Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000482/2017403 | 31 March 2017 | NRC Security Inspection Report 05000482/2017403 - March 31, 2017 | Affidavit |
ML17095A918 | 30 March 2017 | Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1) | |
ML17089A694 | 30 March 2017 | Operating Company - Amended Notification of NRC Initial Operator Licensing Examination 05000482/2017301 | |
IR 05000482/2017406 | 29 March 2017 | Final Significance Determination for a Security Related Green Finding; NRC Security Inspection Report 05000482/2017406 | Significance Determination Process Affidavit |
IR 05000482/2017405 | 29 March 2017 | Final Significance Determination for a Security-Related Green Finding; NRC Security Inspection Report 05000482/2017405 (Letter Without Enclosure) | Significance Determination Process Affidavit |
ML17093A665 | 27 March 2017 | Report on Financial Protection Levels | |
WO 17-0023, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report | 27 March 2017 | Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report | Post Accident Monitoring |
ML17024A241 | 24 March 2017 | Issuance of Amendment No. 217 Revision to the Cyber Security Plan Implementation Schedule | Enforcement Discretion Cyber Security |
WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses | 22 March 2017 | Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses | |
ML17088A331 | 22 March 2017 | Transmittal of the Kansas Water Pollution Control Permit and Authorization to Discharge Under the National Pollutant Discharge Elimination System | Ultimate heat sink Grab sample Zebra Mussel |
ML17087A269 | 21 March 2017 | 10 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes | |
TAC:D92368 | 16 March 2017 | ||
WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme | 16 March 2017 | Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme | Safe Shutdown Time of Discovery High winds Reactor Vessel Water Level Ultimate heat sink Offsite Dose Calculation Manual Fire Barrier Time to boil Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Operator Manual Action Spent Fuel Pool Instrumentation Earthquake Fuel cladding Pressure Boundary Leakage Fire Protection Program Grace period Power change |
ML17033A340 | 15 March 2017 | Wolf Creek Generating Station - Flood Hazard Mitigation Strategies Assessment (CAC No. MF7992) | Flood Hazard Mitigation Strategies Assessment |
ML17079A233 | 13 March 2017 | Revision of Three Forms That Implement the Radiological Emergency Response Plan (RERP) | |
ML17151B018 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 18.0, Response to NUREG-0737, Clarification of TMI Action Plan Requirements. | Safe Shutdown Boric Acid Reactor Vessel Water Level Loop seal High Radiation Area Ultimate heat sink Non-Destructive Examination Grab sample Fire Barrier Anticipated operational occurrence Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Incorporated by reference Aging Management Pressure and Temperature Limits Report License Renewal Earthquake Control of Heavy Loads Fuel cladding Biofouling Fire Protection Program |
ML17151B000 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System and Connected Systems | Boric Acid Loop seal Stroke time Safe Shutdown Earthquake Weld Overlay Hydrostatic Operating Basis Earthquake Nondestructive Examination Incorporated by reference Pressure and Temperature Limits Report Fuel cladding Liquid penetrant Pressure Boundary Leakage Dissimilar Metal Weld Scaffolding Power change |
ML17151B062 | 9 March 2017 | Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, B7-80 to B8-147 | Safe Shutdown Fire Barrier Fire Protection Program |
ML17151B080 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 11, Figures 11.2-1-01 Through 11.4-1-04 | |
ML17073A111 | 9 March 2017 | Submittal of Seismic High Frequency Confirmation, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima... | Fukushima Dai-Ichi |
ML17073A093 | 9 March 2017 | Changes to Technical Specification Bases - Revisions 74 and 75 | Safe Shutdown Anticipated operational occurrence Foreign Material Exclusion Offsite Circuit |
ML17151B065 | 9 March 2017 | Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, G1A-64 to G1A-123 | Fire Barrier |
ML17151B005 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 8.0, Electric Power | Hot Short Safe Shutdown Boric Acid Fire Barrier Temporary Modification Emergency Lighting Incorporated by reference Open Phase Condition |
ML17151B064 | 9 March 2017 | Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, B13-26 to G1A-63 | Safe Shutdown Boric Acid Fire Barrier Coatings Fire Protection Program |
ML17151B053 | 9 March 2017 | Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W01, B1-99 to B2-40 | Safe Shutdown Fire Barrier Fire Protection Program |
ML17151B071 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 6, Figures 6.2.2-1-00 Through 6.3-1-04 | |
ML17151B068 | 9 March 2017 | Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, G2B1 to G2B79 | Boric Acid Fire Barrier |
ML17151B015 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 16.0, Relocated Technical Specifications | Incorporated by reference |
ML17151B073 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.1-1-01 - 1.2-44 | |
ML17151B019 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Responses to Questions 005.1 Through 031.20 | Hot Short Safe Shutdown Boric Acid Shutdown Margin High Radiation Area Ultimate heat sink Anticipated operational occurrence Tornado Missile Internal Flooding Hydrostatic Coatings Emergency Lighting Earthquake Turbine Missile |
ML17151B052 | 9 March 2017 | Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, CS to B1-98 - Redacted | Safe Shutdown Fire Barrier Coatings Fire Protection Program |
ML17151B076 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 8, Figures 8.2-3 Through 8.3-7-00 | |
ML17151B072 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 7, Figures 7.2-1-01 Through 7.6-4-2 | |
ML17151B016 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 17.0, Quality Assurance | |
ML17151B061 | 9 March 2017 | Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, B6-3 to B7-79 | Safe Shutdown Fire Barrier Fire Protection Program |
ML17151A992 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Cover Page | |
ML17151B002 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 6.0, Engineered Safety Features | Safe Shutdown Boric Acid Packing leak Ultimate heat sink Stroke time Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Nondestructive Examination Emergency Lighting Incorporated by reference Tornado Missile Protection Thermoset Frazil ice Earthquake Power-Operated Valves Fuel cladding Liquid penetrant Scaffolding |
ML17151B055 | 9 March 2017 | Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, G3D-27 to G4D-19 | Safe Shutdown Boric Acid Fire Barrier Coatings Fire Protection Program |
ML17151B033 | 9 March 2017 | E-1F9900, Rev. 9, Post-Fire Safe Shutdown Operator Manual Actions, Redacted | Hot Short Safe Shutdown Fire Barrier Enforcement Discretion Fire impairment Operator Manual Action Multiple Spurious Operation Arc flash Emergency Lighting Incorporated by reference Significance Determination Process Thermoset Continuous fire watch Fire Protection Program Fire Watch |
ML17151B060 | 9 March 2017 | Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, B2-41 to B6-2 | Safe Shutdown Fire Barrier Fire Protection Program |
ML17151B057 | 9 March 2017 | Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05-01 | Fire Barrier |
ML17151A997 | 9 March 2017 | Wolf Creek Revision 30 to Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment, and Systems | |
ML17151B008 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 10.0, Steam and Power Conversion System | Safe Shutdown Offsite Dose Calculation Manual Tornado Missile Hydrostatic Incorporated by reference Fast acting solenoid valve Earthquake Power-Operated Valves Turbine Missile |
WO 17-0045, Revision 30 to Updated Final Safety Analysis Report, Chapter 18, Figures18.2-15-00 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 18, Figures18.2-15-00 | |
ML17151B009 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 11.0, Radioactive Waste Management | Safe Shutdown Boric Acid Grab sample Offsite Dose Calculation Manual Anticipated operational occurrence Tornado Missile Hydrostatic Incorporated by reference Annual Radioactive Effluent Release Report Process Control Program Earthquake |
ML17151B003 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 7.0, Instrumentation and Controls | Safe Shutdown Boric Acid Shutdown Margin Reactor Vessel Water Level Ultimate heat sink Grab sample Anticipated operational occurrence Water Inventory Control Met Tower Temporary Modification Incorporated by reference Earthquake Fuel cladding Pressure Boundary Leakage Power change |
ML17151A993 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and General Description of the Plant | Safe Shutdown Boric Acid Ultimate heat sink Grab sample Offsite Dose Calculation Manual Fire Barrier Tornado Missile Safe Shutdown Earthquake Hydrostatic Coatings Operating Basis Earthquake Incorporated by reference Safeguards Contingency Plan Earthquake Fuel cladding Fire Protection Program Overexposure |
ML17151B010 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, Chapter 12.0, Radiation Protection | |
ML17151B020 | 9 March 2017 | Revision 30 to Updated Final Safety Analysis Report, List of Effective Pages | |
ML17151B045 | 9 March 2017 | Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 2 - Redacted | Boric Acid Ultimate heat sink |