Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML22257A032
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 09/08/2022
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22257A024 List:
References
GNRO2022-00027
Download: ML22257A032 (2)


Text

GRAND GULF NUCLEAR GENERATING STATION Updated Final Safety Analysis Report (UFSAR)

TABLE OF CONTENTS CHAPTER 17 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION . . . . . 17.1-1 17.2 QUALITY ASSURANCE DURING THE OPERATING PHASE . . . . . . . 17.1-1 17-i Revision 2016-00

GRAND GULF NUCLEAR GENERATING STATION Updated Final Safety Analysis Report (UFSAR) 17.0 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section, as it relates to GGNS, is covered in the PSAR.

17.2 QUALITY ASSURANCE DURING THE OPERATING PHASE This section was covered in a separate topical report (GGNS-TOP-1A), but has been replaced by a Corporate QA manual.

17.1-1 Revision 2016-00