UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 August 22, 2016 All Operating Reactor Licensees (See Enclosed List)
SUBJECT:
STATUS OF THE U.S. NUCLEAR REGULATORY COMMISSION OPERATING REACTOR REGULATORY AND LICENSING REVIEW PROCESSES In our letter dated June 13, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML13151A377), the U.S. Nuclear Regulatory Commission (NRC) alerted the industry to possible licensing review scheduling impacts stemming from the redirecting of staff to support the implementation of recommendations identified as a result of the events at the Fukushima Dai-chi nuclear power plant. At that time, the NRC actively assessed and redefined priorities and ensured that actions taken in response to Fukushima lessons-learned did not displace ongoing work that had greater safety benefit, work that was necessary for continued safe operation, or other existing high-priority work. Additionally, the NRC placed increased emphasis on the need for routine communications with licensees in order to foster a common awareness of project schedule expectations, as it related to safety significance and operational needs.
Initially, the redirecting of staff to address Fukushima lessons-learned resulted in a significant increase in the volume of licensing reviews requiring greater than 1 year to complete (i.e., the backlog). However, through the normalizing of the Fukushima workload and implementation of staffing and process changes, the NRC has since made significant improvements in our timeliness of completing licensing reviews, including notably reducing the backlog. As such, you should generally expect NRC staff to complete routine licensing reviews within 1 year and more challenging licensing reviews within 2 years. As you may be aware, the NRC's congressionally reported timeliness metrics are to complete 95 percent of submitted licensing reviews within 1 year and 100 percent within 2 years, unless the reviews meet specific exclusion criteria (e.g., license renewals, improved standard technical specifications conversions, power uprates, and unusually complex actions).
In addition to the measures discussed above that contributed to our successful backlog reduction, the NRC also implemented items associated with Project AIM and increased communications with the industry regarding future planned licensing action submittals. Along with these efforts, NRC management has placed additional emphasis with the staff regarding several key aspects of licensing reviews (ADAMS Accession No. ML16202A029) for which you, the industry, also play a key role in supporting the efficiency and effectiveness of future licensing reviews:
Pre-Submittal Meetings for "Complex" Licensing Actions - You should expect NRC Project Managers (PMs) to encourage you to participate in a pre-submittal meeting with the NRC prior to the submittal of any complex licensing action. The term "complex," in this context, is generally defined as those licensing actions that are first-of-a-kind, especially voluminous, require a broad range of technical review expertise on the part of the NRC, will likely be subject to review by the Advisory Committee on Reactor Safeguards, etc. It is recommended that you make every effort to actively participate in such meetings, including being prepared to discuss anticipated technical, licensing, and/or scheduling challenges. Issues discussed will be captured and provided to you in the pre-submittal meeting minutes generated by the PM. Although no regulatory decisions are typically made during a pre-submittal meeting, you should make every effort to ensure the technical and/or licensing issues raised are fully resolved and discussed in the subsequent submittal. You should also expect that the staff will ensure such discussions are included in the submittal during the acceptance review process.
Acceptance Reviews - You should expect the staff to closely adhere to established policies and practices regarding the acceptance review process, as discussed in Office of Nuclear Reactor Regulation (NRR) Office Instruction LIC-109, Revision 1, "Acceptance Review Procedures," dated July 16, 2009 (ADAMS Accession No. ML091810088). This includes the staff's timely completion of such reviews as well as an expectation that your submittals are complete, accurate, and sufficient to support the initiation of the staff's review. The staff will adhere to LIC-109, Appendix B, "Guide for Performing Acceptance Reviews," and Appendix D, "Guide for Performing Acceptance Reviews: Information Insufficiency Examples," when determining the sufficiency of licensing action submittals. You should expect the staff to consider non-acceptance for those cases where the staff has concluded that a submittal is not sufficient to begin its detailed review and for which a supplement, submitted within 13 days, would be required. Beginning in Fiscal Year 2017, the timeliness metric for licensing actions is changing to begin at the time of acceptance of an application rather than the point of receipt of the initial application.
Requests for Additional Information (RAls) - While it is expected that you submit high quality and complete submittals, the NRC will use the RAI process to obtain any supplemental information needed to make a final safety finding. You should typically receive no more than one round of RAls. However, in some cases additional information may still be required. To help with review timeliness and efficiency, you should expect PMs to actively seek opportunities to conduct an on-site audit or a public meeting in lieu of generating multiple rounds of RAls. Your continued diligence with timely and complete responses to RAls, and support of alternatives to RAls, will go a long way in supporting the timely closure of issues and completion of licensing action reviews.
Should RAI responses be untimely or substantially change the scope of the initially planned review (e.g., significant change in analytical methods), the staff will consider whether to deny, in part or in its entirety, or re-prioritize the application as significant slipping of schedules adversely impacts already established workload management processes and the completion of other previously planned and prioritized licensing work.
Workload Status Forecasting and PM/Licensee Communications - As you are already aware, the NRC issued Regulatory Issue Summary (RIS) 2015-16, "Planned Licensing Action Submittal for All Power Reactor Licensees," dated January 15, 2016 (ADAMS Accession No. ML16013A156), requesting you to provide information regarding planned licensing submittals over the next 3 calendar years and information on planned power uprate applications over the next 5 calendar years. This information provides an excellent baseline for expected licensing submittals and will significantly aid the NRC with its near-term resource planning efforts. Moving forward, you should expect at least monthly communications with your PM regarding the status of those planned licensing submittals, any new licensing actions, and any significant longer-term licensing actions.
The NRC will continue to work with you to identify opportunities to make the licensing review process as predictable, efficient, and effective as possible, consistent with the agency's mission to protect public health and safety and the environment. Activities such as the issuance of RIS 2015-16 and continued participation in periodic NEI Regulatory Issues Task Force (RITF) meetings will help ensure continued successes with these important reviews and help both the NRC and industry better manage necessary licensing resources.
Enclosure:
List of Operating Reactor Licensees cc: Bruce Montgomery Senior Project Manager, Licensing Nuclear Energy Institute 1201 F Street, NW, Suite 1100 Washington, DC 20004 Listserv Sincerely,
LIST OF OPERATING REACTOR LICENSEES Arkansas Nuclear One, Units 1 and 2 Entergy Operations, Inc.
Docket Nos. 50-313 and 50-368 License Nos. DPR-51 and NPF-6 Vice President, Operations Arkansas Nuclear One Entergy Operations, Inc.
1448 S.R. 333 Russellville, AR 72802 Beaver Valley Power Station, Units 1 and 2 FirstEnergy Nuclear Operating Company Docket Nos. 50-334 and 50-412 License Nos. DPR-66 and NPF-73 Mr. Marty L. Richey Site Vice President FirstEnergy Nuclear Operating Company Beaver Valley Power Station Mail Stop A-BV-SEB1 P.O. Box 4, Route 168 Shippingport, PA 15077 Braidwood Station, Units 1 and 2 Exelon Generation Company, LLC Docket Nos. STN 50-456 and STN 50-457 License Nos. NPF-72 and NPF-77 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear Braidwood Station 4300 Winfield Road Warrenville, IL 60555 Browns Ferry Nuclear Plant, Units 1, 2, and 3 Tennessee Valley Authority Docket Nos. 50-259, 50-260, and 50-296 License Nos. DPR-33, DPR-52, and DPR-68 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority Browns Ferry Nuclear Plant 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801 Brunswick Steam Electric Plant, Units 1 and 2 Duke Energy Progress, Inc.
Docket Nos. 50-325 and 50-324 License Nos. DPR-71 and DPR-62 Mr. William R. Gideon Site Vice President Brunswick Steam Electric Plant 8470 River Rd., SE (M/C BNP001)
Southport, NC 28461 Byron Station, Units 1 and 2 Exelon Generation Company, LLC Docket Nos. STN 50-454 and STN 50-455 License Nos. NPF-37 and NPF-66 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear Byron Station 4300 Winfield Road Warrenville, IL 60555 Enclosure
Callaway Plant. Unit 1 Union Electric Company Docket No. 50-483 License No. NPF-30 Mr. Fadi Diya Senior Vice President and Chief Nuclear Officer Union Electric Company Callaway Plant P.O. Box 620 Fulton, MO 65251 Calvert Cliffs Nuclear Power Plant. Units 1 and 2 Calvert Cliffs Nuclear Power Plant, LLC Docket Nos. 50-317 and 50-318 License Nos. DPR-53 and DPR-69 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Generation Company, LLC Calvert Cliffs Nuclear Power Plant 4300 Winfield Road Warrenville, IL 60555 Catawba Nuclear Station. Units 1 and 2 Duke Energy Carolinas, LLC Docket Nos. 50-413 and 50-414 License Nos. NPF-35 and NPF-52 Mr. Kelvin Henderson Site Vice President Duke Energy Carolinas, LLC Catawba Nuclear Station 4800 Concord Road York, SC 29745 Clinton Power Station. Unit 1 Exelon Generation Company, LLC Docket No. 50-461 License No. NPF-62 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear Clinton Power Station 4300 Winfield Road Warrenville, IL 60555 Columbia Generating Station Energy Northwest Docket No. 50-397 License No. NPF-21 Mr. Mark E. Reddemann Chief Executive Officer Energy Northwest Columbia Generating Station MD 1023 North Power Plant Loop P.O. Box 968 Richland, WA 99352-0968 Comanche Peak Nuclear Power Plant, Units 1 and 2 Luminant Generation Company LLC Docket Nos. 50-445 and 50-446 License Nos. NPF-87 and NPF-89 Mr. Ken J. Peters Senior Vice President & Chief Nuclear Officer Attention: Regulatory Affairs Luminant Generation Company LLC Comanche Peak Nuclear Power Plant P.O. Box 1002 Glen Rose, TX 76043
Cooper Nuclear Station Nebraska Public Power District Docket No. 50-298 License No. DPR-46 Mr. Oscar A. Limpias Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue Brownville, NE 68321 Davis-Besse Nuclear Power Station, Unit 1 FirstEnergy Nuclear Operating Company Docket No. 50-346 License No. NPF-3 Mr. Brian D. Boles Site Vice President - Nuclear FirstEnergy Nuclear Operating Company Davis-Besse Nuclear Power Station 5501 N. State Route 2 Mail Stop A-DB-3080 Oak Harbor, OH 43449-9760 Diablo Canyon Power Plant, Units 1 and 2 Pacific Gas and Electric Company Docket Nos. 50-275 and 50-323 License Nos. DPR-80 and DPR-82 Mr. Edward D. Halpin Senior Vice President, Generation and Chief Nuclear Officer Pacific Gas and Electric Company Diablo Canyon Power Plant P.O. Box 56, Mail Code 104/6 Avila Beach, CA 93424 Donald C. Cook Nuclear Plant, Units 1 and 2 Indiana Michigan Power Company Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-7 4 Mr. Joel P. Gebbie Senior Vice President and Chief Nuclear Officer Indiana Michigan Power Company Nuclear Generation Group Donald C. Cook Nuclear Power Plant One Cook Place Bridgman, Ml 49106 Dresden Nuclear Power Station. Units 2 and 3 Exelon Generation Company, LLC Docket Nos. 50-237 and 50-249 License Nos. DPR-19 and DPR-25 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear Dresden Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555 Duane Arnold Energy Center NextEra Energy Duane Arnold, LLC Docket No. 50-331 License No. DPR-49 Mr. Thomas A. Vehec Vice President NextEra Energy Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
Edwin I. Hatch Nuclear Plant. Units 1 and 2 Southern Nuclear Operating Company, Inc.
Docket Nos. 50-321 and 50-366 License Nos. DPR-57 and NPF-5 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
Edwin I. Hatch Nuclear Plant P.O. Box 1295 I Bin 038 Birmingham, AL 35201-1295 Fermi. Unit 2 DTE Electric Company Docket No. 50-341 License No. NPF-43 Mr. Paul Fessler, Senior Vice President and Chief Nuclear Officer DTE Electric Company Fermi 2 - 210 NOC 6400 North Dixie Highway Newport, Ml 48166 Fort Calhoun Station. Unit 1 Omaha Public Power District Docket No. 50-285 License No. DPR-40 Mr. Shane M. Marik Site Vice President and Chief Nuclear Officer Omaha Public Power District Fort Calhoun Station 9610 Power Lane, Mail Stop FC-2-4 Blair, NE 68008 Grand Gulf Nuclear Station. Unit 1 Entergy Operations, Inc.
Docket No. 50-416 License No. NPF-29 Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 H. B. Robinson Steam Electric Plant, Unit 2 Duke Energy Progress, Inc.
Docket No. 50-261 License No. DPR-23 Mr. Richard Michael Glover Site Vice President H. B. Robinson Steam Electric Plant Duke Energy Progress, Inc.
3581 West Entrance Road, RNPA01 Hartsville, SC 29550 Hope Creek Generating Station PSEG Nuclear, LLC Docket No. 50-354 License No. NPF-57 Mr. Peter P. Sena, Ill President PSEG Nuclear LLC - N09 Hope Creek Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Indian Point Nuclear Generating Units 1. 2.
and 3 Entergy Nuclear Operations, Inc.
Docket Nos. 50-247 and 50-286 License Nos. DPR-26 and DPR-64 Vice President, Operations Entergy Nuclear Operations, Inc.
Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 James A. FitzPatrick Nuclear Power Plant Entergy Nuclear Operations, Inc.
Docket No. 50-333 License No. DPR-59 Vice President, Operations Entergy Nuclear Operations, Inc.
James A. FitzPatrick Nuclear Power Plant P.O. Box 110 Lycoming, NY 13093
Joseph M. Farley Nuclear Plant. Units 1 and 2 Southern Nuclear Operating Company, Inc.
Docket Nos. 50-348 and 50-364 License Nos. NPF-2 and NPF-8 Mr. C. R. Pierce Regulatory Affairs Director Southern Nuclear Operating Company, Inc.
Joseph M. Farley Nuclear Plant P.O. Box 1295 I Bin 038 Birmingham, AL 35242 LaSalle County Station, Units 1 and 2 Exelon Generation Company, LLC Docket Nos. 50-373 and 50-37 4 License Nos. NPF-11 and NPF-18 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer (CNO)
Exelon Nuclear LaSalle County Station 4300 Winfield Road Warrenville, IL 60555 Limerick Generating Station. Units 1 and 2 Exelon Generation Company, LLC Docket Nos. 50-352 and 50-353 License Nos. NPF-39 and NPF-85 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Limerick Generating Station 4300 Winfield Road Warrenville, IL 60555 McGuire Nuclear Station, Units 1 and 2 Duke Energy Carolinas, LLC Docket Nos. 50-369 and 50-370 License Nos. NPF-9 and NPF-17 Mr. Steven D. Capps, Vice President Duke Energy Carolinas, LLC McGuire Nuclear Station 12700 Hagers Ferry Road Huntersville, NC 28078-8985 Millstone Power Station. Units 2 and 3 Dominion Nuclear Connecticut, Inc.
Docket Nos. 50-336 and 50-423 License Nos. DPR-65 and NPF-49 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Connecticut, Inc.
Millstone Power Station Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 Monticello Nuclear Generating Plant Northern States Power Company Docket No. 50-263 License No. DPR-22 Mr. Peter A. Gardner Senior Vice President and Chief Nuclear Officer Northern States Power Company - Minnesota Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362-9637 Nine Mile Point Nuclear Station. Units 1 and 2 Nine Mile Point Nuclear Station, LLC Exelon Generation Company, LLC Docket Nos. 50-220 and 50-410 License Nos. DPR-63 and NPF-69 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Generation Company, LLC Nine Mile Point Nuclear Station 4300 Winfield Road Warrenville, IL 60555
North Anna Power Station, Units 1 and 2 Virginia Electric and Power Company Docket Nos. 50-338 and 50-339 License Nos. NPF-4 and NPF-7 Mr. David A. Heacock, President and Chief Nuclear Officer Virginia Electric and Power Company North Anna Power Station Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 Oconee Nuclear Station. Units 1, 2, and 3 Duke Energy Carolinas, LLC Docket Nos. 50-269, 50-270, and 50-287 License Nos. DPR-38, DPR-47, and DPR-55 Mr. Scott Batson, Vice President Oconee Nuclear Station Duke Energy Corporation 7800 Rochester Highway Seneca, SC 29672-0752 Oyster Creek Nuclear Generating Station Exelon Generation Company, LLC Docket No. 50-219 License No. DPR-16 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Generation Company, LLC Oyster Creek Nuclear Generating Station 4300 Winfield Road Warrenville, IL 60555 Palisades Nuclear Plant Entergy Nuclear Operations, Inc.
Docket No. 50-255 License No. DPR-20 Vice President, Operations Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, Ml 49043-9530 Palo Verde Nuclear Generating Station.
Units 1. 2. and 3 Arizona Public Service Company Docket Nos. STN 50-528, STN 50-529, and STN 50-530 License Nos. NPF-41, NPF-51, and NPF-74 Mr. Randall K. Edington Executive Vice President Nuclear/CNO Arizona Public Service Company Palo Verde Nuclear Generating Station P.O. Box 52034 Mail Station 7602 Phoenix, AZ 85072-2034 Peach Bottom Atomic Power Station. Units 2 and 3 Exelon Generation Company, LLC Docket Nos. 50-277 and 50-278 License Nos. DPR-44 and DPR-56 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Nuclear Peach Bottom Atomic Power Station 4300 Winfield Road Warrenville, IL 60555 Perry Nuclear Power Plant. Unit 1 FirstEnergy Nuclear Operating Company Docket No. 50-440 License No. NPF-58 Mr. David B. Hamilton Site Vice President FirstEnergy Nuclear Operating Company Perry Nuclear Power Plant Mail Stop A-PY-A290 P.O. Box 97, 10 Center Road Perry, OH 44081-0097
Pilgrim Nuclear Power Station Entergy Nuclear Operations, Inc.
Docket No. 50-293 License No. DPR-35 Mr. John Dent, Jr.
Vice President Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360-5508 Point Beach Nuclear Plant. Units 1 and 2 NextEra Energy Point Beach, LLC Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Mr. Robert Coffey Site Vice President NextEra Energy Point Beach, LLC 661 0 Nuclear Road Two Rivers, WI 54241-9516 Prairie Island Nuclear Generating Plant.
Units 1 and 2 Northern States Power Company - Minnesota Docket Nos. 50-282 and 50-306 License Nos. DPR-42 and DPR-60 Mr. Scott D. Northard Acting Vice President Northern States Power Company - Minnesota Prairie Island Nuclear Generating Plant 1717 Wakonade Drive East Welch, MN 55089-9642 Quad Cities Nuclear Power Station, Units 1 and 2 Exelon Generation Company, LLC Docket Nos. 50-254 and 50-265 License Nos. DPR-29 and DPR-30 Mr. Bryan C. Hanson Senior Vice President Exelon Generation Company, LLC President and Chief Nuclear Officer Exelon Nuclear Quad Cities Nuclear Power Station 4300 Winfield Road Warrenville, IL 60555 R. E. Ginna Nuclear Power Plant R. E. Ginna Nuclear Power Plant, LLC Exelon Generation Company, LLC Docket No. 50-244 License No. DPR-18 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Generation Company, LLC R. E. Ginna Nuclear Power Plant 4300 Winfield Road Warrenville, IL 60555 River Bend Station. Unit 1 Entergy Operations, Inc.
Docket No. 50-458 License No. NPF-47 Vice President, Operations Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61N St. Francisville, LA 70775
Salem Nuclear Generating Station, Units 1 and 2 PSEG Nuclear, LLC Docket Nos. 50-272 and 50-311 License Nos. DPR-70 and DPR-75 Mr. Peter P. Sena, Ill President PSEG Nuclear LLC - N09 Salem Nuclear Generating Station P.O. Box 236 Hancocks Bridge, NJ 08038 Seabrook Station. Unit 1 NextEra Energy Seabrook, LLC Docket No 50-443 License No. NFP-86 Mr. Eric McCartney Site Vice President NextEra Energy Seabrook Station 626 Lafayette Rd.
Seabrook, NH 03784 Sequoyah Nuclear Plant. Units 1 and 2 Tennessee Valley Authority Docket Nos. 50-327 and 50-328 License Nos. DPR-77 and DPR-79 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority Sequoyah Nuclear Plant 1101 Market Street, LP 3R-C Chattanooga, TN 37 402-2801 Shearon Harris Nuclear Power Plant, Unit 1 Duke Energy Progress, Inc.
Docket No. 50-400 License No. NPF-63 Mr. Benjamin C. Waldrep Site Vice President Duke Energy Progress, Inc.
Shearon Harris Nuclear Power Plant 5413 Shearon Harris Rd.
M/C HNP01 New Hill, NC 27562-0165 South Texas Project. Units 1 and 2 STP Nuclear Operating Company Docket Nos. 50-498 and 50-499 License Nos. NPF-76 and NPF-80 Mr. G. T. Powell Executive Vice President and CNO STP Nuclear Operating Company South Texas Project P.O. Box 289 Wadsworth, TX 77483 St. Lucie Plant. Units 1 and 2 Florida Power and Light Company Docket Nos. 50-335 and 50-389 License Nos. DPR-67 and NPF-16 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy St. Lucie Plant P.O. Box 14000 Juno Beach, FL 33408-0420
Surry Power Station. Units 1 and 2 Virginia Electric and Power Company Docket Nos. 50-280 and 50-281 License Nos. DPR-32 and DPR-37 Mr. David A. Heacock President and Chief Nuclear Officer Dominion Nuclear Virginia Electric and Power Company Surry Power Station Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060-6711 Susquehanna Steam Electric Station. Units 1 and 2 Susquehanna Nuclear, LLC Docket Nos. 50-387 and 50-388 License Nos. NPF-14 and NPF-22 Mr. Jon A. Franke Site Vice President Susquehanna Nuclear, LLC 769 Salem Boulevard NUCSB3 Berwick, PA 18603-0467 Three Mile Island Nuclear Station. Unit 1 Exelon Generation Company, LLC Docket No. 50-289 License No. DPR-50 Mr. Bryan C. Hanson President and Chief Nuclear Officer Exelon Generation Company, LLC Three Mile Island Nuclear Station 4300 Winfield Road Warrenville, IL 60555 Turkey Point Nuclear Generating Units 3 and 4 Florida Power and Light Company Docket Nos. 50-250 and 50-251 License Nos. DPR-31 and DPR-41 Mr. Mano Nazar President and Chief Nuclear Officer Nuclear Division NextEra Energy Turkey Point Nuclear Generating P.O. Box 14000 Juno Beach, FL 33408-0420 Virgil C. Summer Nuclear Station. Unit 1 South Carolina Electric & Gas Company Docket No. 50-395 License No. NPF-12 Mr. George Lippard, Ill Vice President, Nuclear Operations South Carolina Electric & Gas Company Virgil C. Summer Nuclear Station P.O. Box 88, Mail Code 800 Jenkinsville, SC 29065 Vogtle Electric Generating Plant. Units 1 and 2 Southern Nuclear Operating Company, Inc.
Docket Nos. 50-424 and 50-425 License Nos. NPF-68 and NPF-81 Mr. C. R. Pierce Regulatory Affairs Director Vogtle Electric Generating Plant Southern Nuclear Operating Company, Inc.
P.O. Box 1295 I Bin 038 Birmingham, AL 35201-1295 Waterford Steam Electric Station. Unit 3 Entergy Operations, Inc.
Docket No. 50-382 License No. NPF-38 Site Vice President Entergy Operations, Inc.
Waterford Steam Electric Station 17265 River Road Killona, LA 70057-3093
Watts Bar Nuclear Plant. Units 1 and 2 Tennessee Valley Authority Docket No. 50-390 and 50-391 License No. NPF-90 and NPF-96 Mr. Joseph W. Shea Vice President, Nuclear Licensing Tennessee Valley Authority Watts Bar Nuclear Plant 1101 Market Street, LP 3R-C Chattanooga, TN 37402-2801 Wolf Creek Generating Station Wolf Creek Nuclear Operating Corporation Docket No. 50-482 License No. NPF-42 Mr. Adam C. Heflin President, Chief Executive Officer, and Chief Nuclear Officer Wolf Creek Nuclear Operating Corporation Wolf Creek Generating Station P.O. Box 411 Burlington, KS 66839
ML16225A003 Sincerely, IRA/
Anne T. Boland, Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation OFFICE NRR/DORL/D NRR/DORL/LPL4-1/LA NRR/D NRR/DORL/D NAME ABoland JBurkhardt WDean ABoland DATE 8/22/2016 8/16/16 8/19/16 8/22/2016
Letter to All Operating Reactor Licensees on the Enclosed List from Anne T. Boland dated August 22, 2016.
SUBJECT:
STATUS OF THE U.S. NUCLEAR REGULATORY COMMISSION OPERATING REACTOR REGULATORY AND LICENSING REVIEW PROCESSES DISTRIBUTION:
PUBLIC RidsNrrDorl Resource RidsNrrOd Resource RidsNrrDorlLpl 1-1 Resource RidsNrrDorlLpl1-2 Resource RidsNrrDorlLpl2-1 Resource RidsNrrDorlLpl2-2 Resource RidsNrrDorlLpl3-1 Resource RidsNrrDorlLpl3-2 Resource RidsNrrDorlLpl4-1 Resource RidsNrrDorlLpl4-2 Resource RidsNrrPMANO Resource RidsNrrPMBeaverValley Resource RidsNrrPMBraidwood Resource RidsNrrPMBrownsFerry Resource RidsNrrPMBrunswick Resource RidsNrrPMByron Resource RidsNrrPMCallaway Resource RidsNrrPMCalvertCliffs Resource RidsNrrPMCatawba Resource RidsNrrPMClinton Resource RidsNrrPMColumbia Resource RidsNrrPMComanchePeak Resource RidsNrrPMCooper Resource RidsNrrPMDavisBesse Resource RidsNrrPMDCCook Resource RidsNrrPMDiabloCanyon Resource RidsNrrPMDresden Resource RidsNrrPMDuaneArnold Resource RidsNrrPMFarley Resource RidsNrrPMFermi2 Resource RidsNrrPMFitzPatrick Resource RidsNrrPMFortCalhoun Resource RidsNrrPMGrandGulf Resource RidsNrrPMHatch Resource RidsNrrPMHopeCreek Resource RidsNrrPMlndianPoint Resource RidsNrrPMLaSalle Resource RidsNrrPMLimerick Resource RidsNrrPMMcGuire Resource RidsNrrPMMillstone Resource RidsNrrPMMonticello Resource RidsNrrPMNineMilePoint Resource RidsNrrPMNorthAnna Resource RidsNrrPMOconee Resource RidsNrrPMOysterCreek Resource RidsNrrPMPalisades Resource RidsNrrPMPaloVerde Resource RidsNrrPMPeachBottom Resource RidsNrrPMPerry Resource RidsNrrPMPilgrim Resource RidsNrrPMPointBeach Resource RidsNrrPMPrairielsland Resource RidsN rrPMQuadCities Resource RidsNrrPMREGinna Resource RidsNrrPMRiverBend Resource RidsNrrPMRobinson Resource RidsNrrPMSalem Resource RidsNrrPMSeabrook Resource RidsNrrPMSequoyah Resource RidsNrrPMShearonHarris Resource RidsN rrPMSouth Texas Resource RidsNrrPMStLucie Resource RidsNrrPMSummer Resource RidsNrrPMSurry Resource RidsNrrPMSusquehanna Resource RidsNrrPMThreeMilelsland Resource RidsNrrPMTurkeyPoint Resource RidsNrrPMVogtle Resource RidsNrrPMWaterford Resource RidsNrrPMWattsBar Resource RidsNrrPMWolfCreek Resource RidsNrrLABClayton Resource RidsNrrLAJBurkhardt Resource RidsNrrLAKGoldstein Resource RidsNrrLALRonewicz Resource RidsNrrLAPBlechman Resource RidsNrrLASRohrer Resource RidsRgn1 MailCenter Resource RidsRgn2MailCenter Resource RidsRgn3MailCenter Resource RidsRgn4MailCenter Resource