Meeting Handouts - Meeting with Strategic Teaming and Resources Sharing - Integrated Regulatory Affairs Group
ML023120022
Person / Time
Site: Palo Verde, South Texas  STP Nuclear Operating Company icon.png
Issue date: 11/07/2002
From: Donohew J
NRC/NRR/DLPM/LPD4
To:
References
Download: ML023120022 (13)


Text

NRC FORM 658 U.S. NUCLEAR REGULATORY COMMISSION (9-1999)

TRANSMITTAL OF MEETING HANDOUT MATERIALS FOR IMMEDIATE PLACEMENT IN THE PUBLIC DOMAIN This form is to be filled out (typed or hand-printed)by the person who announced the meeting (i.e., the person who issued the meeting notice). The completed form, and the attachedcopy of meeting handout materials,will be sent to the Document ControlDesk on the same day of the meeting; under no circumstanceswill this be done later than the working day after the meeting.

Do not include proprietarymaterials.

DATE OF MEETING The attached document(s), which was/were handed out in this meeting, is/are to be placed 11/07/2002 in the public domain as soon as possible. The minutes of the meeting will be issued in the near future. Following are administrative details regarding this meeting:

Docket Number(s) 50-528, 50-529, 50-530, 50-498, 50-499 Plant/Facility Name Palo Verde, South Texas TAC Number(s) (ifavailable) Not Applicable Reference Meeting Notice ML022740090 dated October 10, 2002 Purpose of Meeting (copy from meeting notice) Meeting with Strategic Teaming and Resources Sharing Integrated Regulatory Affairs Group NAME OF PERSON WHO ISSUED MEETING NOTICE TITLE Jack Donohew Senior Project Manager OFFICE Office of Nuclear Reactor Regulation DIVISION Division of Licensing Project Management BRANCH Project Directorate IV Distribution of this form and attachments:

Docket File/Central File PUBLIC NRC FORM 658 (9-1999) PRINTED ON REC.YCLEDP-UI-APER:: mI sl1 n wasTIdesgnd*

IInIusn IIIUII n*II

Strategic Teaming and Resource Sharing "Agenda

  • Introductions
  • Successes
  • Common Licensing Actions
  • RASIG
  • STARS/NRC Workshop
  • Areas for Improvement/ Open Discussion 10/31/2002 2

Strategic Teaming and Resource Sharing Successes

"* Common Licensing Actions Submitted

- Review Savings

- Burden Reduction

"* Generic Regulatory Issues

- Review of rulemaking, draft regulatory guides, etc.

- Bulletin 2002-01 and 2002-02 Responses

  • Security Order Response 10/31/2002 3

Strategic Teaming and Resource Sharing Common Licensing Actions

  • Past Common Submittals

- Bases Control Program (50.59 Rule) - TSTF-364

- Risk Informed Inservice Inspection (ISI)

- Elimination of PASS Requirements - TSTF-366

- Low Power Calorimetric - TSTF-371

- Positive Flux Rate Trip 10/31/2002 4

Strategic Teaming and Resource Sharing Common Licensing Actions

  • Common LARs under review

- Equipment Hatch Open during Fuel Movement (DC)

- Deletion of License Condition for 24 Hour Report (CP)

- Positive Reactivity Additions (DC)

- Reduced NIS Channels (CA, WC) 10/31/2002 5

Strategic Teaming and Resource Sharing iR , S STARS Projects NRC Cost Savings Project LICENSEE Est. Proiect Cost Lead Description AmerenUE WCNOC TXU PG&E STP APS Savings Utility Deletion of TS 5.5.3, Post NRC Cost $993 60 $73440 $2,550 00 $1,152 00 $45000 $2,245 00 $2.550.00 WCNOC Accident Sampling (TSTF 366) Saving Est. $1,556 00 NA $000 $139800 $210000 NA $5,054.40 Risk Informed Inservice NRC Cost $9,083.40 $16,985 40 $34,530 00 $9,374 40 $5,423 60 NA $34,530.00 TXU Inspection (Code Case N-578)

Saving Est. $25,446 60 $17,544 60 $000 $25,155 60 $29,106 40 NA $97,253.20 (1)

Allow the containment NRC Cost $2,670.00 $4,703.40 $5,190 00 $10,215 00 $10,740 00 $6,255 00 $4,703 40 WCNOC equipment hatch open during fuel movement Saving Est. $2,520.00 $487.60 $000 NA NA NA $3007 60 Revision to TS 5 5 14, Bases NRC Cost $1,512.00 $691.20 $3,744.00 $1,440 00 NA $2,300 00 $3,744 00 TXU Control Program (TSTF-364)

Saving Est. $2,232.00 $3,052.80 $000 $2,304.00 NA $1,444 00 $9,032 80 Expanded COLOR (TSTF 339 NRC Cost (2) $11,184.00 (3) (2) (3) NA $11,184 00 WCNOC

& 363)

Saving Est. $000 NA $000 Missed Surveillance NRC Cost (4) $2,250 00 $1,035 00 $1,200 00 $2,550.00 $2,100 00 $1,20 000 $2,250 00 AUE Requirements SR 3 0 3 (TSTF 358) Saving Est. $0.00 $1,215.00 $1,050 00 ($30000) $15000 $1,050 00 $3,165 00 Revised Low Power NRC Cost $1,500 00 (4) NA (2) NA NA $1,500 00 AUE Calorimetric Surveillance (SR 331 2) Saving Est. $000 $000 Revision to TS Regarding NRC Cost $9,105 00 $5,295 00 (2) (4) (4) (2) $9,105.00 AUE Suspension of Positive Reactivity Additions Saving Est. $000 $3,810 00 $3,810 00 (1) Estimate additional $50,000 saved (generic review costs spread out among applicants other than TXU)

(2) Not yet submitted (3) Approved pre-STARS (4) More charges expected 10/31/2002 6

Strategic Teaming and Resource Sharing I I IF Future LARs - Scheduled 2002/03 Licensing Action Participants/ Schedule Lead Plant Priority TSTF-283 Rev. 3, Mode restrictions for CA WC ST CP DC PV Last quarter of CP SRs in Electrical Specifications Y Y N Y Y Y 2002 or early Doug 2003 Spalding TSTF-360, Revision of DC Electrical CA WC ST CP DC PV Last quarter of CP Specifications D N Y Y D 2002 or early Mike 2003 Riqqs TSTF-359 Rev. 7, "Allow mode CA WC ST CP DC PV Last quarter of DC changes when not meeting certain 2002

  • Ken LCOs" Y Y Y Y Y Y Schrader TSTF-370, "Increase in Accumulator CA WC ST CP DC PV Last quarter CP- Bob Completion Time from 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> to 24 A A A Y Y A 2002. Dacko hours (WCAP-1 5049)," CLIIP Item.

SER in the FR 07/02 with comments due 08/02.

TSTF-411 WCAP-15376, "Risk- CA WC ST CP DC PV Submit end of WC/CA Informed Assessment of the RTS & Y Y Y Y Y N 2nd quarter - Bert ESFAS Surveillance Test Intervals 2003 Yates and Reactor Trip Breaker Test and Completion Times," and associated TSTF-411. Work with TSTF-418.

Worked together, or back to back.

TSTF-418 WCAP-14333 Rev. 1, CA WC ST CP DC PV Submit end of WC/CA "Relaxation of RPS/ESF Completion Y Y A Y Y N 2nd quarter - Bert Times" and associated TSTF-418 2003 Yates submitted 9/01.

  • - Schedules are dependent on NRC approval of topical reports and/or TSTF.

"A S = submitted, N = No (Not Applicable), Y = Yes (Applies), A = Approved, * =

Applicability undetermined, D = Deferred 10/31/2002 7

Ag Strategic Teaming and Resource Sharing Other Future LARs Licensing Action Participants/ P Schedule Lead Plant Priority TSTF-417 WCAP-15622, Extend the CA WC ST CP DC PV H To be CA - Mike AOTs for AC Electrical Power Systems Y Y N Y Y N submitted by Riggs and supporting TSTF-417 end of 2003 TSTF - ???? CA WC ST CP DC PV H Estimate - CA - Tom Allows removal of the hydrogen Y Y Y y y y Sometime in Elwood recombiners and requirements for 2003

  • hydrogen (and oxygen) monitors from the TS. In addition will allow downgrading of the quality requirements for hydrogen monitors.

TSTF-51, "Recently Irradiated Fuel" in CA WC ST CP DC PV M Second PV place of "Irradiated Fuel" Remove y y y y y Y Quarter 2003 Rodney restriction during fuel movement Wilford TSTF-372 Rev. 2, New LCO 3.0.8 for CA WC ST CP DC PV M Third quarter CP Inoperability of Snubbers Y Y N Y Y Y 2003

  • First plant Inspection Elimination Risk Assessment" affected and supporting TSTF-421. Y Y Y Y N Y

"*- Schedules are dependent on NRC approval of topical reports and/or TSTF.

"t S = submitted, N = No (Not Applicable), Y = Yes (Applies), A = Approved, ? =

10/31/200 2 Applicability undetermined, D = Deferred 8

I Strategic Teaming and Resource Sharing RASIG

  • Regulatory Affairs Strategic Issues Group

"* First STARS Center of Business (COB)

"* Staff:

- Manager (IRAG Chairman) - Don Woodlan

- STARS Washington Representative - Rich Luckett

- Projects Manager - Diane Hooper 10/31/2002 9

Strategic Teaming and Resource Sharing RASIG Products

"* Strategic Issue Summaries

"* Briefing papers for STARS management

"* Recommended strategies, priorities, actions or comments on regulatory issues in the form of white papers (position papers), draft letters, etc.

10/31/2002 10

'T Strategic Teaming and Resource Sharing STARS/NRC Licensing Workshop

"* Proposal STARS to host a joint NRC/STARS Region IV Licensing Workshop during 2003

"* Discussion

- Purpose & Goal of Workshop

- NRC Support

- Possible Dates and Locations 10/31/2002 1l

Strategic Teaming and Resource Sharing i///

Challenges / Areas for Improvement / Lessons Learned

"* Challenges (Security Orders, Steam Generator Inspections, Reactor Vessel Head Inspections)

"* Areas for Improvement / Lessons Learned

- Formats, commonality, parallel versus staggered submittals, lead NRR PMs

"* Open Discussion 10/31/2002 12