ML17104A299

From kanterella
Jump to navigation Jump to search
Submittal of Emergency Plan Implementing Procedure
ML17104A299
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/28/2017
From: Shaw J
Nebraska Public Power District (NPPD)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML17104A308 List:
References
NLS2017030
Download: ML17104A299 (2)


Text

Nebraska Public Power District NLS2017030 March 28, 2017 U.S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, D.C. 20555-0001 Always there when you need us

Subject:

Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46

Dear Sir or Madam:

50.54(q) The purpose of this letter is to report a change to the following Emergency Plan Implementing Procedure (EPIP) and provide a summary of the associated 10 CFR 50.54(q) analysis for the changes to the EPIP: EPIP 5.7.27 Revision 18 Alert and Notification System

  • This letter contains no commitments.

If you have any questions regarding this submittal, please contact me at ( 402) 825-2788.

Sincerely, Licensing Manager /bk

Attachment:

Report of Change and Summary of 50.54(q) Analysis -Emergency Plan Implementing Procedure 5.7.27, Revision 18

Enclosure:

Emergency Plan Implementing Procedure 5.7.27, Revision 18 COOPER NUCLEAR STATION P.O. Box 98 /Brownville, NE 68321-0098 Telephone:

{402) 825-3811 /Fax: (402) 825-5211 .www.nppd.com NLS2017030 Page 2 of2 cc: Regional Administrator, w/ attachment and enclosure (2) USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment (enclosure per controlled document distribution)

USNRC-CNS NPG Distribution, w/ attachment and w/o enclosure CNS Records, w/ attachment and w/o enclosure

---_ ___J