Letter Sequence Other |
|---|
|
Results
Other: ML023390078, ML023400252, ML023400524, ML023510258, ML023540357, ML030780031, NOC-AE-02001434, Revision 2 to Unit 1 Cycle 11 Core Operating Limits Report, NOC-AE-03001488, Cycle 11, Revisions 3 & 4, & South Texas Project Unit 2 Cycle 10, Revision 1, Core Operating Limits Reports
|
MONTHYEARML0215402642002-05-23023 May 2002 Application for Amendment to Several Sections of TS & Unit 2 Operating License to Delete Information Specific to Model E Steam Generators Project stage: Request ML0230903272002-10-31031 October 2002 Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval Project stage: Request ML0234002522002-11-26026 November 2002 License Amendments, Revising End of Life Moderator Temperature Coefficient Surveillance Requirements Project stage: Other ML0234005242002-11-26026 November 2002 Technical Specifications Pages for Amendmentds 144 & 132 End of Life (Eol) Moderator Temperature Coefficient (Mtc) Surveillance Requirements Project stage: Other ML0233900782002-11-26026 November 2002 Technical Specifications Pages for Amendmentds 144 & 132 End of Life (Eol) Moderator Temperature Coefficient (Mtc) Surveillance Requirements Project stage: Other NOC-AE-02001434, Revision 2 to Unit 1 Cycle 11 Core Operating Limits Report2002-12-11011 December 2002 Revision 2 to Unit 1 Cycle 11 Core Operating Limits Report Project stage: Other ML0235403572002-12-11011 December 2002 To Unit 1 Cycle 11 Core Operating Limits Report Project stage: Other ML0235102582002-12-11011 December 2002 To the Unit 1 Cycle 11 Core Operating Limits Report Project stage: Other NOC-AE-03001488, Cycle 11, Revisions 3 & 4, & South Texas Project Unit 2 Cycle 10, Revision 1, Core Operating Limits Reports2003-03-12012 March 2003 Cycle 11, Revisions 3 & 4, & South Texas Project Unit 2 Cycle 10, Revision 1, Core Operating Limits Reports Project stage: Other ML0307800312003-03-12012 March 2003 Cycle 11, Revisions 3 & 4, & South Texas Project Unit 2 Cycle 10, Revision 1, Core Operating Limits Reports Project stage: Other 2002-12-11
[Table View] |
Text
REACTIVITY CONTROL SYSTEMS SURVEILLANCE REQUIREMENTS 4.1.1.3 The MTC shall be determined to be within its limits during each fuel cycle as follows:
- a. The MTC shall be measured and compared to the BOL limit specified in the COLR prior to initial operation above 5% of RATED THERMAL POWER, after each fuel loading; and
- b.
The MTC shall be measured at any THERMAL POWER and compared to the 300 ppm surveillance limit specified in the COLR (all rods withdrawn, RATED THERMAL POWER condition) within 7 EFPD after reaching an equilibrium boron concentration of 300 ppm.* In the event this comparison indicates the MTC is more negative than the 300 ppm surveillance limit specified in the COLR, the MTC shall be remeasured, and compared to the EOL MTC limit specified in the COLR, at least once per 14 EFPD during the remainder of the fuel cycle.
Measurement of the MTC in accordance with Surveillance Requirement 4.1.1.3.b may be suspended, provided that the benchmark criteria in WCAP-1 3749-P-A (refer to 6.9.1.6.b.10) and the Revised Prediction specified in the COLR are satisfied.
SOUTH TEXAS - UNITS 1 & 2 3/4 1-7 Unit 1 - Amendment No. 27,' 144 Unit 2 - Amendment No. T7; 132 I