Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22339A001 | 22 December 2022 | Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan | |
ML22354A161 | 20 December 2022 | NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505 | Internal Flooding Probabilistic Risk Assessment Maintenance Rule Program |
L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 9 December 2022 | Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | |
IR 05000266/2022401 | 8 December 2022 | Security Baseline Inspection Report 05000266/2022401 and 05000301/2022401 | Safeguards Contingency Plan |
IR 05000266/2022404 | 2 December 2022 | Cyber Security Inspection Report 05000266/2022404 and 05000301/2022404 | Cyber Security Affidavit |
L-2022-177, Subsequent License Renewal Application - Second Annual Update | 28 November 2022 | Subsequent License Renewal Application - Second Annual Update | |
ML22311A558 | 22 November 2022 | Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep | |
L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | 9 November 2022 | CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums | |
IR 05000266/2022003 | 7 November 2022 | Integrated Inspection Report 05000266/2022003 and 05000301/2022003 | Grab sample Offsite Dose Calculation Manual Internal Flooding Functionality Assessment Operability Determination Through-Wall Leak Through Wall Leak Fire Protection Program Substantial potential for an overexposure Overexposure |
ML22298A297 | 27 October 2022 | Review of the Fall 2021 Steam Generator Tube Inspections Report | |
L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | 26 October 2022 | and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report | |
ML22291A369 | 18 October 2022 | NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Use Beacon Power Distribution Monitoring System | |
L-2022-161, U1R40 Steam Generator Tube Inspection Report | 13 October 2022 | U1R40 Steam Generator Tube Inspection Report | Aging Management |
L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report | 4 October 2022 | 10 CFR 50.59 Evaluation and Commitment Change Summary Report | Shutdown Margin |
L-2022-164, Technical Specification Bases and Technical Requirements Manual Change Summary | 4 October 2022 | Technical Specification Bases and Technical Requirements Manual Change Summary | Surveillance Frequency Control Program |
L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | 4 October 2022 | Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 | |
ML22264A305 | 30 September 2022 | Regulatory Audit in Support of Review of License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue-191 | Probabilistic Risk Assessment Exemption Request |
NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan | 30 September 2022 | Sixth 10-Year Interval Inservice Testing (1ST) Program Plan | Safe Shutdown Boric Acid Shutdown Margin Stroke time Hydrostatic Incorporated by reference Aging Management Missed surveillance Large early release frequency Cold shutdown justification Fire Protection Program |
IR 05000266/2022012 | 29 September 2022 | Biennial Problem Identification and Resolution Inspection Report 05000266/2022012 and 05000301/2022012 | Boric Acid Aging Management License Renewal Liquid penetrant Through Wall Leak Preliminary White Finding Operability Assessment |
NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System | 26 September 2022 | License Amendment Request 295, Beacon Power Distribution Monitoring System | Shutdown Margin Probabilistic Risk Assessment Surveillance Frequency Control Program |
ML22266A087 | 23 September 2022 | Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information | Job Performance Measure |
L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication | 16 September 2022 | Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication | Commercial Grade Dedication |
ML22144A002 | 14 September 2022 | Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency Plan | Health Physics Network FLEX Severe Accident Management Guideline |
L-2022-150, 10 CFR 50 Appendix E Evacuation Time Estimate Study for Point Beach Nuclear Plant | 13 September 2022 | 10 CFR 50 Appendix E Evacuation Time Estimate Study for Point Beach Nuclear Plant | Pandemic Coronavirus |
ML22256A318 | 13 September 2022 | Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection Report 05000266/2023010 05000301/2023010 | Stroke time Temporary Modification Aging Management Job Performance Measure Large early release frequency Coronavirus |
ML22193A114 | 12 September 2022 | Issuance of Amendment Nos. 270 and 272 Elimination of the Requirements to Maintain the Post-Accident Sampling System | Grab sample Fuel cladding |
ML22249A005 | 2 September 2022 | NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment and Exemptions Regarding Risk-Informed Approach to Address GSI-191 | Exemption Request |
IR 05000266/2022005 | 26 August 2022 | Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022005 and 05000301/2022005) | Commercial Grade Dedication Exemption Request Coronavirus |
ML22229A105 | 17 August 2022 | Response to Questions Regarding Point Beach Nuclear Power Plant with Attachment | Safe Shutdown Open House |
ML22216A203 | 11 August 2022 | Regulatory Audit in Support of Review of the Application to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4B | High winds Tornado Missile Internal Flooding Probabilistic Risk Assessment FLEX Tornado Missile Protection Open Phase Condition Large early release frequency |
IR 05000266/2022011 | 3 August 2022 | Triennial Fire Protection Inspection Report 05000266/2022011 and 05000301/2022011 | Safe Shutdown Fire Barrier Significance Determination Process Fire Protection Program |
L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 | 29 July 2022 | Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 | Safe Shutdown Boric Acid High winds Reactor Vessel Water Level Mission time Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Coatings Operating Basis Earthquake FLEX Foreign Material Exclusion Large early release frequency Severe Accident Management Guideline Exemption Request Earthquake Maintenance Rule Program Turbine Missile Fuel cladding Scaffolding |
IR 05000266/2022002 | 27 July 2022 | Integrated Inspection Report 05000266/2022002 and 05000301/2022002 | Boric Acid High Radiation Area Internal Flooding Enforcement Discretion Nondestructive Examination Temporary Modification Functionality Assessment Locked High Radiation Area FLEX Significance Determination Process Operability Determination Liquid penetrant Fire Protection Program Scaffolding Substantial potential for an overexposure Overexposure |
L-2022-124, Refueling Outage U1R40 Owner'S Activity Report (OAR-1) for Inservice Inspections | 20 July 2022 | Refueling Outage U1R40 Owner'S Activity Report (OAR-1) for Inservice Inspections | |
ML22200A028 | 19 July 2022 | Confirmation of Initial License License Examination | |
ML22229A102 | 18 July 2022 | Original Request - Questions Regarding Point Beach Nuclear Power Plant | |
ML22196A006 | 15 July 2022 | NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4b | |
ML22194A930 | 14 July 2022 | Project Manager Reassignment | |
NRC 2022-0019, Report of Changes to Emergency Plan | 13 July 2022 | Report of Changes to Emergency Plan | |
NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, | 11 July 2022 | Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, | Safe Shutdown High winds Ultimate heat sink Hydrostatic Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Large early release frequency Turbine Missile |
ML22181B084 | 30 June 2022 | 2021 Point Beach Nuclear Plant End-of-Cycle Meeting Handout | COVID-19 |
ML22181B118 | 30 June 2022 | Summary of the June 23, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 | Open House |
ML22172A119 | 27 June 2022 | Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-505 Provide Risk Informed Extended Complete Times - RITSTF Initiative 4B | Probabilistic Risk Assessment Large early release frequency |
ML22175A200 | 27 June 2022 | Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information: Inspection Report 05000266/2022004: 05000301/2022004 | Ultimate heat sink Temporary Modification Flow Induced Vibration |
ML22173A017 | 22 June 2022 | Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Point Beach Nuclear Plant | Temporary Modification Aging Management Maintenance Rule Program |
ML22172A213 | 22 June 2022 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection | Probabilistic Risk Assessment Cyber Security |
ML22199A063 | 16 June 2022 | News Release-III-22-017: NRC to Conduct Open House to Discuss 2021 Performance of Point Beach Nuclear Power Plant | Open House |
ML22160A660 | 10 June 2022 | Information Meeting with a Question and Answer Session to Discuss NRC 2021 End of Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2 | |
ML22159A325 | 9 June 2022 | 2021 Point Beach End of Cycle Public Meeting Notice | Open House |
ML22151A069 | 26 May 2022 | NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 28 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11 |