MONTHYEARML0215402642002-05-23023 May 2002 Application for Amendment to Several Sections of TS & Unit 2 Operating License to Delete Information Specific to Model E Steam Generators Project stage: Request ML0230903272002-10-31031 October 2002 Revised Request for Relief from ASME Section XI Requirements for Repair/Replacement Activity of Control Rod Drive Mechanism Canopy Seal Welds in Accordance with IWA 4000, for the Second Ten-Year Inservice Inspection Interval Project stage: Request ML0234002522002-11-26026 November 2002 License Amendments, Revising End of Life Moderator Temperature Coefficient Surveillance Requirements Project stage: Other ML0234005242002-11-26026 November 2002 Technical Specifications Pages for Amendmentds 144 & 132 End of Life (Eol) Moderator Temperature Coefficient (Mtc) Surveillance Requirements Project stage: Other ML0233900782002-11-26026 November 2002 Technical Specifications Pages for Amendmentds 144 & 132 End of Life (Eol) Moderator Temperature Coefficient (Mtc) Surveillance Requirements Project stage: Other NOC-AE-02001434, Revision 2 to Unit 1 Cycle 11 Core Operating Limits Report2002-12-11011 December 2002 Revision 2 to Unit 1 Cycle 11 Core Operating Limits Report Project stage: Other ML0235403572002-12-11011 December 2002 To Unit 1 Cycle 11 Core Operating Limits Report Project stage: Other ML0235102582002-12-11011 December 2002 To the Unit 1 Cycle 11 Core Operating Limits Report Project stage: Other NOC-AE-03001488, Cycle 11, Revisions 3 & 4, & South Texas Project Unit 2 Cycle 10, Revision 1, Core Operating Limits Reports2003-03-12012 March 2003 Cycle 11, Revisions 3 & 4, & South Texas Project Unit 2 Cycle 10, Revision 1, Core Operating Limits Reports Project stage: Other ML0307800312003-03-12012 March 2003 Cycle 11, Revisions 3 & 4, & South Texas Project Unit 2 Cycle 10, Revision 1, Core Operating Limits Reports Project stage: Other 2002-12-11
[Table View] |
Text
ADMINISTRATIVE CONTROLS CORE OPERATING LIMITS REPORT (Continued)
- 9. CENPD-397-P-A, Revision 01, "Improved Flow Measurement Accuracy Using Crossf low Ultrasonic Flow Measurement Technology," May 2000.
(Methodology for operating at a RATED THERMAL POWER of 3,853 Mwt)
- 10.
WCAP-13749-P-A, "Safety Evaluation Supporting the Conditional Exemption of the Most Negative EOL Moderator Temperature Coefficient Measurement," March 1997, F_ Proprietary)
(Methodology for Specification 3.1.1.3 - Moderator Temperature Coefficient.)
6.9.1.6.c The core operating limits shall be determined so that all applicable limits (e.g., fuel thermal mechanical limits, core thermal-hydraulic limits, ECCS limits, nuclear limits such as shutdown margin, and transient and accident analysis limits) of the safety analysis are met.
SOUTH TEXAS - UNITS 1 & 2 6-22a Unit 1 - Amendment No. 1-38, 144 Unit 2 -Amendment No. 127,' 132