Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML22340A689 | 20 December 2022 | Regulatory Audit Summary in Support of Review for LAR to Revise Technical Specifications to Adopt TSTF-505, Rev. 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4B | Probabilistic Risk Assessment |
GO2-22-131, Guarantee of Payment of Deferred Premium | 19 December 2022 | Guarantee of Payment of Deferred Premium | |
ML22308A096 | 15 December 2022 | Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Safe Shutdown High winds Internal Flooding Probabilistic Risk Assessment FLEX Large early release frequency |
ML23041A215 | 15 December 2022 | Energy Northwest, Emergency Preparedness Procedure 13.10.17, Revision 006, TSC Ventilation Radiation Monitor System Operations | |
ML22343A180 | 8 December 2022 | February 2023 Emergency Preparedness Program Inspection - Request for Information | |
ML22349A200 | 1 December 2022 | NRR E-mail Capture - (External_Sender) Energy Northwest Columbia Generating Station 2022 Priority Pollutant Discharge Monitoring Report | |
GO2-22-122, Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 28 November 2022 | Response to Request for Additional Information Related to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | |
ML22263A445 | 23 November 2022 | Issuance of Amendment No. 268 to Revise Technical Specification 3.4.11 RCS Pressure and Temperature (P/T) Limits | Anticipated operational occurrence Hydrostatic Finite Element Analysis Pressure and Temperature Limits Report |
IR 05000397/2022401 | 12 November 2022 | Cyber Security Inspection Report 05000397/2022401 (Cover Letter Only) | Cyber Security Affidavit |
ML22314A033 | 9 November 2022 | Security Baseline Inspection Report (Cover Page) | |
ML22312A004 | 7 November 2022 | NRR E-mail Capture - Columbia Generating Station - LIC-109 Acceptance of Fourth 10 Year ISI RR 4ISI-11 - EPID L-2022-LLR-0071 | |
GO2-22-076, Status of License Renewal Commitments | 31 October 2022 | Status of License Renewal Commitments | Coatings Aging Management Fire Protection Program |
IR 05000397/2022003 | 31 October 2022 | Integrated Inspection Report 05000397/2022003 | Safe Shutdown Mission time Internal Flooding Enforcement Discretion Functionality Assessment Significance Determination Process Operability Determination Severe Accident Management Guideline Maintenance Rule Program Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Power change |
ML22301A143 | 28 October 2022 | NRR E-mail Capture - Final - Request for Additional Information - Columbia Generating Station - License Amendment Request to Adopt TSTF-505 - EPID L-2022-LLA-0023 | |
GO2-22-110, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor | 17 October 2022 | Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactor | Large early release frequency |
ML22278B097 | 5 October 2022 | Fourth Ten-Year Interval Inservice Inspection Program Relief Request 4ISl-11 | |
GO2-22-096, Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | 4 October 2022 | Supplement to License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Reactor Vessel Water Level Probabilistic Risk Assessment Qualified Offsite Circuit FLEX Thermoset Large early release frequency Maintenance Rule Program Offsite Circuit |
IR 05000397/2022405 | 15 September 2022 | Material Control and Accounting Program Inspection Report 05000397 2022405 Cover Ltr Only | Affidavit |
ML22256A200 | 13 September 2022 | NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 | |
IR 05000397/2022403 | 1 September 2022 | NRC Security Inspection Report 05000397/2022403 (Full Report) | |
GO2-22-085, Docket No. 50-397, Evacuation Time Estimate Analysis | 30 August 2022 | Docket No. 50-397, Evacuation Time Estimate Analysis | Pandemic Coronavirus COVID19 |
ML22242A108 | 30 August 2022 | Information Request, Information Request, Security IR 2022404 | |
ML22241A018 | 26 August 2022 | NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 | Safe Shutdown Anticipated operational occurrence Qualified Offsite Circuit Emergency Lighting Offsite Circuit |
ML22230C739 | 23 August 2022 | 2022 Mid-Cycle Planning Letter | Fitness for Duty Commercial Grade Dedication Cyber Security Aging Management Exemption Request Coronavirus |
ML22235A105 | 22 August 2022 | August 2022 Emergency Preparedness Exercise Inspection Request for Information | Coronavirus |
ML22200A261 | 9 August 2022 | Request for Withholding Information from Public Disclosure | |
IR 05000397/2022002 | 28 July 2022 | and Independent Spent Fuel Storage Installation - Integrated Inspection Report 05000397/2022002 and 07200035/2022001 | Safe Shutdown High Radiation Area Enforcement Discretion Temporary Modification Functionality Assessment Locked High Radiation Area Significance Determination Process Annual Radioactive Effluent Release Report Operability Determination License Renewal Earthquake Maintenance Rule Program Fire Protection Program Hourly Fire Watch Substantial potential for an overexposure Power change Downpower Unidentified leakage Overexposure |
ML22210A007 | 28 July 2022 | NRR E-mail Capture - Draft - Additional Audit Question - Columbia Generating Station - Regulatory Audit Question for LAR to Revise TS to Adopt TSTF-505, Revision 2 | Probabilistic Risk Assessment |
ML22187A182 | 21 July 2022 | Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors | Probabilistic Risk Assessment FLEX |
GO2-22-075, Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves | 11 July 2022 | Response to Request for Additional Information Related to Revised Pressure-Temperature Limit Curves | Shutdown Margin Hydrostatic Pressure and Temperature Limits Report |
GO2-22-072, Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing | 11 July 2022 | Summary of Changes and Analysis for Revision 57 of PPM 13.14.4 - Emergency Equipment Maintenance and Testing | |
ML22165A296 | 6 July 2022 | Regulatory Audit Agenda and Questions for License Amendment Request to Revise Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b | Reactor Vessel Water Level Internal Flooding Probabilistic Risk Assessment Qualified Offsite Circuit FLEX Scram Discharge Volume Maintenance Rule Program Offsite Circuit |
IR 05000397/2022010 | 30 June 2022 | Design Basis Assurance Inspection (Team) Inspection Report 05000397/2022010 | Past operability Condition Adverse to Quality Significance Determination Process Large early release frequency Operability Determination |
IR 05000397/2022402 | 23 June 2022 | Security Baseline Inspection Report 05000397/2022402 | Safeguards Contingency Plan |
ML22173A068 | 17 June 2022 | Email Concurrence on SE Input for Columbia Pltr LAR | |
ML22178A140 | 16 June 2022 | Generation Station, Rev. 57 to EPIP 13.14.4, Emergency Equipment Maintenance and Testing | Met Tower |
ML22166A412 | 15 June 2022 | NRR E-mail Capture - LIC-109 Acceptance Review of LAR for Columbia Generating Station - Application to Revise TS to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling - EPID L-2022-LLA-0081 | |
ML22145A446 | 6 June 2022 | Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000397/2022401 | Cyber Security |
ML22147A093 | 6 June 2022 | 2021 Annual Assessment Public Meeting Summary | Pandemic Coronavirus COVID-19 |
GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process | 25 May 2022 | Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process | Surveillance Frequency Control Program |
GO2-22-062, Registration of Spent Fuel Cask Use | 19 May 2022 | Registration of Spent Fuel Cask Use | |
ML22144A034 | 18 May 2022 | NRR E-mail Capture - Draft - Request for Additional Information - Columbia Generating Station - LAR to Change TS 3.4.11 - Reactor Coolant System Pressure and Temperature Limits - EPID L-2021-LLA-0191 | Anticipated operational occurrence Hydrostatic Pressure and Temperature Limits Report |
ML22109A092 | 18 May 2022 | Correction Letter - Approval for Alternate Disposal Procedures for the Continued Onsite Disposal of Cooling Tower and Spray Pond Sludge in the Existing Sediment Disposal Area | |
GO2-22-049, Supplement to Licensing Amendment Request to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Rectors | 10 May 2022 | Supplement to Licensing Amendment Request to Adopt 10CFR50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Rectors | Internal Flooding Probabilistic Risk Assessment Large early release frequency |
GO2-22-054, Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report | 9 May 2022 | Independent Spent Fuel Storage Installation, 2021 Annual Radiological Environmental Operating Report | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Chernobyl COVID-19 Tritium |
ML22098A064 | 9 May 2022 | Issuance of Amendment No. 267 to Adopt Technical Specifications Task Force (TSTF) 546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement | Surveillance Frequency Control Program Fuel cladding Power change |
ML22116A081 | 3 May 2022 | Notification of NRC Initial Operator Licensing Exam 05000397/2023301 | |
PMNS20220467, Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants | 3 May 2022 | Public Webinar to Discuss the Nuclear Regulatory Commission'S 2021 Annual Assessment of Safety Performance at Region IV Plants | |
IR 05000397/2022001 | 29 April 2022 | Integrated Inspection Report 05000397/2022001 | Packing leak Fire Barrier Past operability Enforcement Discretion Nondestructive Examination Temporary Modification VT-2 Functionality Assessment Condition Adverse to Quality FLEX B.5.b Significance Determination Process Operability Determination Maintenance Rule Program Coronavirus COVID-19 Through-Wall Leak Fire Protection Program Power change |
GO2-22-056, Registration of Spent Fuel Cask Use | 21 April 2022 | Registration of Spent Fuel Cask Use |