Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22339A00122 December 2022Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan
ML22354A16120 December 2022NRR E-mail Capture - Point Beach 1 & 2 - Final RAI - License Amendment Request Regarding TSTS-505Internal Flooding
Probabilistic Risk Assessment
Maintenance Rule Program
L-2022-185, Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 29 December 2022Turkey Points, Units 3 & 4; Seabrook Station; and Point Beach, Units 1 and 2 - Supplement to License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2
IR 05000266/20224018 December 2022Security Baseline Inspection Report 05000266/2022401 and 05000301/2022401Safeguards Contingency Plan
IR 05000266/20224042 December 2022Cyber Security Inspection Report 05000266/2022404 and 05000301/2022404Cyber Security
Affidavit
L-2022-177, Subsequent License Renewal Application - Second Annual Update28 November 2022Subsequent License Renewal Application - Second Annual Update
ML22311A55822 November 2022Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Cep
L-2022-180, CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums9 November 2022CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums
IR 05000266/20220037 November 2022Integrated Inspection Report 05000266/2022003 and 05000301/2022003Grab sample
Offsite Dose Calculation Manual
Internal Flooding
Functionality Assessment
Operability Determination
Through-Wall Leak
Through Wall Leak
Fire Protection Program
Substantial potential for an overexposure
Overexposure
ML22298A29727 October 2022Review of the Fall 2021 Steam Generator Tube Inspections Report
L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report26 October 2022and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report
ML22291A36918 October 2022NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment Request to Use Beacon Power Distribution Monitoring System
L-2022-161, U1R40 Steam Generator Tube Inspection Report13 October 2022U1R40 Steam Generator Tube Inspection ReportAging Management
L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report4 October 202210 CFR 50.59 Evaluation and Commitment Change Summary ReportShutdown Margin
L-2022-164, Technical Specification Bases and Technical Requirements Manual Change Summary4 October 2022Technical Specification Bases and Technical Requirements Manual Change SummarySurveillance Frequency Control Program
L-2022-160, Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 24 October 2022Station,, Point Beach Units 1 and 2, License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2
ML22264A30530 September 2022Regulatory Audit in Support of Review of License Amendment Request Regarding Risk-Informed Approach for Closure of Generic Safety Issue-191Probabilistic Risk Assessment
Exemption Request
NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan30 September 2022Sixth 10-Year Interval Inservice Testing (1ST) Program PlanSafe Shutdown
Boric Acid
Shutdown Margin
Stroke time
Hydrostatic
Incorporated by reference
Aging Management
Missed surveillance
Large early release frequency
Cold shutdown justification
Fire Protection Program
IR 05000266/202201229 September 2022Biennial Problem Identification and Resolution Inspection Report 05000266/2022012 and 05000301/2022012Boric Acid
Aging Management
License Renewal
Liquid penetrant
Through Wall Leak
Preliminary White Finding
Operability Assessment
NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System26 September 2022License Amendment Request 295, Beacon Power Distribution Monitoring SystemShutdown Margin
Probabilistic Risk Assessment
Surveillance Frequency Control Program
ML22266A08723 September 2022Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for InformationJob Performance Measure
L-2022-148, Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade Dedication16 September 2022Florida Power & Light Company, Comments on NRC Inspection Procedure (IP) 71111.21 N.03, Commercial Grade DedicationCommercial Grade Dedication
ML22144A00214 September 2022Summary of February 16, and May 18, 2022, Meetings with Nextera Energy/Florida Power & Light Company Regarding Planned Submittal of License Amendment Request for a Common Fleet Emergency PlanHealth Physics Network
FLEX
Severe Accident Management Guideline
L-2022-150, 10 CFR 50 Appendix E Evacuation Time Estimate Study for Point Beach Nuclear Plant13 September 202210 CFR 50 Appendix E Evacuation Time Estimate Study for Point Beach Nuclear PlantPandemic
Coronavirus
ML22256A31813 September 2022Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection Report 05000266/2023010 05000301/2023010Stroke time
Temporary Modification
Aging Management
Job Performance Measure
Large early release frequency
Coronavirus
ML22193A11412 September 2022Issuance of Amendment Nos. 270 and 272 Elimination of the Requirements to Maintain the Post-Accident Sampling SystemGrab sample
Fuel cladding
ML22249A0052 September 2022NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of License Amendment and Exemptions Regarding Risk-Informed Approach to Address GSI-191Exemption Request
IR 05000266/202200526 August 2022Updated Inspection Plan for Point Beach Nuclear Plant, Units 1 and 2 (Report 05000266/2022005 and 05000301/2022005)Commercial Grade Dedication
Exemption Request
Coronavirus
ML22229A10517 August 2022Response to Questions Regarding Point Beach Nuclear Power Plant with AttachmentSafe Shutdown
Open House
ML22216A20311 August 2022Regulatory Audit in Support of Review of the Application to Adopt Risk-Informed Extended Completion Times - RITSTF Initiative 4BHigh winds
Tornado Missile
Internal Flooding
Probabilistic Risk Assessment
FLEX
Tornado Missile Protection
Open Phase Condition
Large early release frequency
IR 05000266/20220113 August 2022Triennial Fire Protection Inspection Report 05000266/2022011 and 05000301/2022011Safe Shutdown
Fire Barrier
Significance Determination Process
Fire Protection Program
L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-0229 July 2022Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02Safe Shutdown
Boric Acid
High winds
Reactor Vessel Water Level
Mission time
Safe Shutdown Earthquake
Internal Flooding
Hydrostatic
Probabilistic Risk Assessment
Coatings
Operating Basis Earthquake
FLEX
Foreign Material Exclusion
Large early release frequency
Severe Accident Management Guideline
Exemption Request
Earthquake
Maintenance Rule Program
Turbine Missile
Fuel cladding
Scaffolding
IR 05000266/202200227 July 2022Integrated Inspection Report 05000266/2022002 and 05000301/2022002Boric Acid
High Radiation Area
Internal Flooding
Enforcement Discretion
Nondestructive Examination
Temporary Modification
Functionality Assessment
Locked High Radiation Area
FLEX
Significance Determination Process
Operability Determination
Liquid penetrant
Fire Protection Program
Scaffolding
Substantial potential for an overexposure
Overexposure
L-2022-124, Refueling Outage U1R40 Owner'S Activity Report (OAR-1) for Inservice Inspections20 July 2022Refueling Outage U1R40 Owner'S Activity Report (OAR-1) for Inservice Inspections
ML22200A02819 July 2022Confirmation of Initial License License Examination
ML22229A10218 July 2022Original Request - Questions Regarding Point Beach Nuclear Power Plant
ML22196A00615 July 2022NRR E-mail Capture - Point Beach Nuclear Plant, Units 1 and 2 - Acceptance of Requested Licensing Action TSTF-505, Revision 2, Provide Risk Informed Extended Completion Times - RITSTF Initiative 4b
ML22194A93014 July 2022Project Manager Reassignment
NRC 2022-0019, Report of Changes to Emergency Plan13 July 2022Report of Changes to Emergency Plan
NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,11 July 2022Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,Safe Shutdown
High winds
Ultimate heat sink
Hydrostatic
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Large early release frequency
Turbine Missile
ML22181B08430 June 20222021 Point Beach Nuclear Plant End-of-Cycle Meeting HandoutCOVID-19
ML22181B11830 June 2022Summary of the June 23, 2022, Public Outreach to Discuss the NRC 2021 End-of-Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2Open House
ML22172A11927 June 2022Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request to Adopt TSTF-505 Provide Risk Informed Extended Complete Times - RITSTF Initiative 4BProbabilistic Risk Assessment
Large early release frequency
ML22175A20027 June 2022Request for Information for an NRC Triennial Heat Exchanger/Sink Performance Inspection and Request for Information: Inspection Report 05000266/2022004: 05000301/2022004Ultimate heat sink
Temporary Modification
Flow Induced Vibration
ML22173A01722 June 2022Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Point Beach Nuclear PlantTemporary Modification
Aging Management
Maintenance Rule Program
ML22172A21322 June 2022Information Request for the Cyber-Security Baseline Inspection, Notification to Perform InspectionProbabilistic Risk Assessment
Cyber Security
ML22199A06316 June 2022News Release-III-22-017: NRC to Conduct Open House to Discuss 2021 Performance of Point Beach Nuclear Power PlantOpen House
ML22160A66010 June 2022Information Meeting with a Question and Answer Session to Discuss NRC 2021 End of Cycle Plant Performance Assessment of Point Beach Nuclear Plant, Units 1 and 2
ML22159A3259 June 20222021 Point Beach End of Cycle Public Meeting NoticeOpen House
ML22151A06926 May 2022NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 28 Annual Submittal and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11