U.S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, DC 20555-0001 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 NEXTera ENERGY~
POINT BEACH L-2022-164 TS5.5.13 10 CFR 50.71(e)
Technical Specification Bases and Technical Requirements Manual Change Summary In accordance with the requirements of Technical Specification (TS) 5.5.13 and 10 CFR 50. 71 (e),
NextEra Energy Point Beach, LLC is submitting a summary of changes made to the Point Beach Nuclear Plant TS Bases (TSB) and Plant Technical Requirements Manual (TRM) that did not require prior NRC approval.
The enclosure contains the TSB and TRM change summary for the Point Beach Nuclear Plant, Units 1 and 2, for the period of March 1, 2021 through October 1, 2022.
This letter contains no new commitments and no revisions to existing commitments.
If you have any questions or require additional information, please contact Mr. Kenneth Mack, Licensing Manager, at 561-904-3635.
Sincerely, Dianne Strand General Manager Regulatory Affairs NextEra Energy Enclosure cc:
Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC NextEra Energy Point Beach, LLC 6610 Nuclear Road, Two Rivers, WI 54241
Affected Section TSB 3.7.7 TSB 3.3.2 TSB 3.2.1 TSB 3.6.3 TSB 3.1.7 TSB 3.4.7 ENCLOSURE NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 TECHNICAL SPECIFICATION BASES (TSB) CHANGE
SUMMARY
FOR March 1, 2021 - October 1, 2022 Date of Affected Change Page(s)
Summary Revised to clarify that the component cooling water 04/21/2021 4
pumps only need to be FUNCTIONAL to support the Residual Heat Removal when not in the required mode of applicability.
TS SR 3.3.2.2 was changed from 31 days on a staggered bases to 92 days (quarterly) under the Surveillance Frequency Control Program. TS B 3.3.2 SR 3.3.2.2 was revised to state, "on a frequency and bases established by the Surveillance Frequency Control Program" to align with the TS.
09/28/2021 20-22 & 33 Revised to state the Nominal Trip Setpoints (NTSP) reflect only steady state environmental instrument uncertainties, as this function is credited only for an SLB outside the containment so the RTDs associated with Tavg are only looking at steady state conditions and not required to be EQ for adverse containment..
Changes to all sections to align with the NRC approved changes to TS 3.2.1 to resolve non-conservative surveillance requirements associated 10/16/2021 All pages with the nuclear transient heat flux hot channel factor, as report in Westinghouse Nuclear Safety Advisory Letter 15-1, Heat Flux Hot Channel Factor TS Surveillance.
Revised the bases to align with TSTF-502-T, Correct 08/26/2021 6
Containment Isolation Valve Bases Regarding Closed Systems.
Revised due to replacing Rod Position Indication 01/03/2022 2
analog meters with digital Rod Position Indication Recorders. Enqineerinq Chanqe 294454 09/28/2022 3
Revised to add clarification of "Loops Filled" in the Applicability Section.
Page 1 of 2
Affected Section TRM 4.12 TRM 4.12 TRM 3.3.2 TRM 3.1.1 TRM 4.12 TRM 3.5.1 TRM 4.12 TECHNICAL REQUIREMENTS MANUAL (TRM) CHANGE
SUMMARY
FOR March 1, 2021 - October 1, 2022 Date of Affected Change Page(s)
Summary The change removes the requirement for quarterly appearance testing on stored fuel for "clear and bright" per ASTM D4176. This was recently added to the TRM with the issuance of the last revision due to recommendations from an industry document INPO NISP 301. It has been determined that this quarterly 04/21/2021 6-7 appearance testinq is not necessary.
Revised Sections 7.1 for No. 2 diesel fuel and 7.2 for blended No 1 and No 2 diesel fuel for allowable biodiesel from 0.1 % to 1.0% to align with INPO Industry Guideline CY-NISP-301, Diesel Fuel Oil 09/15/2021 6-7 Program.
Updating LEFM to Check-M3P per Engineering 04/21/2021 2
Change (EC) 293505 Conditional elimination of control rod worth testing 10/16/2021 1-2 from the Startup Physics Testing program Updated for various fuel oil testing parameters and guidance to align with industry document for 04/11/2022 1-2 Microbiological, cloud point and pour point.
09/28/2022 4
Administrative change to add (5) for Note 5 back into table 3.5.1-1. It was inadvertently left off in a subsequent revision.
09/28/2022 2-4 Removing T-328 diesel fuel oil storage tank and associated equipment.
Page 2 of 2