Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
CAC:MF4462 | 30 September 2016 | ||
ML16273A430 | 30 September 2016 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Vents) | Ultimate heat sink FLEX Fukushima Dai-Ichi Containment Hardened Vent Earthquake |
ML16281A271 | 30 September 2016 | Part 21 - Safety Related Component Welding by an Unqualified Welder | |
RS-16-199, Supplement to Request for License Amendment Regarding Transition to Areva Fuel | 28 September 2016 | Supplement to Request for License Amendment Regarding Transition to Areva Fuel | Post Accident Monitoring Surveillance Frequency Control Program |
IR 05000237/2016301 | 22 September 2016 | NRC Initial License Examination Report 05000237/2016301; 05000249/2016301 | Job Performance Measure |
CAC:MF8238 | 20 September 2016 | ||
ML16253A125 | 20 September 2016 | Fleet License Amendment Request to Revise Technical Specification Requirements for Inservice Testing Program (CAC Nos. MF8238 - MF8256) | |
ML16230A237 | 6 September 2016 | Fleet Request for Proposed Alternative to Use ASME Code Case N-513-4 (CAC Nos. MF7301-MF7322) | Incorporated by reference Through-Wall Leak |
ML17128A170 | 1 September 2016 | 2016 Dresden Nuclear Station Initial License Examination As-Administered Scenarios | Half scram Scram Discharge Volume Earthquake Power change |
ML16251A076 | 1 September 2016 | Independent Spent Fuel Storage Installation, Annual Radioactive Effluent Release Report | Annual Radioactive Effluent Release Report |
ML16243A489 | 1 September 2016 | Acceptance of Requested Licensing Action Inservice Inspection Interval Proposed Alternative (I5R-08) | |
ML17128A181 | 1 September 2016 | 2016 Dresden Nuclear Station Initial License Examination As-Administered JPMs | Squib Job Performance Measure |
ML17128A174 | 1 September 2016 | 2016 Dresden Nuclear Station Initial License Examination As-Administered Written Exam | Safe Shutdown Half scram Squib Fuel cladding Power change |
CAC:MF3877 | 31 August 2016 | ||
ML16244A368 | 31 August 2016 | NRR E-mail Capture - Exelon License Amendment Request to Transition Fuel Designs at Both Dresden and Quad Cities Nuclear Power Stations | |
IR 05000237/2016005 | 31 August 2016 | Mid-Cycle Assessment Letter for Dresden Nuclear Power Station, Units 2 and 3,(Report 05000237/2016005; 05000249/2016005) | Spent Fuel Pool Instrumentation |
RS-16-124, Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 31 August 2016 | Spent Fuel Pool Evaluation Supplemental Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | Safe Shutdown Earthquake Probabilistic Risk Assessment Fukushima Dai-Ichi |
ML16243A475 | 26 August 2016 | Part 21 Safety Related Component Welding by an Unqualified Welder | |
ML16242A071 | 26 August 2016 | Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information 05000237/2017007; 05000249/2017007 | Safe Shutdown Fire Barrier Fire impairment Severe Accident Management Guideline B.5.b Mitigating Strategies Fire Protection Program |
05000249/LER-2016-001 | 25 August 2016 | Alert Declared from Unit 3 HPCI Auxiliary Oil Pump Motor Fire LER 16-001-00 for Dresden Nuclear Power Station Regarding Alert Declared from Unit 3 HPCI Auxiliary Oil Pump Motor Fire | Ultimate heat sink |
RS-16-166, Supplemental Information Related to Inservice Inspection Interval Relief Request I5R-08 | 22 August 2016 | Supplemental Information Related to Inservice Inspection Interval Relief Request I5R-08 | |
ML16225A003 | 22 August 2016 | Status of NRC Operating Reactor Regulatory and Licensing Review Procedures | |
ML16235A085 | 18 August 2016 | NRR E-mail Capture - (CAC Nos. MF8090/MF8091) DNPS, Units 2 and 3 - Proposed Alternative for Inservice Inspection Interval (I5R-08) | |
ML16229A547 | 18 August 2016 | Supplemental Information Needed for Acceptance of Requested Licensing Action Inservice Inspection Interval Relief Request (15R-08) | |
CAC:MF1046 | 16 August 2016 | ||
RS-16-090, Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 16 August 2016 | Report of Full Compliance with March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | Safe Shutdown High winds Ultimate heat sink Tornado Missile Time to boil Safe Shutdown Earthquake Emergency Lighting FLEX Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Time Critical Operator Action Frazil ice Earthquake Hardened vent |
IR 05000237/2016009 | 4 August 2016 | NRC Pilot Design Bases Inspection (Programs) Inspection Report 05000237/2016009; 05000249/2016009, June 27, 2016 - July 1, 2016 | Post Accident Monitoring Probabilistic Risk Assessment Significance Determination Process |
ML16215A013 | 3 August 2016 | Transmittal of Draft Safety Evaluation for Proposed Amendment Revision to Technical Specifications to Support Transitioning to Areva Nuclear Fuel | |
RS-16-159, County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings | 28 July 2016 | County, and Quad Cities - Response to Request for Additional Information Regarding License Amendment to Address Secondary Containment Access Openings | Maintenance Rule Program |
ML16210A415 | 28 July 2016 | Letter Dresden Operator Licensing Examination Approval | |
ML16209A218 | 26 July 2016 | Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3, TS Lnservice Testing Program Removal & Clarify SR Usage Rule Application to Section 5.5 Testing. | Shutdown Margin Reactor Vessel Water Level Packing leak High Radiation Area Stroke time Hydrostatic Squib Incorporated by reference Missed surveillance Surveillance Frequency Control Program Excess Flow Check Valve Power Operated Valves Pressure Boundary Leakage Recently irradiated fuel Power change Unidentified leakage |
ML16208A028 | 25 July 2016 | Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000249/2016004 (LAS) | Nondestructive Examination Foreign Material Exclusion Scaffolding |
IR 05000237/2016002 | 25 July 2016 | NRC Integrated Inspection Report 05000237/2016002; 05000249/2016002; 07200037/2016001 | High winds Half scram Hydrostatic Temporary Modification Tornado-Generated Missile Significance Determination Process Job Performance Measure Surveillance Frequency Control Program Operability Determination Fire Protection Program Substantial potential for an overexposure Operability Assessment Overexposure |
RS-16-156, Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations | 18 July 2016 | Response to NRC Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
05000237/LER-2016-002 | 15 July 2016 | Unit 2 HPCI Inlet Steam Drain Pot Piping Leak Resulting in HPCI Inoperability LER 16-002-00 for Dresden Nuclear Power Station, Unit 2 Regarding HPCI Inlet Steam Drain Pot Piping Leak Resulting in HPCI Inoperability | Ultimate heat sink Through-Wall Leak |
ML16196A269 | 14 July 2016 | Summary of June 30, 2016, Public Meeting with Exelon Generation Company, LLC, to Discuss the 2015 End-of-Cycle Plant Performance Assessment of Dresden Nuclear Power Station, Units 2 and 3 | Open House |
ML16189A328 | 12 July 2016 | NRC Plan for the Audit of Exelon Generation'S Mitigation Strategies Assessment Submittals Relating to Order EA-12-049 for Braidwood Station, Dresden Nuclear Power Station, Peach Bottom Units 2 and 3, and Three Mile Island, Unit 1 | FLEX Fukushima Dai-Ichi |
ML16183A286 | 12 July 2016 | Second Request for Withholding Information from Public Disclosure for Dresden Nuclear Power Station, Units 2 and 3 and Quad Cities Nuclear Power Station, Units 1 and 2 - Regarding the Transition to Areva Fuel (MF5736, MF5737, MF5738, MF5739 | |
CAC:MF7921 | 12 July 2016 | ||
ML16190A385 | 8 July 2016 | EP-AA-1 12-100-F-50, Revision D, Shift Emergency Director Checklist (Cng), Emergency Implementing Procedure | Safe Shutdown Health Physics Network Ultimate heat sink FLEX Severe Accident Management Guideline Minimum staff |
ML16189A255 | 7 July 2016 | Annual Assessment Meeting/Open House (Hand Out) | Ultimate heat sink Spent Fuel Pool Instrumentation Containment Hardened Vent Open House |
ML16190A116 | 6 July 2016 | 2015 Regulatory Commitment Change Summary Report |