Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML07354039219 December 2007Change to Inspection Plan 1/1/08 - 12/31/08
L-2007-207, Units 1 & 2, Turkey Point, Units 3 & 4, Duane Arnold and Seabrook - Corporate Merger of Decommissioning Trustee18 December 2007Units 1 & 2, Turkey Point, Units 3 & 4, Duane Arnold and Seabrook - Corporate Merger of Decommissioning Trustee
ML0734105786 December 2007MD6814 - State Consultation
NG-07-0933, Use of the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment5 December 2007Use of the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment
ML0734507064 December 2007LTR Confirming the Final Arrangements for the Upcoming Operator Licensing Examinations at Duane Arnold Energy Center
ML0732011023 December 2007Request for Additional Information Related to Amendment Request to Change Technical Specification Sections 3.7.4 and 5.5.13 Based on Model Text from Technical Specification Task Force Traveler TSTF-448, Revision 3, Chb.
IR 05000331/200700721 November 2007IR 05000331-07-007 on 09/24/2007 - 10/19/2007, Duane Arnold Energy Center, Units 1 and 2; Evaluation of Changes, Tests, or Experiments (10 CFR 50.59) and Permanent Plant ModificationsSafe Shutdown
Stroke time
Condition Adverse to Quality
Significance Determination Process
ML07324096219 November 2007Request for Information (Cdbi), Request for Information an NRC Biennial Baseline Component Design Basis Inspection (CDBI) 05000331-08-006Probabilistic Risk Assessment
Temporary Modification
TAC:MD742116 November 2007
NG-07-0878, Second 10-Year Containment Inspection Plan16 November 2007Second 10-Year Containment Inspection PlanCoatings
Nondestructive Examination
VT-2
Moisture barrier
Earthquake
ML07325043416 November 2007Letter 11/16/07 Duane Arnold Site Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Draft Temporary Instruction InspectionB.5.b Mitigating Strategies
TAC:MD742014 November 2007
NG-07-0729, Technical Specification Change Request, TSCR-094, Application for TS Improvement to Adopt TSTF-343, Revision 1,Affected Technical Specification: Section 5.5.1214 November 2007Technical Specification Change Request, TSCR-094, Application for TS Improvement to Adopt TSTF-343, Revision 1,Affected Technical Specification: Section 5.5.12
NG-07-0809, Response to Request for Additional Information Related to the Relief Request for 3rd Period Limited Weld Examinations7 November 2007Response to Request for Additional Information Related to the Relief Request for 3rd Period Limited Weld Examinations
ML07309006931 October 2007Drawing BECH-M004, Rev. 17, Equipment Location Plans at Elevs 812' -0 & 833' -6.
IR 05000331/200700431 October 2007IR 05000331-07-004, on 07/01/2007 - 09/30/2007, Duane Arnold Energy Center., Inservice Inspection Activities, Event Follow-up, and Other ActivitiesTime of Discovery
High winds
Stroke time
Weld Overlay
Internal Flooding
Past operability
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Annual Radiological Environmental Operating Report
Operability Determination
Earthquake
Maintenance Rule Program
Fuel cladding
Pressure Boundary Leakage
Fire Protection Program
Dissimilar Metal Weld
Siren
TAC:MD566931 October 2007
ML07309006831 October 2007Duane Arnold - Response to Request for Additional Information Related to the Relief Request for Drywell Stabilizer Examinations
ML07296069031 October 2007Proposed Changes to Public Radiation Safety SDP
ML07296017031 October 2007Public Meeting Summary on the Reactor Oversight ProcessTime of Discovery
Mission time
Probabilistic Risk Assessment
Zebra Mussel
Significance Determination Process
Maintenance Rule Program
Power change
Downpower
ML07282013231 October 2007Request for Additional Information: Relief Request from IWB-2500 and IWC-2500 to Allow Performance of Limited Examinations of Various Welds (Tac No. MD5669)
ML07324002425 October 2007Examples of Max Thermal Power License Conditions
ML07299042024 October 2007Temporary Branch Chief Reassignment
L-2007-158, Supplemental Response Regarding Control System Vulnerability19 October 2007Supplemental Response Regarding Control System Vulnerability
ML07289051016 October 2007MR-1-2007-0021 - Management Changes at Seabrook Station, Duane Arnold Energy Center and Turkey Point Nuclear Plant for Florida Power & Light Co
ML07275050615 October 2007Request for Additional Information: Relief Request from IWE-2500 Requirement for Drywell Stabilizer Examinations
NG-07-0848, Appointment of Richard L. Anderson as Duly Authorized Officer for the Duane Arnold Energy Center (DAEC) and Update of Correspondence Service List12 October 2007Appointment of Richard L. Anderson as Duly Authorized Officer for the Duane Arnold Energy Center (DAEC) and Update of Correspondence Service List
ML07282030711 October 2007Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists
TAC:MD81732 October 2007
L-2007-147, Comment (11) of D. E. Grissette, on Behalf of Florida Power & Light Company on Draft Regulatory Guide DG-5019, Reporting of Safeguards Events.1 October 2007Comment (11) of D. E. Grissette, on Behalf of Florida Power & Light Company on Draft Regulatory Guide DG-5019, Reporting of Safeguards Events.Time of Discovery
Contraband
Stolen
Backfit
ML0727502391 October 2007Re NRC Office of Investigations Report No. 3-2007-017 (AMS File No. RIII-2007-A-0025)
ML07275077327 September 2007Quality Assurance Termination for Radioactive Material Packages No. 0835
IR 05000331/200750326 September 2007IR 05000331-07-503; 08/27/2007 - 08/31/2007; Duane Arnold Energy Center; Supplemental Inspection; Inspection Procedure (IP) 95001, Inspection for One or Two White Inputs in a Strategic Performance Area.Condition Adverse to Quality
Significance Determination Process
Preliminary White Finding
ML07275047021 September 2007MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21Commercial Grade Dedication
ML07253061421 September 2007Public Meeting Summary on the Reactor Oversight ProcessTime of Discovery
Enforcement Discretion
Significance Determination Process
Backfit
Power change
ML07240051920 September 2007License Amendment, Modified License Condition 2.C.(2)(b) to Eliminate the Requirement to Perform Generator Load Rejection Large Transient TestingSafe Shutdown
Anticipated operational occurrence
Nondestructive Examination
MELLLA
Fire Protection Program
ML07250000618 September 2007Schedule for Processing Amendments Request to Change Technical Specifications Sections 3.7.4 and 5.5.13 Based on Model Text from Technical Specification Task Force(Tstf) Change Traveler TSTF-448, Revision3, Control Room Envel
ML07253097217 September 2007Schedule for Processing Relief Request from IWA-4221 to Allow Weld Procedure Specifications for Seal Welding of Installed and Spare Main Steam Relief Valves to Be Post-Qualified in Accordance with ASME Section IX Requirement
ML07260031217 September 2007MR-III-07-0019 - Announcement of Duane Arnold Energy Center (DAEC) Management Change
ML07263031914 September 2007P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List
TAC:L2411714 September 2007
ML07263011414 September 2007/ P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170
TAC:L2411614 September 2007
NG-07-0571, Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091).14 September 2007Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091).Incorporated by reference
TAC:MD681414 September 2007
ML07243060131 August 20078/31/07 Duane Arnold - Mid-Cycle Performance Review and Inspection Plan, for 09/01/2007 - 12/31/2008
ML07248054429 August 2007Ltr. 08/29/07 Duane Arnold Re Examination Confirmation
NG-07-0692, Fitness for Duty Performance Data for Six-Month Period Ending June 30, 200728 August 2007Fitness for Duty Performance Data for Six-Month Period Ending June 30, 2007Fitness for Duty
NG-07-0672, Preparation and Scheduling of Operator Licensing Examinations14 August 2007Preparation and Scheduling of Operator Licensing ExaminationsGeneric Fundamentals Examination
ML0721800059 August 2007Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac MD4529)B.5.b
Severe Accident Management Guideline
Safeguards Contingency Plan
B.5.b Mitigating Strategies