Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML030090034 | 31 December 2002 | STP, Units 1 & 2, Amendment 146, 134, Revised Allowed Outage Time (AOT) for Auxiliary Feedwater Pumps (AFW) (TAC MB3586, 3590) | Offsite Dose Calculation Manual Enforcement Discretion Probabilistic Risk Assessment |
ML030090449 | 31 December 2002 | STP, Units 1 & 2, Amendment No. 146 & 134 to TS 3/4 7-4 Regarding Allowed Outage Time (AOT) for Auxiliary Feedwater Pumps (AFW) from 72 Hours to 28 Days (TAC Nos. MB3586 & MB3590) | |
ML023600375 | 26 December 2002 | Ltr, Bulletin 2002-02, Response to the NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles Inspection Programs | Nondestructive Examination |
TAC:MB5926 | 26 December 2002 | ||
NOC-AE-02001437, STP Unit 2 Reactor Pressure Vessel Head Inspection Results in Response to Bulletin 2001-01, Bulletin 2002-01 and Bulletin 2002-02 | 23 December 2002 | STP Unit 2 Reactor Pressure Vessel Head Inspection Results in Response to Bulletin 2001-01, Bulletin 2002-01 and Bulletin 2002-02 | Boric Acid Reactor Vessel Water Level VT-2 |
TAC:MB3841 | 20 December 2002 | ||
ML023540009 | 20 December 2002 | Request for Relief, Form the ASME and Pressure Vessel Code Section XI Requirements Relief Request RR-ENG-2-26 | VT-2 |
PNO-IV-02-078, STP Nuclear Operating Co., Shutdown as Result of High Main Turbine Vibration | 18 December 2002 | PNO-IV-02-078: STP Nuclear Operating Co., Shutdown as Result of High Main Turbine Vibration | |
ML022800581 | 17 December 2002 | STP (Units 1 & 2), Amendment, Relocation of TSs to Tech Manual (TRM) | Unanalyzed Condition Shutdown Margin Probabilistic Risk Assessment |
TAC:MB3588 | 17 December 2002 | ||
NOC-AE-02001441, 10CFR50.46 Thirty Day Report of Significant ECCS Model Changes | 17 December 2002 | 10CFR50.46 Thirty Day Report of Significant ECCS Model Changes | |
ML023460033 | 12 December 2002 | Summary of Meeting with Strategic Teaming & Resource Sharing-Integrated Regulatory Affairs Group for Callaway, Comanche Peak, Diablo Canyon, South Texas, Wolf Creek & Palo Verde | |
NOC-AE-02001436, November 2002 Monthly Operating Report for South Texas Project, Units 1 and 2 | 12 December 2002 | November 2002 Monthly Operating Report for South Texas Project, Units 1 and 2 | |
NOC-AE-02001434, Revision 2 to Unit 1 Cycle 11 Core Operating Limits Report | 11 December 2002 | Revision 2 to Unit 1 Cycle 11 Core Operating Limits Report | |
ML023440149 | 10 December 2002 | December 10, 2002, Draft Information for November, 2002 (LPDIV-1) | |
ML023540399 | 10 December 2002 | New Procedures, Emergency Management Plan for Matagorda County, Bay City, and Palacios, Annex W Procedures Fixed Nuclear Facilities Response | |
ML023400185 | 3 December 2002 | NRC Plans to Administer Generic Fundamentals Section of Written Operator Licensing Examination on 02/05/2003 | Generic Fundamentals Examination |
NOC-AE-02001430, Withdrawal of Proposed Amendment to Technical Specification 3.4.2.2 | 2 December 2002 | Withdrawal of Proposed Amendment to Technical Specification 3.4.2.2 | |
NOC-AE-02001433, Cycle 10 Core Operating Limits Report | 2 December 2002 | Cycle 10 Core Operating Limits Report | |
ML023360147 | 2 December 2002 | Inspection Date for Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures - STP Nuclear Operating Company | |
ML023380536 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023330457 | 27 November 2002 | Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010) | Ultimate heat sink Mission time Probabilistic Risk Assessment Large early release frequency |
ML023400524 | 26 November 2002 | Technical Specifications Pages for Amendmentds 144 & 132 End of Life (Eol) Moderator Temperature Coefficient (Mtc) Surveillance Requirements | |
ML023390078 | 26 November 2002 | Technical Specifications Pages for Amendmentds 144 & 132 End of Life (Eol) Moderator Temperature Coefficient (Mtc) Surveillance Requirements | Shutdown Margin |
TAC:MB5160 | 26 November 2002 | ||
ML023400252 | 26 November 2002 | License Amendments, Revising End of Life Moderator Temperature Coefficient Surveillance Requirements | |
ML023290450 | 25 November 2002 | Bulletin 2002-01 60-Day Response, Request for Additional Information (RAI) (TAC MB4580 & TAC Mb 4581) | Boric Acid VT-2 Pressure Boundary Leakage |
NOC-AE-02001426, Changes to Emergency Plan & Implementing Procedures | 21 November 2002 | Changes to Emergency Plan & Implementing Procedures | |
NOC-AE-02001432, Changes to Emergency Plan Procedures | 21 November 2002 | Changes to Emergency Plan Procedures | Boric Acid Health Physics Network |
NOC-AE-02001335, Proposed License Amendment to Eliminate the Turbine Missile Design Basis | 14 November 2002 | Proposed License Amendment to Eliminate the Turbine Missile Design Basis | Turbine Missile |
NOC-AE-02001429, October 2002 Monthly Operating Report for South Texas Project Units 1 & 2 | 14 November 2002 | October 2002 Monthly Operating Report for South Texas Project Units 1 & 2 | |
ML023100131 | 13 November 2002 | Memo Draft Documents for June 26, 2002 Through October 28, 2002 | |
NOC-AE-02001339, Revised Request to Implement a Risk-Informed Inservice Testing Program for Pumps and Valves Beginning the Second 10-Year Interval (Relief Request RR-ENG-IST-2-01) | 12 November 2002 | Revised Request to Implement a Risk-Informed Inservice Testing Program for Pumps and Valves Beginning the Second 10-Year Interval (Relief Request RR-ENG-IST-2-01) | Probabilistic Risk Assessment Exemption Request |
ML023220160 | 12 November 2002 | Part 2 of 2, South Texas, Revised Request to Implement a Risk-Informed Inservice Testing Program for Pumps and Valves Beginning the Second 10-Year Interval (Relief Request RR-ENG-IST-2-01), Attachments 4 - 6 | Safe Shutdown Boric Acid Ultimate heat sink Stroke time Probabilistic Risk Assessment Foreign Material Exclusion Large early release frequency Cold shutdown justification |
ML023220125 | 12 November 2002 | Part 1 of 2, South Texas, Revised Request to Implement a Risk-Informed Inservice Testing Program for Pumps and Valves Beginning the Second 10-Year Interval (Relief Request RR-ENG-IST-2-01), Attachments 1 - 3 | Safe Shutdown Boric Acid High winds Stroke time Safe Shutdown Earthquake Probabilistic Risk Assessment Incorporated by reference Large early release frequency Cold shutdown justification Exemption Request Maintenance Rule Program Power-Operated Valves |
ML023370376 | 11 November 2002 | Emergency Plan Implementing Procedures, Attachment 2 | Safe Shutdown Unanalyzed Condition Fitness for Duty Health Physics Network Fuel cladding |
ML023120022 | 7 November 2002 | Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs Group | Missed surveillance Recently irradiated fuel |
ML022900552 | 5 November 2002 | Summary Staff Evaluations of 90-Day Steam Generator Tube Inspection Reports for Refueling Outages 7 & 8 | |
TAC:MA8116 | 5 November 2002 | ||
ML023090454 | 5 November 2002 | Relief, American Society of Mechanical Engineers Code Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds. TAC Nos. MB6576 & MB6577 | Boric Acid Weld Overlay Nondestructive Examination Incorporated by reference Liquid penetrant |
TAC:MB6576 | 5 November 2002 | ||
NOC-AE-02001368, E-mail Kenneth Taplett to Mohan Thadani, Replacement Page NOC-AE-02001368 | 4 November 2002 | E-mail Kenneth Taplett to Mohan Thadani, Replacement Page NOC-AE-02001368 | Shutdown Margin |
ML023090550 | 4 November 2002 | Generic Fundamentals Examination - Copy of PWR & BWR GFEs & Answer Keys Available on NRCs Website 60 Days Following Exam | Generic Fundamentals Examination |
NOC-AE-02001425, Letter Regards End of Life Moderator Temperature Coefficient | 31 October 2002 | Letter Regards End of Life Moderator Temperature Coefficient | |
NOC-AE-02001427, Second Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval | 31 October 2002 | Second Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval | Boric Acid Weld Overlay Nondestructive Examination Liquid penetrant |
NOC-AE-02001424, Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval | 31 October 2002 | Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval | Boric Acid Weld Overlay Nondestructive Examination Liquid penetrant |
NOC-AE-02001411, Letter from J. J. Sheppard to Ellis Merschoff Final Report from Management Insight Technologies for 2002 Focused Cultural Assessment for South Texas Project | 30 October 2002 | Letter from J. J. Sheppard to Ellis Merschoff Final Report from Management Insight Technologies for 2002 Focused Cultural Assessment for South Texas Project | |
ML022770234 | 30 October 2002 | Savety Evaluation Regarding License Amendment Request Proposed Amendment to the South Texas Project Technical Specifications to Revise Administrative Control Requirements | |
TAC:MB3589 | 30 October 2002 | ||
ML023110103 | 25 October 2002 | Comment from D. R. Woodlan on DG-1099, Anchoring Components and Structural Supports in Concrete. | Backfit |