Issue date | Title | Topic | |
---|---|---|---|
PNO-III-07-016, Prairie Island, Unplanned Unit 1 Shutdown Greater than 72 Hours | 26 December 2007 | PNO-III-07-016: Prairie Island, Unplanned Unit 1 Shutdown Greater than 72 Hours | |
TAC:MD6294 | 21 December 2007 | ||
ML073531827 | 21 December 2007 | Notice of Meeting with Nuclear Management Company Re Issues Related to the Proposed Combined Emergency Plan for Monticello and Prairie Island | |
IR 05000282/2007006 | 21 December 2007 | Boric Acid High Radiation Area Fire Barrier Past operability Met Tower Temporary Modification Locked High Radiation Area Fire Watch Scaffolding Siren | |
ML073540280 | 19 December 2007 | Change to the Inspection Plan 1/1/08 - 12/31/08 | |
ML073340526 | 14 December 2007 | License Amendment Revise Technical Specifications in Support of Containment Sump Resolution | Coatings Operating Basis Earthquake Design basis earthquake |
ML073520400 | 14 December 2007 | Technical Specifications in Support of Containment Sump Resolution | |
L-PI-07-099, Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3 Operability Requirements for Safety Injection (SI) Subsystem | 13 December 2007 | Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3 Operability Requirements for Safety Injection (SI) Subsystem | |
L-PI-07-074, .59 Evaluation Summary Report | 10 December 2007 | .59 Evaluation Summary Report | Loop seal Fire Barrier |
L-PI-07-093, Request for Extension of Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | 5 December 2007 | Request for Extension of Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. | Safe Shutdown Earthquake Coatings |
ML073240244 | 3 December 2007 | Clarification Letter for Gothic (TAC MC4245 and MC4246) | GOTHIC |
ML073340942 | 30 November 2007 | Units 1 and 2 - Revision to Correspondence Mailing List for Nuclear Management Company, LLC and Contact Information for Electronic Distribution of Correspondence | |
IR 05000282/2007404 | 23 November 2007 | IR 05000282-07-404, (Drs), IR 05000306-07-404, (Drs), 10/15/2007 - 10/19/2007, Prairie Island Nuclear Generating Plant (Pingp), Units 1 and 2, Routine Security Baseline Inspection - Cover Letter Only | Significance Determination Process |
L-PI-07-087, Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3 Operability Requirements for Safety Injection (SI) Subsystem | 19 November 2007 | Supplement to License Amendment Request (LAR) to Revise Technical Specification (TS) 3.5.3 Operability Requirements for Safety Injection (SI) Subsystem | |
L-PI-07-086, License Amendment Request (LAR) to Revise Containment Spray Nozzle Surveillance Requirements (SR) | 19 November 2007 | License Amendment Request (LAR) to Revise Containment Spray Nozzle Surveillance Requirements (SR) | Foreign Material Exclusion |
L-HU-07-029, Generic Letter 2003-01, Control Room Habitability, Commitment Change | 14 November 2007 | Generic Letter 2003-01, Control Room Habitability, Commitment Change | |
L-PI-07-085, Supplement to License Amendment Request (LAR) to Revise Technical Specifications (TS) in Support of Containment Sump Resolution | 13 November 2007 | Supplement to License Amendment Request (LAR) to Revise Technical Specifications (TS) in Support of Containment Sump Resolution | Coatings |
IR 05000282/2007004 | 13 November 2007 | IR 05000282-07-004, 05000306-07-004; 07/01/07 - 09/30/07; Prairie Island Nuclear Generating Plant, Units 1 and 2; Routine Baseline Inspection Report | Safe Shutdown Boric Acid Ultimate heat sink Fire Barrier Internal Flooding Temporary Modification Significance Determination Process Operability Determination Fire Protection Program |
ML072780026 | 31 October 2007 | Relief Request from ASME Code, Section X1, Inservice Inspection Program Relief Requests Nos. 1-RR-4-7 and 2-RR-4-7 | VT-2 Incorporated by reference Through-Wall Leak |
ML072840354 | 31 October 2007 | Tech Spec Page for Amendments 181 and 171, Revise TS 3.7.2 Main Steam Valves Closure Times by Relocating the Isolation Valve Closure Times to a Licensee-Controlled Document Identified as a Bases Reference | |
TAC:MD3809 | 31 October 2007 | ||
ML072770295 | 31 October 2007 | License Amendments 181 and 171, Revise TS 3.7.2 Main Steam Valves Closure Times by Relocating the Isolation Valve Closure Times to a Licensee-Controlled Document Identified as a Bases Reference | |
ML073020375 | 30 October 2007 | Temporary Branch Chief Reassignment | |
ML073310572 | 30 October 2007 | Email from Dale M. Vincent to Mahesh Chawla Gothic SE Clarification | |
L-PI-07-077, Nonfiction of Change to Commitment Made in the Prairie Island Nuclear Generating Plant (PINGP) 30-Day Response to NRC Bulletin 2003-02 | 29 October 2007 | Nonfiction of Change to Commitment Made in the Prairie Island Nuclear Generating Plant (PINGP) 30-Day Response to NRC Bulletin 2003-02 | |
TAC:MD7217 | 29 October 2007 | ||
L-PI-07-075, License Amendment Request (LAR) to Add a Power Factor to the Emergency Diesel Generators' (EDG) 24-Hour Load Test (Surveillance Requirements 3.8.1.9) | 29 October 2007 | License Amendment Request (LAR) to Add a Power Factor to the Emergency Diesel Generators' (EDG) 24-Hour Load Test (Surveillance Requirements 3.8.1.9) | |
TAC:MD6551 | 29 October 2007 | ||
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML072980664 | 24 October 2007 | Meeting Presentation on Update on Generic Safety Issue 191 Plant Audits | |
ML073310575 | 23 October 2007 | Email from M Chawla to Dale Vincent LAR to Revise Containment Sump Resolution | |
L-PI-07-079, Core Operating Limits Report (Colr), Unit 2 Cycle 24, Revision 2 | 19 October 2007 | Core Operating Limits Report (Colr), Unit 2 Cycle 24, Revision 2 | Shutdown Margin |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML072760239 | 3 October 2007 | Dennis Koehl Named New Chief Nuclear Officer of Nuclear Management Company (Nmc); Jim Mccarthy Named Interim Site Vice-President at Point Beach Nuclear Plant | |
ML072680590 | 27 September 2007 | Review of the 2006 Steam Generator Tube Inspection Report for Prairie Island Nuclear Generating Plant, Unit 1 | |
ML072690050 | 24 September 2007 | Email Two Issues at Prairie Island | |
ML072750470 | 21 September 2007 | MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 | Commercial Grade Dedication |
ML072570293 | 20 September 2007 | Ro/Sro 2007 Initial Exam and Answer Key | Boric Acid Shutdown Margin Offsite Dose Calculation Manual Severe Accident Management Guideline |
IR 05000282/2007301 | 20 September 2007 | Er 05000282-07-301 (Drs); 05000306-07-301 (Drs); 07/30/07 - 08/06/07; Prairie Island Nuclear Generating Plant, Units 1 and 2; Initial License Examination Report | Job Performance Measure |
ML073310580 | 18 September 2007 | E-mail from Mahesh Chawla to Dale Vincent PI ECCS LAR | |
TAC:MD4209 | 18 September 2007 | ||
L-PI-07-068, Comments on Safety Evaluation and License Amendment to Incorporate Large-Break Loss-of-Coolant Accident (LBLOCA) Analysis Using Astrum | 17 September 2007 | Comments on Safety Evaluation and License Amendment to Incorporate Large-Break Loss-of-Coolant Accident (LBLOCA) Analysis Using Astrum | |
ML072280453 | 13 September 2007 | Summary of Meeting with Nuclear Management Company, LLC (NMC) Regarding Changes to the Security Plan | |
L-PI-07-067, Voluntary Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2007-17, Preparation and Scheduling of Operator Licensing Examinations. | 11 September 2007 | Voluntary Response to Nuclear Regulatory Commission (NRC) Regulatory Issue Summary (RIS) 2007-17, Preparation and Scheduling of Operator Licensing Examinations. | |
L-PI-07-066, Response to Request for Additional Information on 2006 Prairie Island Nuclear Generating Plant (PINGP) Unit 1 Steam Generator Tube Inspections | 7 September 2007 | Response to Request for Additional Information on 2006 Prairie Island Nuclear Generating Plant (PINGP) Unit 1 Steam Generator Tube Inspections | |
ML072430237 | 31 August 2007 | 8/31/07 Prairie Island - Mid-Cycle Performance Review and Inspection Plan | |
ML072480417 | 29 August 2007 | Ltr. 08/29/07 Prairie Island Requalification Program Inspection | |
ML072360207 | 23 August 2007 | Local Outreach Initiative Letter - Prairie Island - Prairie Island Tribal Community | |
ML072400436 | 23 August 2007 | Letter to Patricia Milligan, Dated August 23, 2007, from Paul Schmidt, Radiation Protection Section, Dept. of Health and Family Services, State of Wisconsin Regarding Potassium Iodide (Ki) Tablets | |
ML072360251 | 23 August 2007 | Local Outreach Initiative Letter - Prairie Island - Goodhue County |