Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
TAC:MD629421 December 2007
ML07353182721 December 2007Notice of Meeting with Nuclear Management Company Re Issues Related to the Proposed Combined Emergency Plan for Monticello and Prairie Island
ML07354037219 December 2007Change to the Inspection Plan 1/1/08 - 12/31/08
ML0733813153 December 2007Draft RAI for Relief Request No. 15
ML07334094230 November 2007Units 1 and 2 - Revision to Correspondence Mailing List for Nuclear Management Company, LLC and Contact Information for Electronic Distribution of Correspondence
TAC:MD443830 November 2007
L-MT-07-089, Response to Request for Additional Information to Revise Technical Specification Surveillance Requirement 3.8.4.2 for the 250 Vdc Division 2 Battery Charger Output30 November 2007Response to Request for Additional Information to Revise Technical Specification Surveillance Requirement 3.8.4.2 for the 250 Vdc Division 2 Battery Charger Output
IR 05000263/200750229 November 2007IR 05000263-07-502, on 11/05/2007 - 11/09/2007; Monticello Nuclear Generating Plant, Biennial Emergency Preparedness Exercise Baseline Inspection
IR 05000263/200740527 November 2007IR 05000263-07-405, (Drs), 10/22/2007 - 10/26/2007, Monticello Nuclear Generating Plant (Mngp), Routine Security Baseline Inspection - Cover Letter Only
IR 07200058/200700119 November 2007IR 07200058-07-01(DNMS), on 06/28/2007, 07/25-27/2007, 07/30 - 08/01/2007; and 08/29-31/2007, on-site and on 11/13/2007, in-office Review, Monticello Nuclear Generating PlantFinite Element Analysis
Design basis earthquake
Earthquake
Moisture Density Gauge
L-HU-07-029, Generic Letter 2003-01, Control Room Habitability, Commitment Change14 November 2007Generic Letter 2003-01, Control Room Habitability, Commitment Change
ML0731301218 November 2007Re NRC Office of Investigations Report No. 3-2007-015 (AMS File No. RIII-2007-A-0011)
ML0729601598 November 2007Issuance of Amendment to Remove the Table of Contents from the Technical Specifications
IR 05000263/200730231 October 2007Er 05000263-07-302(DRS); 10/03/2007, Monticello Nuclear Generating Plant, NRC Initial License Examination Report
TAC:MD686431 October 2007
ML07304038831 October 2007Ro/Sro Initial Written ExaminationMet Tower
ML07275063331 October 2007(MNGP) - Request for Withholding Information from Public Disclosure
IR 05000263/200700430 October 2007IR 05000263-07-004; 07/01/2007 Through 09/30/2007; Monticello Nuclear Generating Plant, Inservice Inspection Activities, Maintenance Risk Assessments and Emergent Work Control, Event Follow-UpUnanalyzed Condition
High Radiation Area
Ultimate heat sink
Internal Flooding
Hydrostatic
Enforcement Discretion
Nondestructive Examination
Operator Manual Action
Temporary Modification
Significance Determination Process
Through-Wall Leak
Through-Wall Leakage
Fire Protection Program
ML07299024929 October 2007Temporary Branch Chief Reassignment
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
IR 05000263/200700623 October 2007IR 05000263-07-006(DRS); 08/27/2007 Through 09/14/2007; Perry Nuclear Power Plant. Routine Engineering Baseline InspectionSafe Shutdown
Time of Discovery
ML07292054719 October 2007Draft RAI RA: Response to GL 2007-01
TAC:MD434819 October 2007
ML07278059919 October 2007Summary of 10/3/07 Meeting Between NRC and Monticello Personnel a Future Extended Power Uprate AmendmentFinite Element Analysis
ML07290002013 October 2007Letter Transmitting Significance Determination Process, Rev. 2Significance Determination Process
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
ML0727705083 October 200710/3/07 Meeting Handout, Steam Dryer Evaluation Approach for Monticello Extended Power Uprate (Epu).Finite Element Analysis
Flow Induced Vibration
ML0727602393 October 2007Dennis Koehl Named New Chief Nuclear Officer of Nuclear Management Company (Nmc); Jim Mccarthy Named Interim Site Vice-President at Point Beach Nuclear Plant
TAC:MD685426 September 2007
L-MT-07-071, CFR 50.55a Request No. 15: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection Interval26 September 2007CFR 50.55a Request No. 15: Relief from Impractical Examination Coverage Requirements Pursuant to 10 CFR 50.55a(g)(5)(iii) for the Fourth Ten-Year Inservice Inspection IntervalNondestructive Examination
VT-2
ML07282048725 September 2007GE-NE-0000-0052-3113-NP-R0, Monticello, Safer/Gestr ECCS-LOCA Analysis - LPCI Loop Selection Detectable Break Area.MELLLA
Coast down
L-MT-07-055, License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High Function25 September 2007License Amendment Request: Revision to the Allowable Value and Channel Calibration Surveillance Interval for the Recirculation Riser Differential Pressure - High FunctionSafe Shutdown
Reactor Vessel Water Level
Probabilistic Risk Assessment
Large early release frequency
Grace period
ML07270061324 September 2007Re Operator Licensing Examination Approval
Information Notice 2007-29, Temporary Scaffolding Affects Operability of Safety-Related Equipment17 September 2007Temporary Scaffolding Affects Operability of Safety-Related EquipmentFire Protection Program
Scaffolding
L-MT-07-046, License Amendment Request: Application for Technical Specification Change TSTF-477, Add Action for Two Inoperable Control Room Air Conditioning Subsystems to the Technical Specifications Using the Consolidated Line Item Improvement Proce17 September 2007License Amendment Request: Application for Technical Specification Change TSTF-477, Add Action for Two Inoperable Control Room Air Conditioning Subsystems to the Technical Specifications Using the Consolidated Line Item Improvement ProcessIncorporated by reference
Recently irradiated fuel
ML07256022414 September 2007Notice of Forthcoming Meeting with Monticello Nuclear Generating Plant Regarding Steam Dryers in Extended Power Uprate ConditionsFinite Element Analysis
ML07243010031 August 20078/31/07 Monticello - Mid-Cycle Performance Review and Inspection Plan
TAC:MD461123 August 2007
ML07219049523 August 2007Revised Renewed Facility Operating License Pages to Reflect Issue B.5.bB.5.b Mitigating Strategies
ML07233006723 August 2007Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac No. MD4611)B.5.b
Severe Accident Management Guideline
Safeguards Contingency Plan
B.5.b Mitigating Strategies
L-HU-07-023, Units 1 and 2, Fitness for Duty Performance Data for Period Ending June 30, 200717 August 2007Units 1 and 2, Fitness for Duty Performance Data for Period Ending June 30, 2007Fitness for Duty
ML07226030013 August 2007Request for Information for Heat Sink Performance InspectionUltimate heat sink
Frazil ice
L-HU-07-021, Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency Plan7 August 2007Units 1 and 2, Request for Approval of a Combined Nuclear Management Company Emergency PlanSafe Shutdown
Health Physics Network
Offsite Dose Calculation Manual
Emergency Lighting
Design basis earthquake
Severe Accident Management Guideline
Earthquake
L-MT-07-058, Cycle No. 23 Lnservice Inspection Summary Report for Lnservice Inspection and ASME Section XI Repairs and Replacements27 July 2007Cycle No. 23 Lnservice Inspection Summary Report for Lnservice Inspection and ASME Section XI Repairs and ReplacementsStroke time
Hydrostatic
Coatings
Nondestructive Examination
VT-2
Scram Discharge Volume
Code Reconciliation
EVT-1
Liquid penetrant
Scaffolding
ML07138023020 July 2007Issuance of License Amendment 151 Regarding Low-Pressure Coolant Injection System Loop Select Logic Time Delay FunctionsProbabilistic Risk Assessment
Large early release frequency
IR 05000263/200700318 July 2007IR 05000263-07-003, on 04/01/2007 - 06/30/2007; Monticello Nuclear Generating Plant. Identification and Resolution of ProblemsHigh winds
Offsite Dose Calculation Manual
Time to boil
Temporary Modification
Significance Determination Process
Operability Determination
Maintenance Rule Program
Pressure Boundary Leakage
Through-Wall Leak
Through-Wall Leakage
Fire Protection Program
IR 05000263/200740417 July 2007IR 05000263-07-404, on 06/04/2007 - 06/08/2007, Monticello Nuclear Generating Plant (Mngp); Routine Security Baseline Inspection - Cover LetterSignificance Determination Process
Affidavit
L-MT-07-036, License Amendment Request, Remove Table of Contents from Technical Specifications9 July 2007License Amendment Request, Remove Table of Contents from Technical SpecificationsShutdown Margin
High Radiation Area
Ultimate heat sink
Post Accident Monitoring
Hydrostatic
Scram Discharge Volume
TAC:MD60279 July 2007
L-HU-07-020, Generic Letter 2003-01, Control Room Habitability, Commitment Change3 July 2007Generic Letter 2003-01, Control Room Habitability, Commitment Change