Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML03009003431 December 2002STP, Units 1 & 2, Amendment 146, 134, Revised Allowed Outage Time (AOT) for Auxiliary Feedwater Pumps (AFW) (TAC MB3586, 3590)Offsite Dose Calculation Manual
Enforcement Discretion
Probabilistic Risk Assessment
ML03009044931 December 2002STP, Units 1 & 2, Amendment No. 146 & 134 to TS 3/4 7-4 Regarding Allowed Outage Time (AOT) for Auxiliary Feedwater Pumps (AFW) from 72 Hours to 28 Days (TAC Nos. MB3586 & MB3590)
ML02360037526 December 2002Ltr, Bulletin 2002-02, Response to the NRC Bulletin 2002-02, Reactor Pressure Vessel Head and Vessel Head Penetration Nozzles Inspection ProgramsNondestructive Examination
TAC:MB592626 December 2002
NOC-AE-02001437, STP Unit 2 Reactor Pressure Vessel Head Inspection Results in Response to Bulletin 2001-01, Bulletin 2002-01 and Bulletin 2002-0223 December 2002STP Unit 2 Reactor Pressure Vessel Head Inspection Results in Response to Bulletin 2001-01, Bulletin 2002-01 and Bulletin 2002-02Boric Acid
Reactor Vessel Water Level
VT-2
TAC:MB384120 December 2002
ML02354000920 December 2002Request for Relief, Form the ASME and Pressure Vessel Code Section XI Requirements Relief Request RR-ENG-2-26VT-2
PNO-IV-02-078, STP Nuclear Operating Co., Shutdown as Result of High Main Turbine Vibration18 December 2002PNO-IV-02-078: STP Nuclear Operating Co., Shutdown as Result of High Main Turbine Vibration
ML02280058117 December 2002STP (Units 1 & 2), Amendment, Relocation of TSs to Tech Manual (TRM)Unanalyzed Condition
Shutdown Margin
Probabilistic Risk Assessment
TAC:MB358817 December 2002
NOC-AE-02001441, 10CFR50.46 Thirty Day Report of Significant ECCS Model Changes17 December 200210CFR50.46 Thirty Day Report of Significant ECCS Model Changes
ML02346003312 December 2002Summary of Meeting with Strategic Teaming & Resource Sharing-Integrated Regulatory Affairs Group for Callaway, Comanche Peak, Diablo Canyon, South Texas, Wolf Creek & Palo Verde
NOC-AE-02001436, November 2002 Monthly Operating Report for South Texas Project, Units 1 and 212 December 2002November 2002 Monthly Operating Report for South Texas Project, Units 1 and 2
NOC-AE-02001434, Revision 2 to Unit 1 Cycle 11 Core Operating Limits Report11 December 2002Revision 2 to Unit 1 Cycle 11 Core Operating Limits Report
ML02344014910 December 2002December 10, 2002, Draft Information for November, 2002 (LPDIV-1)
ML02354039910 December 2002New Procedures, Emergency Management Plan for Matagorda County, Bay City, and Palacios, Annex W Procedures Fixed Nuclear Facilities Response
ML0234001853 December 2002NRC Plans to Administer Generic Fundamentals Section of Written Operator Licensing Examination on 02/05/2003Generic Fundamentals Examination
NOC-AE-02001430, Withdrawal of Proposed Amendment to Technical Specification 3.4.2.22 December 2002Withdrawal of Proposed Amendment to Technical Specification 3.4.2.2
NOC-AE-02001433, Cycle 10 Core Operating Limits Report2 December 2002Cycle 10 Core Operating Limits Report
ML0233601472 December 2002Inspection Date for Temporary Instruction 2515/148, Inspection of Nuclear Reactor Safeguards Interim Compensatory Measures - STP Nuclear Operating Company
ML02338053627 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02333045727 November 2002Transmittal of RAI Responses for WCAP-15622, Risk-Informed Evaluation of Extensions to AC Electrical Power System Completion Times. (MUHP-3010)Ultimate heat sink
Mission time
Probabilistic Risk Assessment
Large early release frequency
ML02340052426 November 2002Technical Specifications Pages for Amendmentds 144 & 132 End of Life (Eol) Moderator Temperature Coefficient (Mtc) Surveillance Requirements
ML02339007826 November 2002Technical Specifications Pages for Amendmentds 144 & 132 End of Life (Eol) Moderator Temperature Coefficient (Mtc) Surveillance RequirementsShutdown Margin
TAC:MB516026 November 2002
ML02340025226 November 2002License Amendments, Revising End of Life Moderator Temperature Coefficient Surveillance Requirements
ML02329045025 November 2002Bulletin 2002-01 60-Day Response, Request for Additional Information (RAI) (TAC MB4580 & TAC Mb 4581)Boric Acid
VT-2
Pressure Boundary Leakage
NOC-AE-02001426, Changes to Emergency Plan & Implementing Procedures21 November 2002Changes to Emergency Plan & Implementing Procedures
NOC-AE-02001432, Changes to Emergency Plan Procedures21 November 2002Changes to Emergency Plan ProceduresBoric Acid
Health Physics Network
NOC-AE-02001335, Proposed License Amendment to Eliminate the Turbine Missile Design Basis14 November 2002Proposed License Amendment to Eliminate the Turbine Missile Design BasisTurbine Missile
NOC-AE-02001429, October 2002 Monthly Operating Report for South Texas Project Units 1 & 214 November 2002October 2002 Monthly Operating Report for South Texas Project Units 1 & 2
ML02310013113 November 2002Memo Draft Documents for June 26, 2002 Through October 28, 2002
NOC-AE-02001339, Revised Request to Implement a Risk-Informed Inservice Testing Program for Pumps and Valves Beginning the Second 10-Year Interval (Relief Request RR-ENG-IST-2-01)12 November 2002Revised Request to Implement a Risk-Informed Inservice Testing Program for Pumps and Valves Beginning the Second 10-Year Interval (Relief Request RR-ENG-IST-2-01)Probabilistic Risk Assessment
Exemption Request
ML02322016012 November 2002Part 2 of 2, South Texas, Revised Request to Implement a Risk-Informed Inservice Testing Program for Pumps and Valves Beginning the Second 10-Year Interval (Relief Request RR-ENG-IST-2-01), Attachments 4 - 6Safe Shutdown
Boric Acid
Ultimate heat sink
Stroke time
Probabilistic Risk Assessment
Foreign Material Exclusion
Large early release frequency
Cold shutdown justification
ML02322012512 November 2002Part 1 of 2, South Texas, Revised Request to Implement a Risk-Informed Inservice Testing Program for Pumps and Valves Beginning the Second 10-Year Interval (Relief Request RR-ENG-IST-2-01), Attachments 1 - 3Safe Shutdown
Boric Acid
High winds
Stroke time
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Incorporated by reference
Large early release frequency
Cold shutdown justification
Exemption Request
Maintenance Rule Program
Power-Operated Valves
ML02337037611 November 2002Emergency Plan Implementing Procedures, Attachment 2Safe Shutdown
Unanalyzed Condition
Fitness for Duty
Health Physics Network
Fuel cladding
ML0231200227 November 2002Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs GroupMissed surveillance
Recently irradiated fuel
ML0229005525 November 2002Summary Staff Evaluations of 90-Day Steam Generator Tube Inspection Reports for Refueling Outages 7 & 8
TAC:MA81165 November 2002
ML0230904545 November 2002Relief, American Society of Mechanical Engineers Code Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds. TAC Nos. MB6576 & MB6577Boric Acid
Weld Overlay
Nondestructive Examination
Incorporated by reference
Liquid penetrant
TAC:MB65765 November 2002
NOC-AE-02001368, E-mail Kenneth Taplett to Mohan Thadani, Replacement Page NOC-AE-020013684 November 2002E-mail Kenneth Taplett to Mohan Thadani, Replacement Page NOC-AE-02001368Shutdown Margin
ML0230905504 November 2002Generic Fundamentals Examination - Copy of PWR & BWR GFEs & Answer Keys Available on NRCs Website 60 Days Following ExamGeneric Fundamentals Examination
NOC-AE-02001425, Letter Regards End of Life Moderator Temperature Coefficient31 October 2002Letter Regards End of Life Moderator Temperature Coefficient
NOC-AE-02001427, Second Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval31 October 2002Second Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection IntervalBoric Acid
Weld Overlay
Nondestructive Examination
Liquid penetrant
NOC-AE-02001424, Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval31 October 2002Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection IntervalBoric Acid
Weld Overlay
Nondestructive Examination
Liquid penetrant
NOC-AE-02001411, Letter from J. J. Sheppard to Ellis Merschoff Final Report from Management Insight Technologies for 2002 Focused Cultural Assessment for South Texas Project30 October 2002Letter from J. J. Sheppard to Ellis Merschoff Final Report from Management Insight Technologies for 2002 Focused Cultural Assessment for South Texas Project
ML02277023430 October 2002Savety Evaluation Regarding License Amendment Request Proposed Amendment to the South Texas Project Technical Specifications to Revise Administrative Control Requirements
TAC:MB358930 October 2002
ML02311010325 October 2002Comment from D. R. Woodlan on DG-1099, Anchoring Components and Structural Supports in Concrete.Backfit