August 31, 2007 Mr. Gary Van Middlesworth Vice-President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
DUANE ARNOLD ENERGY CENTER
Dear Mr. Van Middlesworth:
On August 14, 2007, the NRC staff completed its performance review of the Duane Arnold Energy Center for the first half of the calendar year 2007 assessment cycle. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results over the previous 12 months. The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
This performance review and enclosed inspection plan do not include security information. A separate letter designated and marked as "Official Use Only - Security Information" will include the security cornerstone review and resultant inspection plan.
Plant performance for the most recent quarter was within the Regulatory Response column of the NRCs Action Matrix based on one White finding in the Emergency Preparedness cornerstone. The details regarding this finding were documented in NRC Inspection Report 05000331/2006009(DRS).
The enclosed inspection plan details the inspections, less those related to security, scheduled through December 31, 2008. The inspection plan includes a component design bases inspection in February 2008, and is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last nine months of the inspection plan are tentative and may be revised at the end-of-cycle review.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS), is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
G. Van Middlesworth The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Kenneth Riemer at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by A. H. Hsia for/
Cynthia D. Pederson, Director Division of Reactor Projects Docket No. 50-331 License No. DPR-49
Enclosure:
Duane Arnold Energy Center Inspection/Activity Plan DISTRIBUTION:
See next page
G. Van Middlesworth The NRC is currently evaluating the scope and frequency of all the baseline inspection procedures. If the results of the evaluation, or any other circumstances, cause us to change the inspection plan, we will contact you to discuss the change as soon as possible. Please contact Kenneth Riemer at (630) 829-9628 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
/RA by A. H. Hsia for/
Cynthia D. Pederson, Director Division of Reactor Projects Docket No. 50-331 License No. DPR-49
Enclosure:
Duane Arnold Energy Center Inspection/Activity Plan DISTRIBUTION:
See next page DOCUMENT NAME: G:\\Branch TSS\\ALL MOC\\midcycle 2006 to 2007\\Duane Arnold\\DAEC 2007 MOC letter.wpd G Publicly Available G Non-Publicly Available G Sensitive G Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII NAME KRiemer:dtp CPederson*AHH for DATE 08/29/07 08/30/07 OFFICIAL RECORD COPY
Letter to G. Van Middlesworth from C. Pederson dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
DUANE ARNOLD ENERGY CENTER cc w/encl:
J. Stall, Senior Vice President, Nuclear and Chief Nuclear Officer R. Helfrich, Senior Attorney M. Ross, Managing Attorney W. Webster, Vice President, Nuclear Operations M. Warner, Vice President, Nuclear Operations Support R. Kundalkar, Vice President, Nuclear Engineering J. Bjorseth, Site Director D. Curtland, Plant Manager S. Catron, Manager, Regulatory Affairs Chief Radiological Emergency Preparedness Section, Dept. Of Homeland Security D. McGhee, State Liaison Officer Chairman, Linn County Board of Supervisors The Honorable Robert Hogg Chairman, Benton County Supervisors Benton County Sheriff Coordinator, Benton County Emergency Services Mayor of Atkins Mayor of Shellsburg Mayor of Urbana Linn County Sheriff Director, Linn County Emergency Management Agency Mayor of Robins Mayor of Alburnett Mayor of Cedar Rapids Mayor of Hiawatha Mayor of Marion City Manager of Marion Mayor of Center Point Mayor of Palo INPO
Letter to G. Van Middlesworth from C. Pederson dated August 31, 2007
SUBJECT:
MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN -
DUANE ARNOLD ENERGY CENTER DISTRIBUTION:
TEB DWS RidsNrrDirsIpab JLC1 MAS KGO JKH3 RML2 SAM9 SRI Duane Arnold DRPIII DRSIII PLB1 TXN
Duane Arnold Inspection / Activity Plan 09/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 09/10/2007 09/14/2007 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 09/10/2007 09/14/2007 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control P 1
BI ENG
- BIENNIAL MAINTENANCE EFFCTIVENESS INSP.
Baseline Inspections 09/10/2007 09/14/2007 7111112B IP Maintenance Effectiveness 2
BI ENG
- ENGINEERING MODIFICATIONS / 50.59 INSP.
Baseline Inspections 09/24/2007 10/19/2007 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/24/2007 10/19/2007 7111117B IP Permanent Plant Modifications 1
- ISFSI INSPECTION Other Routine 10/01/2007 11/01/2007 60855.1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/29/2007 11/02/2007 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 10/29/2007 11/02/2007 7112102 IP ALARA Planning and Controls Baseline Inspections 10/29/2007 11/02/2007 71151-OR01 IP Occupational Exposure Control Effectiveness Baseline Inspections 10/29/2007 11/02/2007 71151-PR01 IP RETS/ODCM Radiological Effluent 3
OL EXAM
- DUANE ARNOLD INIT PREP 11/2007 Not Applicable 11/26/2007 11/30/2007 W90144 OL - INITIAL EXAM - DUANE ARNOLD - NOV/DEC 2007 3
OL EXAM
- DUANE ARNOLD INIT EXAM 12/2007 Not Applicable 12/10/2007 12/14/2007 W90144 OL - INITIAL EXAM - DUANE ARNOLD - NOV/DEC 2007 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 02/04/2008 02/08/2008 7112101 IP Access Control to Radiologically Significant Areas 5
BI ENG
- COMPONENT DESIGN BASES INSPECTION Baseline Inspections 02/11/2008 03/14/2008 7111121 IP Component Design Bases Inspection 1
RPV HEAD
- RPV HEAD DROP ANALYSIS INSPECTION Baseline Inspections 03/17/2008 04/18/2008 7111120 IP Refueling and Other Outage Activities 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 03/31/2008 04/04/2008 7112201 IP Radioactive Gaseous and Liquid Effluent Treatment and Monitoring Systems Baseline Inspections 03/31/2008 04/04/2008 71151-PR01 IP RETS/ODCM Radiological Effluent 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 08/04/2008 08/08/2008 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 08/04/2008 08/08/2008 71151-BI01 IP Reactor Coolant System Activity Baseline Inspections 08/04/2008 08/08/2008 71151-OR01 IP Occupational Exposure Control Effectiveness 2
BI OL
- BIENNIAL REQUAL. PROGRAM INSPECTION Baseline Inspections 09/15/2008 09/19/2008 7111111B IP Licensed Operator Requalification Program
Duane Arnold Inspection / Activity Plan 09/01/2007 - 12/31/2008 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 08/29/2007 11:10:40 Report 22 3
BI EP
- EP EXERCISE INSPECTION / PI VERIFICATION Baseline Inspections 10/20/2008 10/24/2008 1
7111401 IP Exercise Evaluation Baseline Inspections 10/20/2008 10/24/2008 1
71151-EP01 IP Drill/Exercise Performance Baseline Inspections 10/20/2008 10/24/2008 1
71151-EP02 IP ERO Drill Participation Baseline Inspections 10/20/2008 10/24/2008 1
71151-EP03 IP Alert & Notification System 1
BI RP
- RADIATION PROTECTION BASELINE INSPECTION Baseline Inspections 10/27/2008 10/31/2008 1
7112102 IP ALARA Planning and Controls This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.