Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML22342B28028 December 2022Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1
ML22353A61219 December 2022March 2023 Emergency Preparedness Exercise Inspection - Request for Information
IR 05000415/202230119 December 2022NRC Examination Report 05000415/2022301Locked High Radiation Area
ML22340A6726 December 2022Request to Update ASME Code Relief Request Safety Evaluations with NRC Approved Revision of BWRVIP Guidelines (GG-ISI-020, and RBS-ISI-019)
ML22334A09930 November 2022Report Pursuant to 10CFR71.95(b) to Report a Failure to Comply with Conditions of Certificate of Compliance During a Shipment
ML22312A5838 November 2022Notification of Cyber Security Baseline Inspection and Request for Information 05000416/2023401Cyber Security
PMNS20221160, Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet4 November 2022Notice of Closed Meeting with Entergy Operations Inc. to Discuss Security Program Strategy Changes Applicable to the Entergy Fleet
IR 05000416/20220033 November 2022Integrated Inspection Report 05000416/2022003Enforcement Discretion
Temporary Modification
Functionality Assessment
Significance Determination Process
Operability Determination
Fire Protection Program
IR 05000416/20224031 November 2022Security Baseline Inspection Report 05000416 2022403 (Cover Letter Only)Affidavit
ML22301A17428 October 2022Global Nuclear Fuel Americas, LLC (GNF) - Part 21 60-Day Interim Report Notification: GNF3 Raised Water Rod (SC-22-04 Rt)
ML22301A14127 October 2022Overview of 10 CFR Part 21- Tim Steadham SRI Region IV
IR 05000416/202201324 October 2022Revised Grand Gulf Nuclear Station Design Basis Assurance Inspection Report 05000416/2022013Stroke time
Probabilistic Risk Assessment
Anchor Darling
Significance Determination Process
Power-Operated Valves
IR 05000416/202205020 October 2022Special Inspection Reactive Report 05000416/2022050Commercial Grade Dedication
Significance Determination Process
Operability Determination
ML22342B25914 October 202210 Post Examination Analysis
ML22342B26014 October 202210 Public FormsJob Performance Measure
ML22280A02911 October 2022Design Basis Assurance Inspection (Programs) Inspection Report 05000416/2022013Stroke time
Probabilistic Risk Assessment
Anchor Darling
Significance Determination Process
Time Critical Operator Action
Power-Operated Valves
ML22271A8573 October 2022Notification of Commercial Grade Dedication Inspection (05000416/2023011) and Request for InformationCommercial Grade Dedication
IR 05000416/202230130 September 2022NRC Initial Operator Licensing Examination Approval 05000416/2022301
ML22269A44830 September 2022Project Manager Assignment
ML22266A06229 September 2022Entergy Fleet Submittals - Project Manager Reassignment
ML22257A0148 September 2022Updated Final Safety Analysis Report, Chapter 16, Technical SpecificationsOffsite Dose Calculation Manual
ML22257A0178 September 2022Updated Final Safety Analysis Report, Appendix a, Updated Final Safety Analysis Report SupplementFire Barrier
Anticipated operational occurrence
Coatings
Condition Adverse to Quality
Aging Management
Moisture barrier
License Renewal
Earthquake
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
ML22257A0218 September 2022Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste ManagementLoop seal
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Water Inventory Control
Hydrostatic
Annual Radioactive Effluent Release Report
Process Control Program
Earthquake
Power-Operated Valves
Fuel cladding
ML22257A0428 September 2022Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML22257A0188 September 2022Updated Final Safety Analysis Report, Chapter 18, Responses to TMI-Related RequirementsReactor Vessel Water Level
Post Accident Monitoring
Power-Operated Valves
ML22257A0208 September 2022Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations
ML22257A0068 September 2022Updated Final Safety Analysis Report, Chapter 14, Initial Test ProgramSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Hydrostatic
Emergency Lighting
Scram Discharge Volume
Battery sizing
Overtravel
ML22257A0098 September 2022Updated Final Safety Analysis Report, Chapter 4, ReactorShutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Non-Destructive Examination
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Channel-control blade interference
Finite Element Analysis
Abnormal operational transient
Scram Discharge Volume
Overtravel
Earthquake
Fuel cladding
Power change
Flow Induced Vibration
Coast down
ML22257A0108 September 2022Updated Final Safety Analysis Report, Chapter 15, Accident AnalysesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Operator Manual Action
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Time Critical Operator Action
Earthquake
Fuel cladding
Recently irradiated fuel
Power change
Flow Induced Vibration
Power Uprate
Overexposure
Failure to Scram
ML22257A0118 September 2022Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Loop seal
High Radiation Area
Hydrostatic
Temporary Modification
Abnormal operational transient
Turbine Missile
Liquid penetrant
ML22257A0138 September 2022Updated Final Safety Analysis Report, Chapter 12, Radiation ProtectionSafe Shutdown
High Radiation Area
Grab sample
Anticipated operational occurrence
Safe Shutdown Earthquake
Coatings
Locked High Radiation Area
Earthquake
Power Uprate
ML22257A0368 September 2022Updated Final Safety Analysis Report, Chapter 4, ReactorShutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Non-Destructive Examination
Safe Shutdown Earthquake
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Channel-control blade interference
Finite Element Analysis
Abnormal operational transient
Scram Discharge Volume
Overtravel
Earthquake
Fuel cladding
Power change
Flow Induced Vibration
Coast down
ML22257A0158 September 2022Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control SystemsSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Loop seal
High Radiation Area
Half scram
Ultimate heat sink
Grab sample
Fire Barrier
Anticipated operational occurrence
Water Inventory Control
Safe Shutdown Earthquake
Post Accident Monitoring
Met Tower
Operating Basis Earthquake
Squib
FLEX
Abnormal operational transient
Scram Discharge Volume
Overtravel
Earthquake
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
Fire Protection Program
Power change
ML22257A0078 September 2022Updated Final Safety Analysis Report, Chapter 6, Engineering Safety FeaturesSafe Shutdown
Reactor Vessel Water Level
Loop seal
Ultimate heat sink
Stroke time
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
FLEX
Foreign Material Exclusion
Earthquake
Power Operated Valves
Turbine Missile
Fuel cladding
Liquid penetrant
Recently irradiated fuel
Dissimilar Metal Weld
Scaffolding
Unidentified leakage
Power Uprate
ML22257A0058 September 2022Updated Final Safety Analysis Report, Chapter 8, Electric PowerSafe Shutdown
High winds
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Operating Basis Earthquake
Emergency Lighting
FLEX
Open Phase Condition
Turbine Missile
Offsite Circuit
ML22251A3678 September 2022Submittal of Updated Final Safety Analysis Report, Cover LetterAging Management
ML22257A0308 September 2022Updated Final Safety Analysis Report, Chapter 18, Responses to TMI-Related RequirementsReactor Vessel Water Level
Post Accident Monitoring
Power-Operated Valves
ML22257A0328 September 2022Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML22257A0278 September 2022Updated Final Safety Analysis Report, Chapter 16, Technical SpecificationsOffsite Dose Calculation Manual
ML22257A0258 September 2022Updated Final Safety Analysis Report, Chapter 14, Initial Test ProgramSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Hydrostatic
Emergency Lighting
Scram Discharge Volume
Battery sizing
Overtravel
ML22257A0408 September 2022Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsReactor Vessel Water Level
Loop seal
Packing leak
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Nondestructive Examination
Abnormal operational transient
Pressure and Temperature Limits Report
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Scaffolding
Power change
Flow Induced Vibration
Coast down
ML22257A0438 September 2022Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste ManagementLoop seal
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Water Inventory Control
Hydrostatic
Annual Radioactive Effluent Release Report
Process Control Program
Earthquake
Power-Operated Valves
Fuel cladding
ML22257A0378 September 2022Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion SystemSafe Shutdown
Loop seal
High Radiation Area
Hydrostatic
Temporary Modification
Abnormal operational transient
Turbine Missile
Liquid penetrant
ML22257A0168 September 2022Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected SystemsReactor Vessel Water Level
Loop seal
Packing leak
Non-Destructive Examination
Grab sample
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Nondestructive Examination
Abnormal operational transient
Pressure and Temperature Limits Report
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Scaffolding
Power change
Flow Induced Vibration
Coast down
ML22257A0338 September 2022Updated Final Safety Analysis Report, Chapter 8, Electric PowerSafe Shutdown
High winds
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Operating Basis Earthquake
Emergency Lighting
FLEX
Open Phase Condition
Turbine Missile
Offsite Circuit
ML22257A0398 September 2022Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Control SystemsSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Loop seal
High Radiation Area
Half scram
Ultimate heat sink
Grab sample
Fire Barrier
Anticipated operational occurrence
Water Inventory Control
Safe Shutdown Earthquake
Post Accident Monitoring
Met Tower
Operating Basis Earthquake
Squib
FLEX
Abnormal operational transient
Scram Discharge Volume
Overtravel
Earthquake
Fuel cladding
Pressure Boundary Leakage
Pressure boundary leak
Fire Protection Program
Power change
ML22257A0268 September 2022Updated Final Safety Analysis Report, Chapter 15, Accident AnalysesSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Stroke time
Anticipated operational occurrence
Safe Shutdown Earthquake
Operator Manual Action
Abnormal operational transient
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Time Critical Operator Action
Earthquake
Fuel cladding
Recently irradiated fuel
Power change
Flow Induced Vibration
Power Uprate
Overexposure
Failure to Scram
ML22257A0288 September 2022Updated Final Safety Analysis Report, Appendix a, Updated Final Safety Analysis Report SupplementFire Barrier
Anticipated operational occurrence
Coatings
Condition Adverse to Quality
Aging Management
Moisture barrier
License Renewal
Earthquake
Fire Protection Program
Dissimilar Metal Weld
Power Uprate
ML22257A0238 September 2022Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML22257A0228 September 2022Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of PlantSafe Shutdown
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Post Accident Monitoring
Operating Basis Earthquake
Emergency Lighting
Incorporated by reference
Abnormal operational transient
Tornado Missile Protection
Scram Discharge Volume
Feedwater Controller Failure
MELLLA
Earthquake
Fuel cladding
Offsite Circuit