ML17073A111
| ML17073A111 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 03/09/2017 |
| From: | Mccoy J Wolf Creek |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17073A148 | List: |
| References | |
| ET 17-0005 | |
| Download: ML17073A111 (3) | |
Text
Jaime H. McCoy Vice President Engineering U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 March 9, 2017 ET 17-0005
Reference:
Letter dated March 12, 2012, from E. J. Leeds and M. R. Johnson, USNRC, to M. W. Sunseri, WCNOC, "Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force (NTTF)
Review of Insights from the Fukushima Dai-ichi Accident"
Subject:
Docket No. 50-482: Seismic High Frequency Confirmation for Wolf Creek Generating Station (WCGS), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near -
Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Gentlemen:
On March 12, 2012, the Nuclear Regulatory Commission (NRC) issued the reference to Wolf Creek Nuclear Operating Corporation (WCNOC).
The Enlcosure to this letter provides requested information to address the High Frequency Confirmation requirements of Item (4),, Recommendation 2.1: Seismic, of the reference. The Attachment to this letter contains the commitment discussed in the Enclosure.
If you have any questions concerning this matter, please contact me at (620) 364-4156, or Cynthia R. Hafenstine (620) 364-4204.
JHM/rlt Attachment Enclosure cc:
K. M. Kennedy (NRC), w/a, w/e B. K. Singal (NRC), w/a, w/e N. H. Taylor (NRC), w/a, w/e Senior Resident Inspector (NRC), w/a, w/e Sincerely, q~ )-! °ltJH'f Jaime H. McCoy P.O. Box 411 I Burlington, KS 66839 I Phone: (620) 364-8831 An Equal Opportunity Employer M/F/HCNET
Attachment to ET 17-0005 Page 1of1 LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Wolf Creek Nuclear Operating Corporation (WCNOC) in this document. Any other statements in this letter are provided for information purposes and are not considered regulatory commitments. Please direct questions regarding these commitments to Cynthia R. Hafenstine, Manager Regulatory Affairs at Wolf Creek Generating Station, (620) 364-4204.
REGULATORY COMMITMENT DUE DATE WCNOC will provide documentation of seismic acceptability of the No later than 30 days 38 components requiring resolution, as identified in Table.B-1 of following completion of the Seismic High Frequency Confirmation Report, by analytical, Refueling Outage 22, testing, or recommended action approaches.
spring 2018
Enclosure to ET 17-0005 50.54(f) NTTF 2.1 Seismic High Frequency Confirmation for WCGS (67 pages)