ML17061A050 | 31 March 2017 | Issuance of Amendment No. 258 Adoption of TSTF-425, Revision 3, | Shutdown Margin Reactor Vessel Water Level High Radiation Area Post Accident Monitoring Internal Flooding Hydrostatic Probabilistic Risk Assessment Squib Cyber Security Incorporated by reference Pressure and Temperature Limits Report Surveillance Frequency Control Program Annual Radiological Environmental Operating Report Process Control Program Large early release frequency Spiral reload Overtravel Deep Dose Equivalent Pressure Boundary Leakage Offsite Circuit Fire Protection Program Backfit |
NLS2017032, 10 CFR 50.55a Request Number RI-21, Revision 1 | 29 March 2017 | 10 CFR 50.55a Request Number RI-21, Revision 1 | VT-2 Liquid penetrant |
CAC:MF9623 | 29 March 2017 | | |
ML17104A299 | 28 March 2017 | Submittal of Emergency Plan Implementing Procedure | |
ML17090A397 | 28 March 2017 | Part-21 Notification - Willful Misconduct and Falsification of Records | VT-2 |
NLS2017030, Report of Change and Summary of 50.54(q) Analysis - Emergency Plan Implementing Procedure 5.7.27, Revision 18 | 28 March 2017 | Report of Change and Summary of 50.54(q) Analysis - Emergency Plan Implementing Procedure 5.7.27, Revision 18 | |
ML17100A179 | 28 March 2017 | Report of Change and Summary of 50.54(q) Analysis - Emergency Plan Implementing Procedure 5.7.27, Revision 18, Alert and Notification System. | |
ML17100A177 | 28 March 2017 | Submittal of Change to Emergency Plan Implementing Procedure. Submits EPIP 5.7.27, Revision 18, Alert and Notification System. | |
NLS2017031, Submittal of Decommissioning Funding | 27 March 2017 | Submittal of Decommissioning Funding | Decommissioning Funding Plan |
NLS2017037, 2017-03 Post Exam Comments & Analysis | 24 March 2017 | 2017-03 Post Exam Comments & Analysis | |
ML17079A256 | 20 March 2017 | NCP-2017-005 Regarding LAR to Implement TSTF 425 | |
ML17081A453 | 20 March 2017 | Part 21 - Plastic Jar Dedication Sampling | |
ML17122A079 | 16 March 2017 | 2017-03 Proposed Operating Test Comments | Fuel cladding Power change |
ML18046B440 | 16 March 2017 | 2017-03 Public Forms | |
ML17122A087 | 16 March 2017 | 2017-03 Final Written Exam | Time of Discovery Shutdown Margin High Radiation Area Fire Barrier Internal Flooding FLEX Earthquake Pressure Boundary Leakage Offsite Circuit Continuous fire watch Fire Protection Program Fire Watch Hourly Fire Watch Power change |
ML17122A086 | 16 March 2017 | 2017-03 Final Outlines | Half scram Scram Discharge Volume Fuel cladding Offsite Circuit |
ML17122A085 | 16 March 2017 | 2017-03 Final Operating Test | Unanalyzed Condition Fitness for Duty Half scram Grab sample Stroke time Water Inventory Control Squib Job Performance Measure Scram Discharge Volume Fuel cladding Power change |
ML17122A084 | 16 March 2017 | 2017-03 Proposed Written Exam | Time of Discovery Shutdown Margin High Radiation Area Internal Flooding FLEX Earthquake Pressure Boundary Leakage Offsite Circuit Power change |
ML17122A083 | 16 March 2017 | 2017-03 Proposed Written Exam Comments | Continuous fire watch |
ML17122A082 | 16 March 2017 | 2017-03 Proposed Outlines | Half scram Scram Discharge Volume Fuel cladding Offsite Circuit |
ML17122A081 | 16 March 2017 | 2017-03 Proposed Outline Comments | Time Critical Operator Action |
ML17122A080 | 16 March 2017 | 2017-03 Proposed Operating Test | Unanalyzed Condition Fitness for Duty Half scram Grab sample Stroke time Temporary Modification Squib Job Performance Measure Scram Discharge Volume Fuel cladding Through-Wall Leakage Power change |
NLS2017026, Emergency Plan, Revision 69 | 14 March 2017 | Emergency Plan, Revision 69 | Safe Shutdown Time of Discovery Health Physics Network High winds Fire Barrier Earthquake Deep Dose Equivalent Pressure Boundary Leakage Minimum staff Inadvertent Siren Activation Siren |
ML17079A009 | 14 March 2017 | Submittal of Emergency Plan, Revision 69 | |
Press Release-IV-17-003, NRC Will Conduct a Special Inspection at Cooper Nuclear Station | 6 March 2017 | Press Release-IV-17-003: NRC Will Conduct a Special Inspection at Cooper Nuclear Station | |
ML16313A282 | 3 March 2017 | Staff Review of Spent Fuel Pool Evaluation Associated with Reevaluated Seismic Hazard Implementing Near-Term Task Force Recommendation 2.1 | Safe Shutdown Safe Shutdown Earthquake Fukushima Dai-Ichi |
ML17094A516 | 3 March 2017 | NRC Initial Operator Licensing Examination Approval 05000298/2017301 | |
CAC:MF9133 | 2 March 2017 | | |
ML17062A483 | 2 March 2017 | NRR E-mail Capture - Cooper Nuclear Station - Acceptance of Requested Licensing Action Request to Extend Submittal Date for Surveillance Capsule Test Report | |
NLS2017025, Property Insurance Coverage | 1 March 2017 | Property Insurance Coverage | |
IR 05000298/2016006 | 1 March 2017 | Annual Assessment Letter for Cooper Nuclear Station (Report 05000298/2016006) | B.5.b Mitigating Strategies |
IR 05000298/2016402 | 1 March 2017 | Non-Public Security Inspection Plan for Cooper Nuclear Station (Nuclear Regulatory Commission Physical Security Inspection Report Number 05000298/2016402) - Letter Only | |
ML17055A442 | 24 February 2017 | Single Positive Test Form Collected on 09/07/2016 | |
ML17039A892 | 23 February 2017 | Withdrawal of Relief Request Fifth 10-Year Inservice Inspection Interval, RR5-02, Deferral of Service Water System Repair | |
CAC:MF3734 | 8 February 2017 | | |
NLS2017012, Response to NRC Request for Information Regarding Near Term Task Force Recommendation 2.1 (Seismic) - Spent Fuel Pool Evaluation Report | 8 February 2017 | Response to NRC Request for Information Regarding Near Term Task Force Recommendation 2.1 (Seismic) - Spent Fuel Pool Evaluation Report | Safe Shutdown Fukushima Dai-Ichi |
NLS2017016, Request to Withdraw 10 CFR 50.55a Request No. RR5-02 | 2 February 2017 | Request to Withdraw 10 CFR 50.55a Request No. RR5-02 | |
NLS2017006, Inservice Inspection OAR-1 Owner'S Activity Report | 2 February 2017 | Inservice Inspection OAR-1 Owner'S Activity Report | Through Wall Leak |
IR 05000298/2016004 | 26 January 2017 | NRC Integrated Inspection Report 05000298/2016004 and Exercise of Enforcement Discretion | Reactor Vessel Water Level High Radiation Area Stroke time Enforcement Discretion Fire impairment Functionality Assessment Locked High Radiation Area Significance Determination Process Excess Flow Check Valve Operability Determination Fire Protection Program Fire Watch Scaffolding Substantial potential for an overexposure Overexposure |
ML17026A414 | 20 January 2017 | C&D Technologies, Inc. - Part 21 - Plastic Jar Dedication Sampling | |
NLS2017011, Revised Operator Licensing Examination Data | 19 January 2017 | Revised Operator Licensing Examination Data | Generic Fundamentals Examination |
ML17017A485 | 17 January 2017 | Cooper Nuclear Station - NRC Emergency Preparedness Annual Inspection Report 05000298/2016501 (Cover Letter Only) | |
ML17013A548 | 13 January 2017 | Generic Fundamentals Section of the Written Operator Licensing Examination Scheduled for 2017 | Generic Fundamentals Examination |
NLS2017005, Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2016 | 13 January 2017 | Annual Report of Changes and Errors in Emergency Core Cooling System Evaluation Models for 2016 | |
ML17018A151 | 9 January 2017 | Submittal of Pressure and Temperature Limits Report, Revision 1 | Pressure and Temperature Limits Report |
05000298/LER-2016-008 | 5 January 2017 | Purchase and Installation of Incorrect Actuator Results in a Condition Prohibited by Technical Specifications LER 16-008-00 for Cooper Nuclear Station Regarding Purchase and Installation of Incorrect Actuator Results in a Condition Prohibited by Technical Specifications | |
NLS2016070, Completion of Required Action by NRC Order EA-12-049 - Mitigation Strategies for Beyond-Design-Basis External Events | 4 January 2017 | Completion of Required Action by NRC Order EA-12-049 - Mitigation Strategies for Beyond-Design-Basis External Events | Safe Shutdown High winds Shutdown Margin Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Emergency Lighting Functionality Assessment FLEX Tornado Generated Missile Fukushima Dai-Ichi Design basis earthquake Spent Fuel Pool Instrumentation Frazil ice B.5.b Mitigating Strategies Earthquake |