IR 05000263/2007404

From kanterella
Jump to navigation Jump to search
IR 05000263-07-404, on 06/04/2007 - 06/08/2007, Monticello Nuclear Generating Plant (Mngp); Routine Security Baseline Inspection - Cover Letter
ML072000409
Person / Time
Site: Monticello 
Issue date: 07/17/2007
From: Eric Duncan
Plant Support Branch II
To: O'Connor T
Nuclear Management Co
References
IR-07-404
Download: ML072000409 (5)


Text

July 17, 2007

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000263/2007404(DRS)

Dear Mr. OConner:

On June 8, 2007, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Monticello Nuclear Generating Plant. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process.

The enclosed inspection report documents the inspection results, which were discussed on June 8, 2007, with yourself and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and with the conditions of your license.

The inspector reviewed selected procedures and records, observed activities, and interviewed personnel.

This report documents two findings of very low security significance (i.e., Green as determined by the Physical Protection Significance Determination Process). The deficiencies were promptly corrected or compensated for, and the plant was in compliance with applicable physical protection and security requirements within the scope of this inspection before the inspector left the site. One finding was NRC-identified and the other finding was licensee-identified.

EXEMPT FROM PUBLIC DISCLOSURE May be exempt from public release under the Freedom of Information Act (5 U.S.C. 552)

Exemption number: 5 Nuclear Regulatory Commission review required before public release.

Dale Lawver, RIII/DRS/PSB Name and organization of person making determination.

Date of determination: 06/08/2007 Enclosure Contains.

Upon separation, this page is decontrolled.

T. OConnor-2-The NRC is treating these violations as non-cited violations (NCVs) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violations and because they are entered into your corrective action program. If you contest these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, DC 20555-001; with copies to the Regional Administrator Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 2005-0001; and the NRC Resident Inspector at the Monticello Nuclear Generating Plant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 Nonpublic Enclosure: Inspection Report 05000263/2007404(DRS)

w/Attachment: Supplemental Information ( )

DISTRIBUTION See next page Enclosure Contains.

Upon separation, this page is decontrolled.

T. OConnor-2-The NRC is treating these violations as non-cited violations (NCVs) consistent with Section VI.A.1 of the NRC Enforcement Policy because of the very low security significance of the violations and because they are entered into your corrective action program. If you contest these NCVs, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the Nuclear Regulatory Commission, ATTN.: Document Control Desk, Washington, DC 20555-001; with copies to the Regional Administrator Region III; the Director, Office of Enforcement, United States Nuclear Regulatory Commission, Washington, DC 2005-0001; and the NRC Resident Inspector at the Monticello Nuclear Generating Plant.

In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related concerns contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letters enclosure will not be available for public inspection.

In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response, if any. This practice will ensure that your response will not be made available electronically for public inspection in the NRC Public Document Room or from the NRCs document system, ADAMS. If Safeguards Information is necessary to provide an acceptable response, please provide the level of protection described in 10 CFR 73.21. Otherwise, mark your entire response Security-Related Information - Withhold Under 10 CFR 2.390" and follow the instructions for withholding in 10 CFR 2.390(b)(1).

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,

/RA/

Eric Duncan, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-263 License No. DPR-22 Nonpublic Enclosure: Inspection Report 05000263/2007404(DRS)

w/Attachment: Supplemental Information ( )

DISTRIBUTION See next page SEE PREVIOUS CONCURRENCES DOCUMENT NAME: C:\\FileNet\\ML072000409.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME DLawver:co KRiemer DFunk ERD for EDuncan DATE 07/13/07 07/13/07 07/17/07 07/17/07 OFFICIAL RECORD COPY Enclosure Contains SAFEGUARDS INFORMATION. Upon separation, this page is decontrolled.

Letter to Timothy J. OConnor from Eric Duncan dated July 17, 2007.

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000263/2007404(DRS)

cc w/encl ( ):

D. Riffle, NSIR/DSO/DDSO cc w/o encl ( ):

M. Sellman, President and Chief Executive Officer D. Cooper, Senior Vice President and Chief Nuclear Officer Manager, Nuclear Safety Assessment J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc.

R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)

Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office Enclosure Contains SAFEGUARDS INFORMATION. Upon separation, this page is decontrolled.

Letter to Timothy J. OConnor from Eric Duncan dated July 17, 2007.

SUBJECT:

MONTICELLO NUCLEAR GENERATING PLANT NRC SECURITY BASELINE INSPECTION REPORT 05000263/2007404(DRS)

cc w/encl ( ):

D. Riffle, NSIR/DSO/DDSO cc w/o encl ( ):

M. Sellman, President and Chief Executive Officer D. Cooper, Senior Vice President and Chief Nuclear Officer Manager, Nuclear Safety Assessment J. Rogoff, Vice President, Counsel, and Secretary Nuclear Asset Manager, Xcel Energy, Inc.

R. Nelson, President Minnesota Environmental Control Citizens Association (MECCA)

Commissioner, Minnesota Pollution Control Agency D. Gruber, Auditor/Treasurer, Wright County Government Center Commissioner, Minnesota Department of Commerce Manager - Environmental Protection Division Minnesota Attorney Generals Office DISTRIBUTION:

TEB PST RidsNrrDirsIrib GEG KGO CST1 CAA1 LSL (electronic IRs only)

C. Pederson, DRS (hard copy - IRs only)

DRPIII DRSIII PLB1 TXN ROPreports@nrc.gov