Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000482/201740331 March 2017NRC Security Inspection Report 05000482/2017403 - March 31, 2017Affidavit
ML17095A91830 March 2017Financial Assurance Requirements for Decommissioning Nuclear Power Reactors 10 CFR 50.75(f)(1)
ML17089A69430 March 2017Operating Company - Amended Notification of NRC Initial Operator Licensing Examination 05000482/2017301
IR 05000482/201740629 March 2017Final Significance Determination for a Security Related Green Finding; NRC Security Inspection Report 05000482/2017406Significance Determination Process
Affidavit
IR 05000482/201740529 March 2017Final Significance Determination for a Security-Related Green Finding; NRC Security Inspection Report 05000482/2017405 (Letter Without Enclosure)Significance Determination Process
Affidavit
ML17093A66527 March 2017Report on Financial Protection Levels
WO 17-0023, Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) Report27 March 2017Submittal of Technical Specification 5.6.8 - Post Accident Monitoring (PAM) ReportPost Accident Monitoring
ML17024A24124 March 2017Issuance of Amendment No. 217 Revision to the Cyber Security Plan Implementation ScheduleEnforcement Discretion
Cyber Security
WO 17-0026, Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses22 March 2017Errata for License Amendment Request for Transition to Westinghouse Core Design and Safety Analyses
ML17088A33122 March 2017Transmittal of the Kansas Water Pollution Control Permit and Authorization to Discharge Under the National Pollutant Discharge Elimination SystemUltimate heat sink
Grab sample
Zebra Mussel
ML17087A26921 March 201710 CFR 50.46 Annual Report of Emergency Core Cooling System (ECCS) Evaluation Model Changes
TAC:D9236816 March 2017
WO 17-0013, Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level Scheme16 March 2017Response to Request for Additional Information Regarding License Amendment Request for Adopting Revised Emergency Action Level SchemeSafe Shutdown
Time of Discovery
High winds
Reactor Vessel Water Level
Ultimate heat sink
Offsite Dose Calculation Manual
Fire Barrier
Time to boil
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Operator Manual Action
Spent Fuel Pool Instrumentation
Earthquake
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Grace period
Power change
ML17033A34015 March 2017Wolf Creek Generating Station - Flood Hazard Mitigation Strategies Assessment (CAC No. MF7992)Flood Hazard Mitigation Strategies Assessment
ML17079A23313 March 2017Revision of Three Forms That Implement the Radiological Emergency Response Plan (RERP)
ML17151B0189 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 18.0, Response to NUREG-0737, Clarification of TMI Action Plan Requirements.Safe Shutdown
Boric Acid
Reactor Vessel Water Level
Loop seal
High Radiation Area
Ultimate heat sink
Non-Destructive Examination
Grab sample
Fire Barrier
Anticipated operational occurrence
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Incorporated by reference
Aging Management
Pressure and Temperature Limits Report
License Renewal
Earthquake
Control of Heavy Loads
Fuel cladding
Biofouling
Fire Protection Program
ML17151B0009 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 5.0, Reactor Coolant System and Connected SystemsBoric Acid
Loop seal
Stroke time
Safe Shutdown Earthquake
Weld Overlay
Hydrostatic
Operating Basis Earthquake
Nondestructive Examination
Incorporated by reference
Pressure and Temperature Limits Report
Fuel cladding
Liquid penetrant
Pressure Boundary Leakage
Dissimilar Metal Weld
Scaffolding
Power change
ML17151B0629 March 2017Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, B7-80 to B8-147Safe Shutdown
Fire Barrier
Fire Protection Program
ML17151B0809 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 11, Figures 11.2-1-01 Through 11.4-1-04
ML17073A1119 March 2017Submittal of Seismic High Frequency Confirmation, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima...Fukushima Dai-Ichi
ML17073A0939 March 2017Changes to Technical Specification Bases - Revisions 74 and 75Safe Shutdown
Anticipated operational occurrence
Foreign Material Exclusion
Offsite Circuit
ML17151B0659 March 2017Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, G1A-64 to G1A-123Fire Barrier
ML17151B0059 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 8.0, Electric PowerHot Short
Safe Shutdown
Boric Acid
Fire Barrier
Temporary Modification
Emergency Lighting
Incorporated by reference
Open Phase Condition
ML17151B0649 March 2017Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, B13-26 to G1A-63Safe Shutdown
Boric Acid
Fire Barrier
Coatings
Fire Protection Program
ML17151B0539 March 2017Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W01, B1-99 to B2-40Safe Shutdown
Fire Barrier
Fire Protection Program
ML17151B0719 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 6, Figures 6.2.2-1-00 Through 6.3-1-04
ML17151B0689 March 2017Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, G2B1 to G2B79Boric Acid
Fire Barrier
ML17151B0159 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 16.0, Relocated Technical SpecificationsIncorporated by reference
ML17151B0739 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 1, Figures 1.1-1-01 - 1.2-44
ML17151B0199 March 2017Revision 30 to Updated Final Safety Analysis Report, Responses to Questions 005.1 Through 031.20Hot Short
Safe Shutdown
Boric Acid
Shutdown Margin
High Radiation Area
Ultimate heat sink
Anticipated operational occurrence
Tornado Missile
Internal Flooding
Hydrostatic
Coatings
Emergency Lighting
Earthquake
Turbine Missile
ML17151B0529 March 2017Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, CS to B1-98 - RedactedSafe Shutdown
Fire Barrier
Coatings
Fire Protection Program
ML17151B0769 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 8, Figures 8.2-3 Through 8.3-7-00
ML17151B0729 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 7, Figures 7.2-1-01 Through 7.6-4-2
ML17151B0169 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 17.0, Quality Assurance
ML17151B0619 March 2017Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, B6-3 to B7-79Safe Shutdown
Fire Barrier
Fire Protection Program
ML17151A9929 March 2017Revision 30 to Updated Final Safety Analysis Report, Cover Page
ML17151B0029 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 6.0, Engineered Safety FeaturesSafe Shutdown
Boric Acid
Packing leak
Ultimate heat sink
Stroke time
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Nondestructive Examination
Emergency Lighting
Incorporated by reference
Tornado Missile Protection
Thermoset
Frazil ice
Earthquake
Power-Operated Valves
Fuel cladding
Liquid penetrant
Scaffolding
ML17151B0559 March 2017Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, G3D-27 to G4D-19Safe Shutdown
Boric Acid
Fire Barrier
Coatings
Fire Protection Program
ML17151B0339 March 2017E-1F9900, Rev. 9, Post-Fire Safe Shutdown Operator Manual Actions, RedactedHot Short
Safe Shutdown
Fire Barrier
Enforcement Discretion
Fire impairment
Operator Manual Action
Multiple Spurious Operation
Arc flash
Emergency Lighting
Incorporated by reference
Significance Determination Process
Thermoset
Continuous fire watch
Fire Protection Program
Fire Watch
ML17151B0609 March 2017Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05, B2-41 to B6-2Safe Shutdown
Fire Barrier
Fire Protection Program
ML17151B0579 March 2017Fire Protection Evaluations for Unique or Unbounded Fire Barrier Configuration, M-663-00017A, Rev. W05-01Fire Barrier
ML17151A9979 March 2017Wolf Creek Revision 30 to Updated Final Safety Analysis Report, Chapter 3.0, Design of Structures, Components, Equipment, and Systems
ML17151B0089 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 10.0, Steam and Power Conversion SystemSafe Shutdown
Offsite Dose Calculation Manual
Tornado Missile
Hydrostatic
Incorporated by reference
Fast acting solenoid valve
Earthquake
Power-Operated Valves
Turbine Missile
WO 17-0045, Revision 30 to Updated Final Safety Analysis Report, Chapter 18, Figures18.2-15-009 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 18, Figures18.2-15-00
ML17151B0099 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 11.0, Radioactive Waste ManagementSafe Shutdown
Boric Acid
Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Tornado Missile
Hydrostatic
Incorporated by reference
Annual Radioactive Effluent Release Report
Process Control Program
Earthquake
ML17151B0039 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 7.0, Instrumentation and ControlsSafe Shutdown
Boric Acid
Shutdown Margin
Reactor Vessel Water Level
Ultimate heat sink
Grab sample
Anticipated operational occurrence
Water Inventory Control
Met Tower
Temporary Modification
Incorporated by reference
Earthquake
Fuel cladding
Pressure Boundary Leakage
Power change
ML17151A9939 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 1.0, Introduction and General Description of the PlantSafe Shutdown
Boric Acid
Ultimate heat sink
Grab sample
Offsite Dose Calculation Manual
Fire Barrier
Tornado Missile
Safe Shutdown Earthquake
Hydrostatic
Coatings
Operating Basis Earthquake
Incorporated by reference
Safeguards Contingency Plan
Earthquake
Fuel cladding
Fire Protection Program
Overexposure
ML17151B0109 March 2017Revision 30 to Updated Final Safety Analysis Report, Chapter 12.0, Radiation Protection
ML17151B0209 March 2017Revision 30 to Updated Final Safety Analysis Report, List of Effective Pages
ML17151B0459 March 2017Equipment Qualification Summary Document, Master List Section II, EQSD-II, Rev 28, Part 2 - RedactedBoric Acid
Ultimate heat sink