AH AA 0.05 2008-09-14 78 86.7 AH AA 0.05 2008-0945 78 93.7 AH AA 0.05 2008-09-16 76 91.9 8.4 AH AA 0.05 2008-09-17 75 91.7 AH AA 0.05 2008-09-18 75 92.0 AH AA 0.05 2008-09-19 76 91.1 8.51 AH AA 0.05 2008-09-20 68 102.7 AH AA 0.05 2008-09-21 75 116.4
.AH AA 0.05 2008-09-22 76 115.4 AH AA 0.05 2008-09-23 73 109.8 8.32 AH AA 0.05 2008-09-24 72 107.1 AH AA 0.05 2008-09-25 73 104.1 AH AA 0.05 2008-09-26 74 104.1 8.38 AH AA 0.05 2008-09-27 74 104.1 AH AA 0.05 2008-09-28 73 104.1 AH AA 0.05 2008-09-29 73 104.1 AH AA 0.05 2008-09-30 73 104.1 8.44 AH AA 0.05 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of
- nmt,
/
V P U Ucteor fine and imprisonment.
Z
ýII=
e When completed mail this report to: EDMR Administrator, EDMR Administrator,, OH, Z
Page 1 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt...
10/3/2008
Page 2 of 9 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Plt 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
31B00016*ID 004 2008-09-01 To: 2008-09-30 CCB125 Liz Ryan Phlorination/Bromination PARAMETER Drto Duration PARAMETER 78739 CODE UNITS 6655 FREQUENCY When Disch.
SAMPLING TYPE Total 2008-09-01 100 2008-09-02 100 2008-09-03 100 2008-09-04 100 2008-09-05 100 2008-09-06 100 2008-09-07 100 2008-09-08 100 2008-09-09 100 2008-09-10 100 2008-09-11 100 2008-09-12 100 2008-09-13 100 2008-09-14 100 2008-09-15 100 2008-09-16 100 2008-09-17 100 2008-09-18 100 2008-09-19 100 2008-09-20 100 2008-09-21 100 2008-09-22 100 2008-09-23 0
2008-09-24 50 2008-09-25 100 2008-09-26 100 2008-09-27 100 2008-09-28 100 2008-09-29 100 2008-09-30 100 Name/Title of Responsible I certify/under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
S Official or Authorized w¢ith the information submitted herein and based an my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of CO fine and imprisonment.
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Page 2 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt...
10/3/2008
Page 3 of 9 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Plt 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
3IB00016*ID STATION CODE:
094 MONITORING PERIOD:
2008-09-01 To: 2008-09-30 REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
AL Water Zinc, Total Copper, Total Oxidants, Total Chlorine, Total Temperature Recoverable Recoverable Residual Residual PARAMETER CODE 00011 50050 00400 01094 01119 34044 50060 UNITS 4103 4108 6653 4107 4107 4106 4106 FREQUENCY I/Day I/Day 2/Week I/Month I/Month When Disch.
When Disch.
SAMPLING TYPE Continuous Continuous Grab Grab Grab Grab Grab 2008-09-01 2008-09-02 2008-09-03 2008-09-04 2008-09-05 2008-09-06 2008-09-07 2008-09-08 2008-09-09 2008-09-10 2008-09-11 2008-09-12 2008-09-13 2008-09-14 2008-09-15 2008-09-16 2008-09-17 2008-09-18 2008-09-19 2008-09-20 2008-09-21 2008-09-22 2008-09-23 2008-09-24 2008-09-25 2008-09-26 2008-09-27 2008-09-28 2008-09-29 2008-09-30 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative S -
l Unsignificant penalties for submitting false information, including the possibility of P d wfine and imprisonment.
I/~-
When completed mail this report to: EDMR Administrator, EDMR Administrator,.,,H,
/
Page 3' https://ebiz.epa.ohio..gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt...
10/3/2008
Page 4 of 9 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Plt 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
31BO0016*ID 094 2008-09-01 To: 2008-09-30 AL Chlorination/Bromination PARAMETER Drto Duration PARAMETER 78739 CODE UNITS 6655 FREQUENCY When Disch.
SAMPLING TYPE Total 2008-09-01 2008-09-02 2008-09-03 2008-09-04 2008-09-05 2008-09-06 2008-09-07 2008-09-08 2008-09-09 2008-09-10 2008-09-11 2008-09-12 2008-09-13 2008-09-14 2008-09-15 2008-09-16 2008-09-17 2008-09-18 2008-09-19 2008-09-20 2008-09-21 2008-09-22 2008-09-23 2008-09-24 2008-09-25 2008-09-26 2008-09-27 2008-09-28 2008-09-29 2008-09-30 rNarne! 1 e of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MIYIDV/YYI/ )
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of 1/
Whe cp-eted mail fine and imprisonment.
MRd ntoOag When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Page 4:
https://ebiz.epa.ohio.gov/edwr.web/page/repor-tlviewWithXslt.do?actType=viewWithXslt...
10/3/2008
Page 5 of 9 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
3IB00016*ID 601 2008-09-01 To: 2008-09-30 AL PARAMETER Flow Rate pH Total Suspended Oil and Grease, Solids Total PARAMETER CODE 50050 00400 00530 00550 UNITS 4108 6653 4106 4106 FREQUENCY Continuous 1 /2 Weeks 1 / 2 Weeks 1 / 2 Weeks SAMPLING TYPE 24hr Total Grab Grab Grab 2008-09-01 2008-09-02 2008-09-03 2008-09-04 2008-09-05 2008-09-06 2008-09-07 2008-09-08 2008-09-09 2008-09-10 2008-09-11 2008-09-12 2008-09-13 2008-09-14 2008-09-15 2008-09-16 2008-09-17 2008-09-18 2008-09-19 2008-09-20 2008-09-21 2008-09-22 2008-09-23 2008-09-24 2008-09-25 2008-09-26 2008-09-27 2008-09-28 2008-09-29 2008-09-30 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized ubmitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of VFp AI-fine and imprisonment.
When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, Z
Page 5 https://ebiz.epa.ohio.gov/edwr.web/page/reportlviewWithXslt.do?actType=viewWithXslt...
10/3/2008
Page 6 of 9 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Plt 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
31B00016*ID STATION CODE:
602 MONITORING PERIOD:
2008-09-01 To: 2008-09-30 REPORTING LAB:
CCB125 ANALYST:
Liz Ryan NO DISCHARGE INDICATOR:
AL Total Suspended Oil and Grease, Iron, Total Copper, Total PARAMETER Flow Rate pH Solids Total Recoverable Recoverable PARAMETER CODE 50050 00400 00530 00550 00980 01119 UNITS 4108 6653 4106 4106 4107 4107 FREQUENCY Continuous 1 /2 Weeks 1 / 2 Weeks 1 / 2 Weeks 1 / 2 Weeks I / 2 Weeks SAMPLING TYPE 24hr Total Grab 24hr Composite Grab 24hr Composite 24hr Composite 2008-09-01 2008-09-02 2008-09-03 2008-09-04 2008-09-05 2008-09-06 2008-09-07 2008-09-08 2008-09-09 2008-09-10 2008-09-il 2008-09-12 2008-09-13 2008-09-14 2008-09-15 2008-09-16 2008-09-17 2008-09-18.
2008-09-19 2008-09-20 2008-09-21 2008-09-22 2008-09-23 2008-09-24 2008-09-25 2008-09-26 2008-09-27 2008-09-28 2008-09-29 2008-09-30 Name/Title of Responsible I certify under the penalty of law that I have personally examined and am familiar Signature of Date (MM/DD/YY)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative Significant penalties for submitting false information, including the possibility of
\\) P Jd w fine and imprisonment.
-a-3/4 When completed mail this report to: EDMR Administrator, EDMR Administrator... OH, Page 6 https://ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt...
10/3/2008
Page 7 of 9 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
COUNTY:
DISTRICT:
FirstEnergy Perry Nuclear Power Plt 10 Center Rd North Perry, 44081 Lake NEDO PERMIT NUMBER:
STATION CODE:
MONITORING PERIOD:
REPORTING LAB:
ANALYST:
NO DISCHARGE INDICATOR:
3IB00016*ID 800 2008-09-01 To: 2008-09-30 CCB125 Liz Ryan Water Zinc, Total Copper, Total Temperature Recoverable Recoverable PARAMETER CODE 00011 01094 01119 UNITS 4103 4107 4107 FREQUENCY I/Day 1/Month I/Month SAMPLING TYPE Continuous Grab Grab 2008-09-01 70 2008-09-02 68 2008-09-03 69 AA 8.0 AA 2.0 2008-09-04 70 2008-09-05 66 2008-09-06 69 2008-09-07 69 2008-09-08 69 2008-09-09 69 2008-09-10 68 2008-09-11 68 2008-09-12 68 2008-09-13 68 2008-09-14 68 2008-09-15 69 2008-09-16 70 2008-09-17 69 2008-09-18 69 2008-09-19 69 2008-09-20 63 2008-09-21 68 2008-09-22 67 2008-09-23 68 2008-09-24 67 2008-09-25 67 2008-09-26 67 2008-09-27 67 2008-09-28 66 2008-09-29 67 2008-09-30 66 N'amel itlue of Responsible Icertit under the penalty of law that I have personally examined and am familiar signature of Date (NIlNVUIO/i r x)
Official or Authorized with the information submitted herein and based on my inquiry of those Responsible Official or Representative individuals immediately responsible for obtaining the information, I believe the Authorized submitted information is true, accurate and complete. I am aware that there are Representative significant penalties for submitting false information, including the possibility of
\\WPJrMudew Ifine and imprisonment.6/1$02 When completed mail this report to: EDMR Administrator, EDMR Administrator,,, OH, 0
Page 7 https l//ebiz.epa.ohio.gov/edwr.web/page/reportlviewWithXslt.do?actType=viewWithXslt...
10/3/2008
Page 8 of 9 Ohio EPA - Daily Discharge Monitoring Report - Form 4500 FACILITY:
LOCATION:
FirstEnergy Perry Nuclear Power Pit 10 Center Rd North Perry, 44081 PERMIT NUMBER:
3IB00016*ID MONITORING PERIOD:
2008-09-01 To: 2008-09-30 PARAMETER COMMENTS:
Station Code Parameter Name Parameter Code Date Unit Comment 004 Oxidants, Total Residual 34044 2008-09-01 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-02 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-03 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-04 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-05 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-06 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-07 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-08 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-09 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-10 4106 No bromination event this date 004 Oxidants, TotalResidual 34044 2008-09-11 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-12 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-13 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-14 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-15 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-16 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-17 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-18 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-19 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-20 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-21 4106 No broiniration event this date 004 Oxidants, Total Residual 34044 2008-09-22 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-23 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-24 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-25 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-26 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-27 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-28 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-29 4106 No bromination event this date 004 Oxidants, Total Residual 34044 2008-09-30 4106 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-01 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-02 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-03 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-04 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-05 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-06 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-07 4107 No bromination event this date httpsl//ebiz.epa.ohio.gov/edwr.web/page/report/viewWithXslt.do?actType=viewWithXslt...
10/3/2008
Page 9 of 9 602 Copper, Total Recoverable 01119 2008-09-08 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-09 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-10 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-11 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-12 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-13 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-14 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-15 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-16 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-17 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-18 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-19 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-20 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-21 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-22 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-23 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-24 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-25 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-26 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-27 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-28 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-29 4107 No bromination event this date 602 Copper, Total Recoverable 01119 2008-09-30 4107 No bromination event this date https://ebiz.epa.ohio.gov/edwr.web/page/reportlviewWithXslt.do?actType=viewWithXslt...
10/3/2008