Category:Emergency Preparedness-Emergency Plan
MONTHYEARNLS2022055, Emergency Plan, Revision 812023-01-0404 January 2023 Emergency Plan, Revision 81 NLS2022037, Emergency Plan, Revision 80, Summary of 50.54(q) Analyses2022-08-18018 August 2022 Emergency Plan, Revision 80, Summary of 50.54(q) Analyses NLS2022035, Evacuation Time Estimate Report for Cooper Nuclear Station2022-08-16016 August 2022 Evacuation Time Estimate Report for Cooper Nuclear Station ML21307A3102021-11-0303 November 2021 Emergency Plan, Revision 79 NLS2021064, Submittal of Revision 79 to Emergency Plan2021-11-0303 November 2021 Submittal of Revision 79 to Emergency Plan NLS2021053, Emergency Plan Implementing Procedure2021-08-30030 August 2021 Emergency Plan Implementing Procedure NLS2021040, Submittal of Emergency Plan, Revision 77 and Summary of 50.54( Q) Analysis2021-06-14014 June 2021 Submittal of Emergency Plan, Revision 77 and Summary of 50.54( Q) Analysis ML21130A6002021-05-10010 May 2021 On-Shift Staffing Analysis, Revision 3 NLS2021001, Emergency Plan, Revision 76, On-Shift Staffing Analysis, Revision 2, and Emergency Plan Implementing Procedures2021-01-0606 January 2021 Emergency Plan, Revision 76, On-Shift Staffing Analysis, Revision 2, and Emergency Plan Implementing Procedures NLS2020051, Response to Nuclear Regulatory Commission'S Supplemental Request for Additional Information for License Amendment Request for Approval of Emergency Action Level Scheme Change2020-08-25025 August 2020 Response to Nuclear Regulatory Commission'S Supplemental Request for Additional Information for License Amendment Request for Approval of Emergency Action Level Scheme Change NLS2020022, Submittal of Emergency Plan Implementing Procedures2020-04-28028 April 2020 Submittal of Emergency Plan Implementing Procedures ML20115E3592020-04-0909 April 2020 Emergency Plan, Revision 75 NLS2020014, Nebraska Public Power District - Report of Changes to Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-462020-03-0303 March 2020 Nebraska Public Power District - Report of Changes to Emergency Plan Implementing Procedure Cooper Nuclear Station, Docket No. 50-298, DPR-46 NLS2019010, Emergency Plan, Revision 722019-02-22022 February 2019 Emergency Plan, Revision 72 NLS2018036, Summary of 50.54(q) Analyses of Emergency Plan, Revision 712018-06-14014 June 2018 Summary of 50.54(q) Analyses of Emergency Plan, Revision 71 ML18044A1092018-02-0606 February 2018 Summary of 50.54(q) Analyses, Emergency Plan, Revision 70 NLS2018005, Submittal of Emergency Plan, Revision 702018-02-0606 February 2018 Submittal of Emergency Plan, Revision 70 NLS2017026, Emergency Plan, Revision 692017-03-14014 March 2017 Emergency Plan, Revision 69 ML17079A0092017-03-14014 March 2017 Submittal of Emergency Plan, Revision 69 NLS2013066, Emergency Plan, Revision 642013-06-24024 June 2013 Emergency Plan, Revision 64 ML0619404222006-07-0707 July 2006 Information on Protective Action Areas and Evacuation Routes NLS2005006, Change to Emergency Plan Implementing Procedure2005-01-28028 January 2005 Change to Emergency Plan Implementing Procedure NLS2004066, Emergency Plan, Revision 462004-05-10010 May 2004 Emergency Plan, Revision 46 2023-01-04
[Table view] Category:Letter
MONTHYEARIR 05000298/20240022024-07-25025 July 2024 Integrated Inspection Report 05000298/2024002 ML24183A1722024-07-17017 July 2024 Issuance of Amendment No. 277 to Adopt TSTF-374, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil ML24197A1462024-07-15015 July 2024 NRC Region IV Ltr to Cooper Nuclear Station Re FEMA Level 1 Finding ML24134A1782024-07-0303 July 2024 Issuance of Amendment No. 276 Revision to Technical Specification 3.8.3, Diesel Fuel Oil, Lube Oil and Starting Air, to Allow for Cleaning, Inspection and Any Needed Repairs During Refuel Outage 33 ML24197A0682024-06-24024 June 2024 FEMA Ltr to Missouri State Emergency Management Agency - Level 1 Finding, 24 June 2024 ML24192A0112024-06-13013 June 2024 2024-06-Post Exam Comments IR 05000298/20244012024-06-0404 June 2024 Security Baseline Inspection Report 05000298/2024401 IR 05000298/20243012024-05-30030 May 2024 NRC Initial Operator Licensing Examination Approval 05000298/2024301 ML24137A0942024-05-17017 May 2024 Regulatory Audit Plan in Support of License Amendment Request to Modify Allowable Value Regarding Technical Specification for High Pressure Coolant Injection Pump Discharge Low Flow IR 05000298/20240012024-05-0303 May 2024 Integrated Inspection Report 05000298/2024001 ML24129A0952024-04-25025 April 2024 Preparation and Scheduling of Operator Licensing Examinations IR 05000298/20240102024-04-24024 April 2024 Comprehensive Engineering Team Inspection Report 05000298/2024010 ML24096A1202024-04-0505 April 2024 Issuance of Amendment No. 275 Revision to Technical Specification 3.3.1.1 (Emergency Circumstances) ML24093A2282024-04-0202 April 2024 Notice of Enforcement Discretion for Cooper Nuclear Station IR 05000298/20240902024-04-0101 April 2024 – Notice of Violation, NRC Inspection Report 05000298/2024090 IR 05000298/20230062024-02-28028 February 2024 Annual Assessment Letter for Cooper Nuclear Station - Report 05000298/2023006 ML24033A3092024-02-12012 February 2024 Summary of Regulatory Audit Regarding the Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230042024-02-12012 February 2024 Integrated Inspection Report 05000298/2023004 IR 05000298/20230122024-02-12012 February 2024 NRC Inspection Report 05000298/2023012 ML23334A2012024-01-0303 January 2024 Issuance of Amendment No. 274 Revision to Technical Specifications to Adopt TSTF-551, Revision 3, Revise Secondary Containment Surveillance Requirements ML23311A1122023-11-0909 November 2023 Project Manager Assignment ML23311A2082023-11-0909 November 2023 Reassignment of U.S. Nuclear Regulatory Commission Branch Chief in the Division of Operating Reactor Licensing for Plant Licensing Branch IV IR 05000298/20230032023-11-0202 November 2023 Integrated Inspection Report 05000298/2023003 IR 05000298/20234012023-11-0101 November 2023 Cyber Security Report 05000298/2023401 Public ML23264A8052023-10-11011 October 2023 Issuance of Amendment No. 273 Revision to Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML23233A1882023-09-0505 September 2023 Regulatory Audit Plan in Support of Relief Request RC3-02 Regarding Drywell Head Bolting IR 05000298/20230052023-08-21021 August 2023 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2023005)- Mid Cycle Letter IR 05000298/20230022023-08-0808 August 2023 Integrated Inspection Report 05000298/2023002 ML23214A2742023-08-0303 August 2023 Nuclear Station - Notification of Inspection (NRC Inspection Report 05000298/2023004) and Request for Information IR 05000298/20234022023-08-0303 August 2023 NRC Security Inspection Report 05000298/2023402 IR 05000298/20234202023-08-0101 August 2023 Security Baseline Inspection Report 05000298/2023420 ML23173A0862023-06-26026 June 2023 Information Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000298/2023401 IR 05000298/20230102023-05-17017 May 2023 Biennial Problem Identification and Resolution Inspection Report 05000298/2023010 IR 05000298/20234032023-05-0404 May 2023 Security Baseline Inspection Report 05000298/2023403 ML23129A2822023-04-20020 April 2023 Submittal of Revision 31 to Updated Safety Analysis Report ML23102A0282023-04-19019 April 2023 U.S. Nuclear Regulatory Commission Presentation at the May 8, 2023, Brownville Village Meeting IR 05000298/20230012023-04-17017 April 2023 Integrated Inspection Report 05000298/2023001 ML23060A1582023-03-0808 March 2023 Design Basis Assurance Inspection (Programs) Inspection Report 05000298/2023001 IR 05000298/20220062023-03-0101 March 2023 Annual Assessment Letter for Cooper Nuclear Station Report 05000298/2022006 ML23041A1622023-02-10010 February 2023 Licensed Operator Positive Fitness-for-Duty Test Request for Additional Information IR 05000298/20220042023-01-30030 January 2023 Integrated Inspection Report 05000298/2022004 IR 05000298/20220112022-12-23023 December 2022 License Renewal Phase 4 Inspection Report 05000298/2022011 ML22286A2072022-11-30030 November 2022 Issuance of Amendment No. 272 Revision to Technical Specifications to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements IR 05000298/20220032022-10-27027 October 2022 Integrated Inspection Report 05000298/2022003 ML22304A0052022-10-26026 October 2022 Surveillance Capsule Location (Re-insertion Into the Reactor Vessel) IR 05000298/20223022022-10-20020 October 2022 NRC Initial Operator Licensing Examination Approval 05000298/2022302 ML22276A1562022-10-0505 October 2022 Notification of Commercial Grade Dedication Inspection 05000298/2023011 and Request for Information IR 05000298/20224022022-09-29029 September 2022 NRC Security Inspection Report 05000298/2022402 (Full Report) IR 05000298/20220052022-08-18018 August 2022 Updated Inspection Plan for Cooper Nuclear Station (Report 05000298 2022005) IR 05000298/20223012022-08-10010 August 2022 NRC Examination Report 05000298/2022301 2024-07-03
[Table view] |
Text
( N Nebraska Public Power District Always there when you need us 50.54(q) NLS2017026 March 14, 2017 U.S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C. 20555-0001
Subject:
Emergency Plan, Revision 69 Cooper Nuclear Station, Docket No. 50-298, DPR-46
Dear Sir or Madam:
( The purpose of this letter is to transmit Revision 69 of the Cooper Nuclear Station Emergency Plan (enclosed) in accordance with the provisions of 10 CFR 50.54( q). Revision 69 was made effective on February 28, 2017. The changes made per this revision do not represent a reduction in plan effectiveness.
In addition, as required by 10 CFR 50.54( q)( 5), attached is a summary of the associated 10 CFR 50.54( q) analyses for the changes* to the Emergency Plan. This letter contains no regulatory commitments.
Should you have any questions regarding this submittal, please contact Jim Stough, Emergency Preparedness Manager, at (402) 825-5201.
/dv
Attachment:
Summary of 50.54( q) Analyses, Cooper Nuclear Station Emergency Plan, Revision 69
Enclosure:
Cooper Nuclear Station Emergency Plan, Revision 69 COOPER NUCLEAR STATION P.O. Box 98 /Brownville, NE 68321-0098 Telephone:
(402) 825-3811 /Fax: (402) 825-5217 www.nppd.com NLS2017026 Page 2 of2 cc: Regional Administrator w/ attachment and enclosure (2) USNRC -Region IV Director, Spent Fuel Project Office, w/ attachment and enclosure Office of Nuclear Material Safety and Safeguards Senior Resident Inspector, w/ attachment and enclosure (per controlled document distribution)
USNRC-CNS NPG Distribution w/o attachment and enclosure CNS Records w/ attachment and enclosure