ML073540392 | 19 December 2007 | Change to Inspection Plan 1/1/08 - 12/31/08 | |
L-2007-207, Units 1 & 2, Turkey Point, Units 3 & 4, Duane Arnold and Seabrook - Corporate Merger of Decommissioning Trustee | 18 December 2007 | Units 1 & 2, Turkey Point, Units 3 & 4, Duane Arnold and Seabrook - Corporate Merger of Decommissioning Trustee | |
ML073410578 | 6 December 2007 | MD6814 - State Consultation | |
NG-07-0933, Use of the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment | 5 December 2007 | Use of the Provisions of Appendix Viii, Article VIII-4000, in the Evaluation of Changes in Maximum Cable Length for In-Service Inspection Examination Equipment | |
ML073450706 | 4 December 2007 | LTR Confirming the Final Arrangements for the Upcoming Operator Licensing Examinations at Duane Arnold Energy Center | |
ML073201102 | 3 December 2007 | Request for Additional Information Related to Amendment Request to Change Technical Specification Sections 3.7.4 and 5.5.13 Based on Model Text from Technical Specification Task Force Traveler TSTF-448, Revision 3, Chb. | |
IR 05000331/2007007 | 21 November 2007 | IR 05000331-07-007 on 09/24/2007 - 10/19/2007, Duane Arnold Energy Center, Units 1 and 2; Evaluation of Changes, Tests, or Experiments (10 CFR 50.59) and Permanent Plant Modifications | Safe Shutdown Stroke time Condition Adverse to Quality Significance Determination Process |
ML073240962 | 19 November 2007 | Request for Information (Cdbi), Request for Information an NRC Biennial Baseline Component Design Basis Inspection (CDBI) 05000331-08-006 | Probabilistic Risk Assessment Temporary Modification |
TAC:MD7421 | 16 November 2007 | ||
NG-07-0878, Second 10-Year Containment Inspection Plan | 16 November 2007 | Second 10-Year Containment Inspection Plan | Coatings Nondestructive Examination VT-2 Moisture barrier Earthquake |
ML073250434 | 16 November 2007 | Letter 11/16/07 Duane Arnold Site Specific Implementation of B.5.B Phase 2 and 3 Mitigating Strategies Draft Temporary Instruction Inspection | B.5.b Mitigating Strategies |
TAC:MD7420 | 14 November 2007 | ||
NG-07-0729, Technical Specification Change Request, TSCR-094, Application for TS Improvement to Adopt TSTF-343, Revision 1,Affected Technical Specification: Section 5.5.12 | 14 November 2007 | Technical Specification Change Request, TSCR-094, Application for TS Improvement to Adopt TSTF-343, Revision 1,Affected Technical Specification: Section 5.5.12 | |
NG-07-0809, Response to Request for Additional Information Related to the Relief Request for 3rd Period Limited Weld Examinations | 7 November 2007 | Response to Request for Additional Information Related to the Relief Request for 3rd Period Limited Weld Examinations | |
ML073090069 | 31 October 2007 | Drawing BECH-M004, Rev. 17, Equipment Location Plans at Elevs 812' -0 & 833' -6. | |
IR 05000331/2007004 | 31 October 2007 | IR 05000331-07-004, on 07/01/2007 - 09/30/2007, Duane Arnold Energy Center., Inservice Inspection Activities, Event Follow-up, and Other Activities | Time of Discovery High winds Stroke time Weld Overlay Internal Flooding Past operability Temporary Modification Locked High Radiation Area Significance Determination Process Annual Radiological Environmental Operating Report Operability Determination Earthquake Maintenance Rule Program Fuel cladding Pressure Boundary Leakage Fire Protection Program Dissimilar Metal Weld Siren |
TAC:MD5669 | 31 October 2007 | ||
ML073090068 | 31 October 2007 | Duane Arnold - Response to Request for Additional Information Related to the Relief Request for Drywell Stabilizer Examinations | |
ML072960690 | 31 October 2007 | Proposed Changes to Public Radiation Safety SDP | |
ML072960170 | 31 October 2007 | Public Meeting Summary on the Reactor Oversight Process | Time of Discovery Mission time Probabilistic Risk Assessment Zebra Mussel Significance Determination Process Maintenance Rule Program Power change Downpower |
ML072820132 | 31 October 2007 | Request for Additional Information: Relief Request from IWB-2500 and IWC-2500 to Allow Performance of Limited Examinations of Various Welds (Tac No. MD5669) | |
ML073240024 | 25 October 2007 | Examples of Max Thermal Power License Conditions | |
ML072990420 | 24 October 2007 | Temporary Branch Chief Reassignment | |
L-2007-158, Supplemental Response Regarding Control System Vulnerability | 19 October 2007 | Supplemental Response Regarding Control System Vulnerability | |
ML072890510 | 16 October 2007 | MR-1-2007-0021 - Management Changes at Seabrook Station, Duane Arnold Energy Center and Turkey Point Nuclear Plant for Florida Power & Light Co | |
ML072750506 | 15 October 2007 | Request for Additional Information: Relief Request from IWE-2500 Requirement for Drywell Stabilizer Examinations | |
NG-07-0848, Appointment of Richard L. Anderson as Duly Authorized Officer for the Duane Arnold Energy Center (DAEC) and Update of Correspondence Service List | 12 October 2007 | Appointment of Richard L. Anderson as Duly Authorized Officer for the Duane Arnold Energy Center (DAEC) and Update of Correspondence Service List | |
ML072820307 | 11 October 2007 | Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists | |
TAC:MD8173 | 2 October 2007 | ||
L-2007-147, Comment (11) of D. E. Grissette, on Behalf of Florida Power & Light Company on Draft Regulatory Guide DG-5019, Reporting of Safeguards Events. | 1 October 2007 | Comment (11) of D. E. Grissette, on Behalf of Florida Power & Light Company on Draft Regulatory Guide DG-5019, Reporting of Safeguards Events. | Time of Discovery Contraband Stolen Backfit |
ML072750239 | 1 October 2007 | Re NRC Office of Investigations Report No. 3-2007-017 (AMS File No. RIII-2007-A-0025) | |
ML072750773 | 27 September 2007 | Quality Assurance Termination for Radioactive Material Packages No. 0835 | |
IR 05000331/2007503 | 26 September 2007 | IR 05000331-07-503; 08/27/2007 - 08/31/2007; Duane Arnold Energy Center; Supplemental Inspection; Inspection Procedure (IP) 95001, Inspection for One or Two White Inputs in a Strategic Performance Area. | Condition Adverse to Quality Significance Determination Process Preliminary White Finding |
ML072750470 | 21 September 2007 | MPR Associates, Inc. - Report of Defect in Accordance with 10 CFR 21 | Commercial Grade Dedication |
ML072530614 | 21 September 2007 | Public Meeting Summary on the Reactor Oversight Process | Time of Discovery Enforcement Discretion Significance Determination Process Backfit Power change |
ML072400519 | 20 September 2007 | License Amendment, Modified License Condition 2.C.(2)(b) to Eliminate the Requirement to Perform Generator Load Rejection Large Transient Testing | Safe Shutdown Anticipated operational occurrence Nondestructive Examination MELLLA Fire Protection Program |
ML072500006 | 18 September 2007 | Schedule for Processing Amendments Request to Change Technical Specifications Sections 3.7.4 and 5.5.13 Based on Model Text from Technical Specification Task Force(Tstf) Change Traveler TSTF-448, Revision3, Control Room Envel | |
ML072530972 | 17 September 2007 | Schedule for Processing Relief Request from IWA-4221 to Allow Weld Procedure Specifications for Seal Welding of Installed and Spare Main Steam Relief Valves to Be Post-Qualified in Accordance with ASME Section IX Requirement | |
ML072600312 | 17 September 2007 | MR-III-07-0019 - Announcement of Duane Arnold Energy Center (DAEC) Management Change | |
ML072630319 | 14 September 2007 | P. Paquin Ltr Amendment to Certificate of Compliance No. 6574 for the Model No. 3-82B Package (TAC L24116)/ Register User List | |
TAC:L24117 | 14 September 2007 | ||
ML072630114 | 14 September 2007 | / P. Paquin Ltr Amendment to Certificate of Compliance No. 9208 for the Model No. 10-142B Package (TAC L24117)/S121170 | |
TAC:L24116 | 14 September 2007 | ||
NG-07-0571, Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091). | 14 September 2007 | Application for Technical Specification Improvement to Adopt TSTF-476, Revision 1, Improved Banked Position Withdrawal Sequence (BPWS) Control Rod Insertion Process (NEDO-33091). | Incorporated by reference |
TAC:MD6814 | 14 September 2007 | ||
ML072430601 | 31 August 2007 | 8/31/07 Duane Arnold - Mid-Cycle Performance Review and Inspection Plan, for 09/01/2007 - 12/31/2008 | |
ML072480544 | 29 August 2007 | Ltr. 08/29/07 Duane Arnold Re Examination Confirmation | |
NG-07-0692, Fitness for Duty Performance Data for Six-Month Period Ending June 30, 2007 | 28 August 2007 | Fitness for Duty Performance Data for Six-Month Period Ending June 30, 2007 | Fitness for Duty |
NG-07-0672, Preparation and Scheduling of Operator Licensing Examinations | 14 August 2007 | Preparation and Scheduling of Operator Licensing Examinations | Generic Fundamentals Examination |
ML072180005 | 9 August 2007 | Conforming License Amendment to Incorporate the Mitigation Strategies Required by Section B.5.b. of Commission Order EA-02-026 (Tac MD4529) | B.5.b Severe Accident Management Guideline Safeguards Contingency Plan B.5.b Mitigating Strategies |