IR 05000263/2007405
| ML073370809 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 11/27/2007 |
| From: | Eric Duncan Plant Support Branch II |
| To: | O'Connor T Nuclear Management Co |
| References | |
| IR-07-405 | |
| Download: ML073370809 (4) | |
Text
November 27, 2007
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT
NRC SECURITY BASELINE INSPECTION REPORT 05000263/2007405(DRS)
Dear Mr. OConnor:
On October 26, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Monticello Nuclear Generating Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.
The enclosed inspection report documents the inspection results, which were discussed on October 26, 2007, with Mr. B. Sawatzke and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings of significance were identified.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents
EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)
Exemption number: 5 Nuclear Regulatory Commission review required before public release.
Dale Lawver, RIII/DRS/PSB Name and organization of person making determination.
Date of determination: 10/29/2007 Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled. Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Eric Duncan, Chief Plant Support Branch Division of Reactor Safety
Docket No. 50-263 License No. DPR-22
Nonpublic Enclosure: Inspection Report 05000263/2007405(DRS)
w/Attachment: Supplemental Information
cc w/encl:
D. Riffle, NSIR/DSO/DDSO
cc w/o encl:
M. Sellman, President and Chief Executive Officer
D. Cooper, Senior Vice President and Chief
Nuclear Officer
Manager, Nuclear Safety Assessment
J. Rogoff, Vice President, Counsel, and Secretary
Nuclear Asset Manager, Xcel Energy, Inc.
R. Nelson, President
Minnesota Environmental Control Citizens
Association (MECCA)
Commissioner, Minnesota Pollution Control Agency
D. Gruber, Auditor/Treasurer,
Wright County Government Center
Commissioner, Minnesota Department of Commerce
Manager - Environmental Protection Division
Minnesota Attorney Generals Office Enclosure Contains Sensitive Unclassified Non-Safeguards Information. Upon separation, this page is decontrolled.