Text

Nuclear Operating Com~pany December 12, 2002 NOC-AE-02001436 File No.: G02 10CFR50.71 STI: 31530389 U. S. Nuclear Regulatory Commission Attention: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Monthly Operating Reports for November 2002 Pursuant to 10CFR50.71(a) and South Texas Project Electric Generating Station (STPEGS) Technical Specification 6.9.1.5, attached are the Monthly Operating Reports for November 2002. If you should have any questions on this matter, please contact R.L.

Hill at (361) 972-7667.

F.H. Mallen Manager, Planning &

Controls Attachments: 1) STPEGS Unit I Monthly Operating Report - November 2002

2) STPEGS Unit 2 Monthly Operating Report - November 2002

cc:

(paper copy) (electronic copy)

Ellis W. Merschoff A. H. Gutterman, Esquire Regional Administrator, Region IV Morgan, Lewis & Bockius LLP U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 M. T. Hardt/W. C. Gunst Arlington, Texas 76011-8064 City Public Service U. S. Nuclear Regulatory Commission Mohan C. Thadani Attention: Document Control Desk U. S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike R. L. Balcom/D. G. Tees Rockville, MD 20852 Texas Genco, LP Richard A. Ratliff A. Ramirez Bureau of Radiation Control City of Austin Texas Department of Health 1100 West 49th Street C. A. Johnson/A. C. Bakken III Austin, TX 78756-3189 AEP - Central Power and Light Company Cornelius F. O'Keefe Jon C. Wood U. S. Nuclear Regulatory Commission Matthews & Branscomb P. 0. Box 289, Mail Code: MN1 16 Wadsworth, TX 77483 C. M. Canady City of Austin Electric Utility Department 721 Barton Springs Road Austin, TX 78704

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 1 MONTHLY OPERATING REPORT NOVEMBER 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-498 LICENSE NO. NPF-76 Approved By:t 2

E.D. HALPMT'qvý Date

MONTHLY

SUMMARY

South Texas Project Unit 1 began the reporting period operating at full power.

On November 16, at 2042 hours0.0236 days <br />0.567 hours <br />0.00338 weeks <br />7.76981e-4 months <br />, Unit 1 was manually tripped in response to a perceived loss of all pressure associated with the Open Loop Cooling Water System. The apparent loss of pressure in the Open Loop Cooling Water system was induced by a failure of the pump casing on Circulating Water Pump 11. A pressure spike that occurred when the pump discharge valve failed closed caused the pump casing failure.

Repairs were made and the unit was returned to service on November 24, at 1520. Full power was achieved on November 25, at 1154.

OPERATING DATA REPORT DOCKET NO. 50-498 UNIT I DATE Dec. 11, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 11/1/02-11/30/02 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (Mwt): 3,853 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.6 DESIGN ELECTRICAL RATING (MWe-Net): 1,250.
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 539.2 97,785.1
6. REACTOR RESERVE SHUTDOWN HOURS 0 0 0
7. HOURS GENERATOR ON LINE 533.4 7,829.4 96,149.1
8. UNIT RESERVE SHUTDOWN HOURS 0 0 0 1,998,978 29,812,275. 359,110,615
9. GROSS THERMAL ENERGY GENERATED (MWH) 666,723 9,914,392 117,262,506
10. NET ELECTRICAL ENERGY GENERATED (MWH)
11. REACTOR SERVICE FACTOR (%) 74.9 97.7 78.2
12. REACTOR AVAILABILITY FACTOR (%) 74.9 97.7 78.2
13. UNIT SERVICE FACTOR (%) 74.1 97.7 76.9
14. UNIT AVAILABILITY FACTOR (%) 74.1 97.7 76.9
15. UNIT CAPACITY FACTOR - Using MDC (%) 74.0 98.9 75.0
16. UNIT CAPACITY FACTOR - Using DER (%) 74.0 98.9 75.0
17. UNIT FORCED OUTAGE RATE (%) 25.9 2.3 13.4
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH):

Scheduled 22-day outage to allow scheduled refueling to begin on March 26, 2003.

19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-498 UNIT I DATE Dec. 11, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH NOVEMBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 1279 17 0 2 1280 18 0 3 1281 19 0 4 1280 20 0 5 1281 21 0 6 1274 22 0 7 1278 23 0 8 1283 24 44 9 1282 25 1052 10 1282 26 1279 11 1283 27 1273 12 1286 28 1267 13 1287 29 1268 14 1287 30 1270 15 1285 16 1101

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-498 UNIT 1 DATE Dec. 11, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH NOVEMBER 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective Action to Prevent Recurrence (Hours) Shutting Event Code Code Down Report #

Reactor 02-02 021116 F 186.6 A 2 01-02-003 NN P Manual reactor trip in response to a perceived loss of all pressure associated with the Open Loop Cooling Water System. The apparent loss of pressure in the Open Loop Cooling Water system was induced by a failure of the pump casing on Circulating Water Pump 11. A pressure spike that occurred when the pump discharge valve failed closed caused the pump casing failure.

I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged during the reporting period.

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION UNIT 2 MONTHLY OPERATING REPORT NOVEMBER 2002 STP NUCLEAR OPERATING COMPANY NRC DOCKET NO. 50-499 LICENSE NO. NPF-80 Approved By: 20 ) L LLL E.D HALPPN4 Date

MONTHLY

SUMMARY

South Texas Project Unit 2 remained shutdown during the reporting period for scheduled refueling and steam generator replacement.

OPERATING DATA REPORT DOCKETNO. 50-499 UNIT 2 DATE Dec. 11, 2002 COMPLETED BY R L Hill TELEPHONE 361.972.7667 OPERATING STATUS

1. REPORTING PERIOD: 11/1/02-11/30/02 GROSS HOURS IN REPORTING PERIOD: 720
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 3,800 MAXIMUM DEPENDABLE CAPACITY (MWe-Net): 1,250.

DESIGN ELECTRICAL RATING (MWe-Net): 1,250.6

3. POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net): None
4. REASONS FOR RESTRICTION (IF ANY): N/A THIS MONTH YR TO DATE CUMULATIVE
5. NUMBER OF HOURS REACTOR CRITICAL 0 6,480.3 94,294.3
6. REACTOR RESERVE SHUTDOWN HOURS 0 0
7. HOURS GENERATOR ON LINE 0 6,,426.8 92,054.50
8. UNIT RESERVE SHUTDOWN HOURS 0 0 24,457,687 343,618,219
9. GROSS THERMAL ENERGY GENERATED (MWH) 00 7,962,417 111,920,538
10. NET ELECTRICAL ENERGY GENERATED (MWH)
11. REACTOR SERVICE FACTOR (%) 0. 80.8 80.0 0.0
12. REACTOR AVAILABILITY FACTOR (%) 00 80.8 80.0
13. UNIT SERVICE FACTOR (%) 0.0 80_2 78.1
14. UNIT AVAILABILITY FACTOR (%) 0.0 802 78.1 0.0
15. UNIT CAPACITY FACTOR - Using MDC (%) 0.0 79.4 75.9
16. UNIT CAPACITY FACTOR - Using DER (%) 0.0 79.4 75.9
17. UNIT FORCED OUTAGE RATE (%) 2.3 13.2
18. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, & DURATION OF EACH): N/A
19. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: 12/5/02

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-499 UNIT 2 DATE Dec. 11, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 MONTH NOVEMBER DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 0 17 2 18 0

3 0 19 4 0 20 5 21 0

6 22 0

7 23 0

8 24 0

9 25 00 10 26 0

11 27 0

12 28 0

13 29 0

14 30 15 0 16 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-499 UNIT 2 DATE De.11, 2002 COMPLETED BY R.L. Hill TELEPHONE 361.972.7667 REPORT MONTH NOVEMBER Cause & Corrective Action to Prevent Recurrence Scheduled outage to allow refueling and steam generator replacement.

I 2 3 4 5 F: Forced Reason: Method: IEEE 805-1983 IEEE 803-1983 S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 3-Automatic Scram D-Regulatory Restriction 4-Cont. of Existing E-Operator Training & License Exam Outage F-Administrative 5-Reduction G-Operational Error (Explain) 9-Other H-Other (Explain)

PORVS AND SAFETY VALVE

SUMMARY

There were no PORV or Safety Valves challenged dtiring the reporting period.