NOC-AE-02001426, Changes to Emergency Plan & Implementing Procedures

From kanterella
Jump to navigation Jump to search
Changes to Emergency Plan & Implementing Procedures
ML023360456
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/21/2002
From: Serra P
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ER 20020061, NOC-AE-02001426, STI: 31515209
Download: ML023360456 (6)


Text

Nuclear Operating Company South 7r=sProjcc Electric GCevtlqn StaUon PO. &ox28.9 Wadsot Trerns 7748,3 November 21, 2002 NOC-AE-02001426 STI: 31515209 FILE NO: Z18 ER 20020061 10CFR50.4(b)(5) 10CFR50 App E U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 STP NUCLEAR OPERATING COMPANY Units 1 and 2 Docket Nos. STN 50-498; STN 50-499 Changes to Emergency Plan & Implementing Procedures In accordance with 10CFR50.4(b)(5) and 10CFR50, Appendix E, Section V, the STP Nuclear Operating Company hereby submits the attached revisions to the STPEGS Emergency Plan and Seven Emergency Plan Implementing Procedures.

If there are any questions regarding this matter, please contact either Mr. Morgan at (361) 972 7004 or me at (361) 972-8053.

P. L. Serra Manager, Plant Protection PLS/mk

Enclosure:

Letter of Receipt Description of Changes STPEGS Emergency Plan, Rev. ICN 20-1 OERP01-ZV-EF03, Radiological Director, Rev.8 0ERP01-ZV-EF08, Licensing Director, Rev. 6 0ERP01-ZV-EF10, Offsite Field Team Supervisor, Rev. 6 OERP01-ZV-EF25, Site Public Affairs Coordinator, Rev. 6 OERP01-ZV-IN02, Notifications to Offsite Agencies. Rev. 15 OERP01-ZV-OFO 1, Alternate Emergency Operations Facility Activation, Operation, and Deactivation, Rev. 3 0ERP01-ZV-OF02, Joint Information Center Activation, Operation, and Deactivation, Rev. 4

NOC-AE-02001426 STI: 31515209 FILE NO: Z18 ER 20020061 Page 2 cc:

(paper copy) (electronic copy)

Emergency Planning Coordinator (2 copies) A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 M. T. Hardt/W. C. Gunst Arlington, Texas 76011-8064 City Public Service U. S. Nuclear Regulatory Commission Mohan C. Thadani Attention: Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom/D. G. Tees Rockville, MD 20852 Texas Genco LP Richard A. Ratliff A. Ramirez Bureau of Radiation Control City of Austin Texas Department of Health 1100 West 49th Street C. A. Johnson/A. C. Bakken III Austin, TX 78756-3189 AEP - Central Power and Light Company Cornelius F. O'Keefe Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. O. Box 289, Mail Code: MN116 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

NOC-AE-02001426 STI: 31515209 FILE NO: Z18 ER 20020061 Page 3 To: P.L. Serra Manager, Plant Protection STP Nuclear Operating Company P. 0.Box 289 Wadsworth, TX 77483 From: Emergency Planning Coordinator Region IV Office of the Regional Administrator U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-8064

Subject:

Receipt Acknowledgment for Changes to STP Emergency Plan Implementing Procedure I hereby acknowledge having received changes to the STP Nuclear Operating Company's Emergency Plan Implementing Procedures transmitted by STP letter NOC-AE-02001426.

Signature Date

Description of Changes for STPEGS Emergency Plan Revision ICN 20-1 This Revision of the STPEGS Emergency Plan does not reduce its effectiveness or change the intent of the Emergency Response Program.

NO. CHANGE TO REV. 20 REASON

1. Section A, page 1, changed Reliant Energy Company name has changed.

to Texas Genco LP.

2. Section A, page 1, changed Central Power Company name has changed.

and Light Company to American Electric Power-Central Power and Light Company

3. Section A, page 5, step A.7, revised EPZ Used new 2002 census data.

population data.

4. Section A, page 5, new step A.8, added Describes public access to the OCA.

Owner Control Area Public Access description.

5. Section A, Table A-i, page 6, revised Revised data from 2002 Census.

population numbers per census update.

6. Section A, Table A-2, page 7, revised Revised data from 2002 Census.

population numbers per census update.

7. Section B, page 6, step B.4.6 replaced Backup EAS Radio Stations have changed.

reference to KIOX FM, 96.9 with KZRC FM (92.5).

8. Section B, page 7, steps B.4.8 and new step United States Coast Guard has two districts B.4.9. United States Coast Guard, split apart described in the Emergency Plan.

Galveston and Corpus Christi Districts.

9. Section B, page 10, steps B.5.10 changed Company name has changed.

Duke Engineering Services to Framatome Environmental Lab.

10. Section C, page 12, changed JIC position Better describes this position's function.

title from Media Monitoring Rumor Control to Public Inquiry.

NO. CHANGE TO REV. 20 REASON

11. Section C, Figure C-4, page 19, removed This position has no procedure, Eplan Assistant Radiological Director purpose or responsibilities and was determined redundant by the ERO.
12. Section C, Figure C-5, page 20, changed JIC Better describes this position's function.

position title from Media Monitoring Rumor Control to Public Inquiry.

13. Section C, Figure C-5, page 20, changed JIC Better describes this position's function.

position title from Media Monitoring Rumor Control to Public Inquiry.

14. Section E, Addendum E-l, page 7, step Name changed for clarification.

3.1.1.4 title changed QSE to STP Coordinator.

15. Section E, Addendum E-1, page 8, step 3.1.2 Company name has changed.

changed Reliant Energy to Texas Genco LP.

16. Section E, Addendum E-1, page 9, step 3.1.2 Name changed for clarification.

title changed QSE to STP Coordinator.

17. Section G, page 7, steps G.9 changed Duke Company name has changed.

Engineering Services to Framatome Environmental Lab.

18.Section I, page 2, step 1.5 replaced reference Backup EAS Radio Stations have changed.

to KIOX FM, 96.9 with KZRC-FM (92.5).

19.Section I, Figure I-1, page 4, revised Revised data from 2002 Census.

population numbers per census update.

20. Section K, page 4, step K.5.4 changed JIC Better describes this position's function.

position title from Media Monitoring Rumor Control to Public Inquiry.

21. Section K, page 6, step K.9.1 changed JIC Better describes this position's function.

position title from Media Monitoring Rumor Control to Public Inquiry.

22. Attachment 2, page 4, deleted procedure Procedure steps have been reassigned to OERPO 1-ZV-TS 12, Security Supervisor. procedure 0ERP01-ZV-TS08, Security Manager.

Description of Changes Procedure OERP01-ZV-EF03, Radiological Director, Rev. 8 Editorial corrections, page 6, step 1.2, removed the Assistant Radiological Director because This position has no procedure, Eplan purpose or responsibilities and was determined redundant by the ERO.

Procedure OERPO1-ZV-EF08, Licensing Director, Rev. 6 Changed procedure usage from Referenced to N/A. Deleted Assistant Radiological Director because the position has been deleted from the ERO. Combined Data Sheets 1-3 revised 4.0 Procedure steps to reflect changes. Page 5, step 1.3, change Chemical/Radiochemical Manager to the ENS Communicator or Operations Manager. Page 5, step 1.6, deleted Chemical/Radiochemical Manager. Page 7, step 2.4.3, Added reference to procedure OERPO1-ZV-OFO1. Page 9, step 6.1, changed the Vice President, Nuclear Assurance and Licensing with the Manager Quality and Licensing.

Procedure 0ERP01-ZV-EF10, Offsite Field Team Supervisor, Rev. 6 Deleted the position of Assistant Radiological Director. Data Sheet 1, Page 6, step 2.1.2, added PAR escalation paths. step 2.1.3, added develop a strategy for Offsite Field Team placement. Page 7, step 3.2, added Offsite Field Team PAR escalation criteria. Page 9, step 3.6.2, and page 15, added Potassium Iodide is most effective when taken just before or within 1-2 hours after exposure to radioibdine. This information is from the NRC Response Technical Manual (RTM-96).

Procedure OERP01-ZV-EF25, Site Public Affairs Coordinator, Rev. 6 Page 12, changed calendar to telephone book. Page 16, name change, Reliant Energy to Texas Genco LP and Central Power & Light to American Electric Power - Central Power & Light. Page 20, step 1.10, added direction to provide the Website password to JIC. Pages 5, 8, 9, 10, 11, and 12, Replaced radio stations KIOX-FM, 96.9 and KXGJ-FM (101.7) with KZRC-FM (92.5).

Procedure OERPO1-ZV-IN02, Notifications To Offsite Agencies, Rev 15

  • Editorial corrections, changed Reliant Energy to Texas Genco LP on the following pages: 19, 20, 21, &
22. Page 13, Data Sheet 3, revised STP Coordinator telephone number.

Procedure OERPO1-ZV-OF01, Alternate Emergency Operations Facility Activation, Operation, and Deactivation, Rev 3

  • Editorial corrections, page 6, step 5.3.1.b, removed the Assistant Radiological Director because the "positionhas been deleted from the Emergency Plan.

Procedure OERP01-ZV-OF02, Joint Information Center Activation, Operation, and Deactivation, Rev 4 Global title change from Media Monitoring/Rumor Control Manager to Public Inquiry Manager. Moved responsibilities from Addendum 1 to step 2.0. Page 8, step 3.12, Added responsibility of Media relations Technical Spokesperson. Added reference to ZV-0009, Joint Information Center Administrative Support Guide. Added Page 11, Addendum 1, Development of shift schedules.