ML22342B280 | 28 December 2022 | Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 | |
ML22353A612 | 19 December 2022 | March 2023 Emergency Preparedness Exercise Inspection - Request for Information | |
IR 05000415/2022301 | 19 December 2022 | NRC Examination Report 05000415/2022301 | Locked High Radiation Area |
ML22340A672 | 6 December 2022 | Request to Update ASME Code Relief Request Safety Evaluations with NRC Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019) | |
ML22334A099 | 30 November 2022 | Report Pursuant to 10CFR71.95(b) to Report a Failure to Comply with Conditions of Certificate of Compliance During a Shipment | |
ML22312A583 | 8 November 2022 | Notification of Cyber Security Baseline Inspection and Request for Information 05000416/2023401 | Cyber Security |
PMNS20221160, Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet | 4 November 2022 | Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet | |
IR 05000416/2022003 | 3 November 2022 | Integrated Inspection Report 05000416/2022003 | Enforcement Discretion Temporary Modification Functionality Assessment Significance Determination Process Operability Determination Fire Protection Program |
IR 05000416/2022403 | 1 November 2022 | Security Baseline Inspection Report 05000416 2022403 (Cover Letter Only) | Affidavit |
ML22301A174 | 28 October 2022 | Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt) | |
ML22301A141 | 27 October 2022 | Overview of 10 CFR Part 21- Tim Steadham SRI Region IV | |
IR 05000416/2022013 | 24 October 2022 | Revised Grand Gulf Nuclear Station Design Basis Assurance Inspection Report 05000416/2022013 | Stroke time Probabilistic Risk Assessment Anchor Darling Significance Determination Process Power-Operated Valves |
IR 05000416/2022050 | 20 October 2022 | Special Inspection Reactive Report 05000416/2022050 | Commercial Grade Dedication Significance Determination Process Operability Determination |
ML22342B259 | 14 October 2022 | 10 Post Examination Analysis | |
ML22342B260 | 14 October 2022 | 10 Public Forms | Job Performance Measure |
ML22280A029 | 11 October 2022 | Design Basis Assurance Inspection (Programs) Inspection Report 05000416/2022013 | Stroke time Probabilistic Risk Assessment Anchor Darling Significance Determination Process Time Critical Operator Action Power-Operated Valves |
ML22271A857 | 3 October 2022 | Notification of Commercial Grade Dedication Inspection (05000416/2023011) and Request for Information | Commercial Grade Dedication |
IR 05000416/2022301 | 30 September 2022 | NRC Initial Operator Licensing Examination Approval 05000416/2022301 | |
ML22269A448 | 30 September 2022 | Project Manager Assignment | |
ML22266A062 | 29 September 2022 | Entergy Fleet Submittals - Project Manager Reassignment | |
ML22257A014 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | Offsite Dose Calculation Manual |
ML22257A017 | 8 September 2022 | Updated Final Safety Analysis Report, Appendix a, Updated Final Safety Analysis Report Supplement | Fire Barrier Anticipated operational occurrence Coatings Condition Adverse to Quality Aging Management Moisture barrier License Renewal Earthquake Fire Protection Program Dissimilar Metal Weld Power Uprate |
ML22257A021 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Loop seal Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Water Inventory Control Hydrostatic Annual Radioactive Effluent Release Report Process Control Program Earthquake Power-Operated Valves Fuel cladding |
ML22257A042 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | |
ML22257A018 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 18, Responses to TMI-Related Requirements | Reactor Vessel Water Level Post Accident Monitoring Power-Operated Valves |
ML22257A020 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations | |
ML22257A006 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Stroke time Hydrostatic Emergency Lighting Scram Discharge Volume Battery sizing Overtravel |
ML22257A009 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 4, Reactor | Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Non-Destructive Examination Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Channel-control blade interference Finite Element Analysis Abnormal operational transient Scram Discharge Volume Overtravel Earthquake Fuel cladding Power change Flow Induced Vibration Coast down |
ML22257A010 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Operator Manual Action Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure MELLLA Time Critical Operator Action Earthquake Fuel cladding Recently irradiated fuel Power change Flow Induced Vibration Power Uprate Overexposure Failure to Scram |
ML22257A011 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Loop seal High Radiation Area Hydrostatic Temporary Modification Abnormal operational transient Turbine Missile Liquid penetrant |
ML22257A013 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 12, Radiation Protection | Safe Shutdown High Radiation Area Grab sample Anticipated operational occurrence Safe Shutdown Earthquake Coatings Locked High Radiation Area Earthquake Power Uprate |
ML22257A036 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 4, Reactor | Shutdown Margin Reactor Vessel Water Level Safety Limit Minimum Critical Power Ratio Non-Destructive Examination Safe Shutdown Earthquake Hydrostatic Operating Basis Earthquake Nondestructive Examination Channel-control blade interference Finite Element Analysis Abnormal operational transient Scram Discharge Volume Overtravel Earthquake Fuel cladding Power change Flow Induced Vibration Coast down |
ML22257A015 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Half scram Ultimate heat sink Grab sample Fire Barrier Anticipated operational occurrence Water Inventory Control Safe Shutdown Earthquake Post Accident Monitoring Met Tower Operating Basis Earthquake Squib FLEX Abnormal operational transient Scram Discharge Volume Overtravel Earthquake Fuel cladding Pressure Boundary Leakage Pressure boundary leak Fire Protection Program Power change |
ML22257A007 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 6, Engineering Safety Features | Safe Shutdown Reactor Vessel Water Level Loop seal Ultimate heat sink Stroke time Safe Shutdown Earthquake Hydrostatic Coatings Nondestructive Examination FLEX Foreign Material Exclusion Earthquake Power Operated Valves Turbine Missile Fuel cladding Liquid penetrant Recently irradiated fuel Dissimilar Metal Weld Scaffolding Unidentified leakage Power Uprate |
ML22257A005 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 8, Electric Power | Safe Shutdown High winds Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Emergency Lighting FLEX Open Phase Condition Turbine Missile Offsite Circuit |
ML22251A367 | 8 September 2022 | Submittal of Updated Final Safety Analysis Report, Cover Letter | Aging Management |
ML22257A030 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 18, Responses to TMI-Related Requirements | Reactor Vessel Water Level Post Accident Monitoring Power-Operated Valves |
ML22257A032 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | |
ML22257A027 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 16, Technical Specifications | Offsite Dose Calculation Manual |
ML22257A025 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 14, Initial Test Program | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Stroke time Hydrostatic Emergency Lighting Scram Discharge Volume Battery sizing Overtravel |
ML22257A040 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Reactor Vessel Water Level Loop seal Packing leak Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination Abnormal operational transient Pressure and Temperature Limits Report Earthquake Power-Operated Valves Fuel cladding Liquid penetrant Pressure Boundary Leakage Scaffolding Power change Flow Induced Vibration Coast down |
ML22257A043 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management | Loop seal Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Water Inventory Control Hydrostatic Annual Radioactive Effluent Release Report Process Control Program Earthquake Power-Operated Valves Fuel cladding |
ML22257A037 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System | Safe Shutdown Loop seal High Radiation Area Hydrostatic Temporary Modification Abnormal operational transient Turbine Missile Liquid penetrant |
ML22257A016 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems | Reactor Vessel Water Level Loop seal Packing leak Non-Destructive Examination Grab sample Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Weld Overlay Hydrostatic Nondestructive Examination Abnormal operational transient Pressure and Temperature Limits Report Earthquake Power-Operated Valves Fuel cladding Liquid penetrant Pressure Boundary Leakage Scaffolding Power change Flow Induced Vibration Coast down |
ML22257A033 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 8, Electric Power | Safe Shutdown High winds Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Operating Basis Earthquake Emergency Lighting FLEX Open Phase Condition Turbine Missile Offsite Circuit |
ML22257A039 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control Systems | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Loop seal High Radiation Area Half scram Ultimate heat sink Grab sample Fire Barrier Anticipated operational occurrence Water Inventory Control Safe Shutdown Earthquake Post Accident Monitoring Met Tower Operating Basis Earthquake Squib FLEX Abnormal operational transient Scram Discharge Volume Overtravel Earthquake Fuel cladding Pressure Boundary Leakage Pressure boundary leak Fire Protection Program Power change |
ML22257A026 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 15, Accident Analyses | Safe Shutdown Shutdown Margin Reactor Vessel Water Level Stroke time Anticipated operational occurrence Safe Shutdown Earthquake Operator Manual Action Abnormal operational transient Scram Discharge Volume Feedwater Controller Failure MELLLA Time Critical Operator Action Earthquake Fuel cladding Recently irradiated fuel Power change Flow Induced Vibration Power Uprate Overexposure Failure to Scram |
ML22257A028 | 8 September 2022 | Updated Final Safety Analysis Report, Appendix a, Updated Final Safety Analysis Report Supplement | Fire Barrier Anticipated operational occurrence Coatings Condition Adverse to Quality Aging Management Moisture barrier License Renewal Earthquake Fire Protection Program Dissimilar Metal Weld Power Uprate |
ML22257A023 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 17, Quality Assurance | |
ML22257A022 | 8 September 2022 | Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant | Safe Shutdown Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Tornado Missile Safe Shutdown Earthquake Post Accident Monitoring Operating Basis Earthquake Emergency Lighting Incorporated by reference Abnormal operational transient Tornado Missile Protection Scram Discharge Volume Feedwater Controller Failure MELLLA Earthquake Fuel cladding Offsite Circuit |