December 19, 2007 Mr. Timothy J. OConnor Site Vice President Monticello Nuclear Generating Plant Nuclear Management Company, LLC 2807 West County Road 75 Monticello, MN 55362-9637
SUBJECT:
CHANGE TO THE INSPECTION PLAN - MONTICELLO NUCLEAR GENERATING PLANT
Dear Mr. OConnor:
As part of a periodic self-assessment, the Nuclear Regulatory Commission (NRC) thoroughly reviewed its inspection procedures to ensure the continued effective application of inspection resources. The main objective of the review was to determine the appropriate inspection scope for the majority of the inspection procedures in the reactor oversight process (ROP). The result of this effort (designated ROP realignment) created changes to both inspection scope and/or inspection frequency for selected inspection procedures in the ROP. The purpose of this letter is to update the schedule of future inspection activities at your facility that was provided with the mid-cycle assessment letter in August 2007. Please note that there were no changes made to inspection procedures in the security, emergency preparedness, and health physics areas.
The enclosed inspection plan details the inspections (less those related to security) scheduled for calendar year 2008. The inspection plan is provided to resolve any scheduling and/or personnel availability issues well in advance of the inspectors arrival onsite. Routine resident inspections are not listed due to their continuous nature.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Nick Shah Acting for/
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22
Enclosure:
As Stated cc w/encl:
M. Sellman, President and Chief Executive Officer D. Cooper, Senior Vice President and Chief Nuclear Officer Manager, Nuclear Safety Assessment J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc.
State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office
Please contact me at 630-829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by Nick Shah Acting for/
Kenneth Riemer, Chief Projects Branch 2 Division of Reactor Projects Docket No. 50-263 License No. DPR-22
Enclosure:
As Stated cc w/encl:
M. Sellman, President and Chief Executive Officer D. Cooper, Senior Vice President and Chief Nuclear Officer Manager, Nuclear Safety Assessment J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc.
State Liaison Officer, Minnesota Department of Health R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)
Commissioner, Minnesota Pollution Control Agency Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office DOCUMENT NAME:G:\\BRANCH TSS\\ALL MOC\\MIDCYCLE 2006 TO 2007\\ROP REALIGNMENT LETTER\\MONTICELLO.DOC G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII E
RIII RIII RIII NAME NShah, Acting for KRiemer:cms DATE 12/19/07 OFFICIAL RECORD COPY
Letter to T. OConnor from K. Riemer dated December 19, 2007
SUBJECT:
CHANGE TO THE INSPECTION PLAN - MONTICELLO NUCLEAR GENERATING PLANT DISTRIBUTION:
TEB PST RidsNrrDirsIrib MAS KGO JKH3 CST1 CAA1 GLS DRPIII DRSIII PLB1 TXN
Monticello Inspection / Activity Plan 01/01/2008 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 3
BI ENG
- TRIENNIAL FIRE PROTECTION INSPECTION Baseline Inspections 03/31/2008 04/18/2008 7111105T IP Fire Protection [Triennial]
1 BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 04/28/2008 05/02/2008 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 04/28/2008 05/02/2008 71151-PR01 IP RETS/ODCM Radiological Effluent 1
BI EP
- EP ROUTINE INSPECTION / PI VERIFICATION EP Baseline Inspectio 06/23/2008 06/27/2008 7111402 IP Alert and Notification System Testing EP Baseline Inspectio 06/23/2008 06/27/2008 7111403 IP Emergency Response Organization Augmentation Testing EP Baseline Inspectio 06/23/2008 06/27/2008 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 06/23/2008 06/27/2008 71151-EP01 IP Drill/Exercise Performance Baseline Inspections 06/23/2008 06/27/2008 71151-EP02 IP ERO Drill Participation Baseline Inspections 06/23/2008 06/27/2008 71151-EP03 IP Alert & Notification System 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 07/07/2008 07/11/2008 7112202 IP Radioactive Material Processing and Transportation Baseline Inspections 07/07/2008 07/11/2008 71151-BI01 IP Reactor Coolant System Activity 1
- ISFSI INSPECTION Other Routine 07/01/2008 07/15/2008 60854.1 IP Preoperational Testing of Independent Spent Fuel Storage Facility Installation at Operating P Other Routine 07/16/2008 07/30/2008 60854 IP Preoperational Testing Of An ISFSI Other Routine 08/01/2008 09/30/2008 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/29/2008 10/03/2008 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 09/29/2008 10/03/2008 7112102 IP ALARA Planning and Controls Baseline Inspections 09/29/2008 10/03/2008 71151-OR01 IP Occupational Exposure Control Effectiveness 3
BI PI&R
- BIENNIAL PI&R INSPECTION Baseline Inspections 10/20/2008 11/07/2008 71152B IP Identification and Resolution of Problems