Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
TAC:MD6294 | 21 December 2007 | ||
ML073531827 | 21 December 2007 | Notice of Meeting with Nuclear Management Company Re Issues Related to the Proposed Combined Emergency Plan for Monticello and Prairie Island | |
ML073540372 | 19 December 2007 | Change to the Inspection Plan 1/1/08 - 12/31/08 | |
ML073381315 | 3 December 2007 | Draft RAI for Relief Request No. 15 | |
ML073340942 | 30 November 2007 | Units 1 and 2 - Revision to Correspondence Mailing List for Nuclear Management Company, LLC and Contact Information for Electronic Distribution of Correspondence | |
TAC:MD4438 | 30 November 2007 | ||
L-MT-07-089, Response to Request for Additional Information to Revise Technical Specification Surveillance Requirement 3.8.4.2 for the 250 Vdc Division 2 Battery Charger Output | 30 November 2007 | Response to Request for Additional Information to Revise Technical Specification Surveillance Requirement 3.8.4.2 for the 250 Vdc Division 2 Battery Charger Output | |
IR 05000263/2007502 | 29 November 2007 | IR 05000263-07-502, on 11/05/2007 - 11/09/2007; Monticello Nuclear Generating Plant, Biennial Emergency Preparedness Exercise Baseline Inspection | |
IR 05000263/2007405 | 27 November 2007 | IR 05000263-07-405, (Drs), 10/22/2007 - 10/26/2007, Monticello Nuclear Generating Plant (Mngp), Routine Security Baseline Inspection - Cover Letter Only | |
IR 07200058/2007001 | 19 November 2007 | IR 07200058-07-01(DNMS), on 06/28/2007, 07/25-27/2007, 07/30 - 08/01/2007; and 08/29-31/2007, on-site and on 11/13/2007, in-office Review, Monticello Nuclear Generating Plant | Finite Element Analysis Design basis earthquake Earthquake Moisture Density Gauge |
L-HU-07-029, Generic Letter 2003-01, Control Room Habitability, Commitment Change | 14 November 2007 | Generic Letter 2003-01, Control Room Habitability, Commitment Change | |
ML073130121 | 8 November 2007 | Re NRC Office of Investigations Report No. 3-2007-015 (AMS File No. RIII-2007-A-0011) | |
ML072960159 | 8 November 2007 | Issuance of Amendment to Remove the Table of Contents from the Technical Specifications | |
IR 05000263/2007302 | 31 October 2007 | Er 05000263-07-302(DRS); 10/03/2007, Monticello Nuclear Generating Plant, NRC Initial License Examination Report | |
TAC:MD6864 | 31 October 2007 | ||
ML073040388 | 31 October 2007 | Ro/Sro Initial Written Examination | Met Tower |
ML072750633 | 31 October 2007 | (MNGP) - Request for Withholding Information from Public Disclosure | |
IR 05000263/2007004 | 30 October 2007 | IR 05000263-07-004; 07/01/2007 Through 09/30/2007; Monticello Nuclear Generating Plant, Inservice Inspection Activities, Maintenance Risk Assessments and Emergent Work Control, Event Follow-Up | Unanalyzed Condition High Radiation Area Ultimate heat sink Internal Flooding Hydrostatic Enforcement Discretion Nondestructive Examination Operator Manual Action Temporary Modification Significance Determination Process Through-Wall Leak Through-Wall Leakage Fire Protection Program |
ML072990249 | 29 October 2007 | Temporary Branch Chief Reassignment | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
IR 05000263/2007006 | 23 October 2007 | IR 05000263-07-006(DRS); 08/27/2007 Through 09/14/2007; Perry Nuclear Power Plant. Routine Engineering Baseline Inspection | Safe Shutdown Time of Discovery |
ML072920547 | 19 October 2007 | Draft RAI RA: Response to GL 2007-01 | |
TAC:MD4348 | 19 October 2007 | ||
ML072780599 | 19 October 2007 | Summary of 10/3/07 Meeting Between NRC and Monticello Personnel a Future Extended Power Uprate Amendment | Finite Element Analysis |
ML072900020 | 13 October 2007 | Letter Transmitting Significance Determination Process, Rev. 2 | Significance Determination Process |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
ML072770508 | 3 October 2007 | 10/3/07 Meeting Handout, Steam Dryer Evaluation Approach for Monticello Extended Power Uprate (Epu). | Finite Element Analysis Flow Induced Vibration |
ML072760239 | 3 October 2007 | Dennis Koehl Named New Chief Nuclear Officer of Nuclear Management Company (Nmc); Jim Mccarthy Named Interim Site Vice-President at Point Beach Nuclear Plant | |
TAC:MD6854 | 26 September 2007 | ||
L-MT-07-071, CFR 50.55a Request No. 15: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval | 26 September 2007 | CFR 50.55a Request No. 15: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval | Nondestructive Examination VT-2 |
ML072820487 | 25 September 2007 | GE-NE-0000-0052-3113-NP-R0, Monticello, Safer/Gestr ECCS-LOCA Analysis - LPCI Loop Selection Detectable Break Area. | MELLLA Coast down |
L-MT-07-055, License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function | 25 September 2007 | License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function | Safe Shutdown Reactor Vessel Water Level Probabilistic Risk Assessment Large early release frequency Grace period |
ML072700613 | 24 September 2007 | Re Operator Licensing Examination Approval | |
Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment | 17 September 2007 | Temporary Scaffolding Affects Operability of Safety-Related Equipment | Fire Protection Program Scaffolding |
L-MT-07-046, License Amendment Request: Application for Technical Specification Change TSTF-477, Add Action for Two Inoperable Control Room Air Conditioning Subsystems to the Technical Specifications Using the Consolidated Line Item Improvement Proce | 17 September 2007 | License Amendment Request: Application for Technical Specification Change TSTF-477, Add Action for Two Inoperable Control Room Air Conditioning Subsystems to the Technical Specifications Using the Consolidated Line Item Improvement Process | Incorporated by reference Recently irradiated fuel |
ML072560224 | 14 September 2007 | Notice of Forthcoming Meeting with Monticello Nuclear Generating Plant Regarding Steam Dryers in Extended Power Uprate Conditions | Finite Element Analysis |
ML072430100 | 31 August 2007 | 8/31/07 Monticello - Mid-Cycle Performance Review and Inspection Plan | |
TAC:MD4611 | 23 August 2007 | ||
ML072190495 | 23 August 2007 | Revised Renewed Facility Operating License Pages to Reflect Issue B.5.b | B.5.b Mitigating Strategies |
ML072330067 | 23 August 2007 | Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac No. MD4611) | B.5.b Severe Accident Management Guideline Safeguards Contingency Plan B.5.b Mitigating Strategies |
L-HU-07-023, Units 1 and 2, Fitness for Duty Performance Data for Period Ending June 30, 2007 | 17 August 2007 | Units 1 and 2, Fitness for Duty Performance Data for Period Ending June 30, 2007 | Fitness for Duty |
ML072260300 | 13 August 2007 | Request for Information for Heat Sink Performance Inspection | Ultimate heat sink Frazil ice |
L-HU-07-021, Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan | 7 August 2007 | Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan | Safe Shutdown Health Physics Network Offsite Dose Calculation Manual Emergency Lighting Design basis earthquake Severe Accident Management Guideline Earthquake |
L-MT-07-058, Cycle No. 23 Lnservice Inspection Summary Report for Lnservice Inspection and ASME Section XI Repairs and Replacements | 27 July 2007 | Cycle No. 23 Lnservice Inspection Summary Report for Lnservice Inspection and ASME Section XI Repairs and Replacements | Stroke time Hydrostatic Coatings Nondestructive Examination VT-2 Scram Discharge Volume Code Reconciliation EVT-1 Liquid penetrant Scaffolding |
ML071380230 | 20 July 2007 | Issuance of License Amendment 151 Regarding Low-Pressure Coolant Injection System Loop Select Logic Time Delay Functions | Probabilistic Risk Assessment Large early release frequency |
IR 05000263/2007003 | 18 July 2007 | IR 05000263-07-003, on 04/01/2007 - 06/30/2007; Monticello Nuclear Generating Plant. Identification and Resolution of Problems | High winds Offsite Dose Calculation Manual Time to boil Temporary Modification Significance Determination Process Operability Determination Maintenance Rule Program Pressure Boundary Leakage Through-Wall Leak Through-Wall Leakage Fire Protection Program |
IR 05000263/2007404 | 17 July 2007 | IR 05000263-07-404, on 06/04/2007 - 06/08/2007, Monticello Nuclear Generating Plant (Mngp); Routine Security Baseline Inspection - Cover Letter | Significance Determination Process Affidavit |
L-MT-07-036, License Amendment Request, Remove Table of Contents from Technical Specifications | 9 July 2007 | License Amendment Request, Remove Table of Contents from Technical Specifications | Shutdown Margin High Radiation Area Ultimate heat sink Post Accident Monitoring Hydrostatic Scram Discharge Volume |
TAC:MD6027 | 9 July 2007 | ||
L-HU-07-020, Generic Letter 2003-01, Control Room Habitability, Commitment Change | 3 July 2007 | Generic Letter 2003-01, Control Room Habitability, Commitment Change |