Letter Sequence RAI |
---|
TAC:MD6020, Control Room Habitability (Approved, Closed) |
|
MONTHYEARNG-07-0493, Tscr: Consolidated Line Item Improvement, Adoption of Changes to STS Under TSTF-448, Revision 3 Regarding Control Room Envelopes Habitability2007-06-29029 June 2007 Tscr: Consolidated Line Item Improvement, Adoption of Changes to STS Under TSTF-448, Revision 3 Regarding Control Room Envelopes Habitability Project stage: Other ML0725000062007-09-18018 September 2007 Schedule for Processing Amendments Request to Change Technical Specifications Sections 3.7.4 and 5.5.13 Based on Model Text from Technical Specification Task Force(Tstf) Change Traveler TSTF-448, Revision3, Control Room Envel Project stage: Other ML0732011022007-12-0303 December 2007 Request for Additional Information Related to Amendment Request to Change Technical Specification Sections 3.7.4 and 5.5.13 Based on Model Text from Technical Specification Task Force Traveler TSTF-448, Revision 3, Chb. Project stage: RAI NG-08-0001, Response to Request for Additional Information Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Technical Specifications Under Technical Specifications..2008-01-28028 January 2008 Response to Request for Additional Information Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Technical Specifications Under Technical Specifications.. Project stage: Response to RAI NG-08-0312, Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications . .2008-05-0808 May 2008 Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications . . Project stage: Other ML0816904252008-06-24024 June 2008 License Amendment 269 Adoption of Changes to TSTF-448, Revision 3, Control Room Habitability. Project stage: Approval ML0817805562008-06-24024 June 2008 Tech Spec Pages for Amendment 269 Adoption of Changes to TSTF-448, Revision 3, Control Room Habitability. Project stage: Acceptance Review 2007-09-18
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000331/20240022024-10-25025 October 2024 NRC Inspection Report No. 07200032/2024001 and 05000331/2024002 ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status ML24249A1362024-09-0404 September 2024 EN 57304 - Westinghouse Electric Company, LLC, Final Report - No Embedded Files. Notification of the Potential Existence of Defects Pursuant to 10 CFR Part 21 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities NG-24-0004, 2023 Annual Radiological Environmental Operating Report2024-05-0808 May 2024 2023 Annual Radiological Environmental Operating Report NG-24-0003, Submittal of 2023 Annual Radioactive Material Release Report2024-04-24024 April 2024 Submittal of 2023 Annual Radioactive Material Release Report ML24072A0292024-03-29029 March 2024 Nextera Energy Duane Arnold, Llc. Exemption from Select Requirements of 10 CFR Part 73 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting) NG-24-0001, 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update2024-03-0606 March 2024 2024 Annual Decommissioning and Spent Fuel Management Funding Status Report and Independent Spent Fuel Storage Installation (ISFSI) Decommissioning Financial Assurance Update NG-24-0002, 2023 Annual Exposure Report - Form 5s2024-03-0606 March 2024 2023 Annual Exposure Report - Form 5s L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) NG-23-0010, Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-12-0606 December 2023 Supplement to Duane Arnold Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule NG-23-0009, Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule2023-11-16016 November 2023 Part 73 Exemption Request Regarding Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Final Rule ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment NG-23-0006, Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update2023-05-23023 May 2023 Independent Spent Fuel Storage Installation (ISFSI) Financial Assurance Update ML23137A1672023-05-11011 May 2023 Submittal of 2022 Annual Radiological Environmental Operating Report NG-23-0004, 2022 Annual Radioactive Material Release Report2023-04-25025 April 2023 2022 Annual Radioactive Material Release Report NG-23-0003, 2022 Annual Exposure Report - Form 5s2023-04-21021 April 2023 2022 Annual Exposure Report - Form 5s NG-23-0002, 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report2023-03-27027 March 2023 10 CFR 50.59 Report, Commitment Changes, 10 CFR 72.48 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, and Revision of the DAEC Defueled Safety Analysis Report NG-23-0001, 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report2023-03-27027 March 2023 2023 Annual Decommissioning and Spent Fuel Management Funding Status Report L-2023-029, And Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3)2023-03-10010 March 2023 And Point Beach Units 1 and 2 Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities ML22339A0012022-12-22022 December 2022 – Acceptance of Requested Licensing Action Amendment Request for Common Emergency Plan IR 05000331/20220032022-12-13013 December 2022 NRC Inspection Report No. 05000331/2022003 (Drss) ML22285A0072022-10-13013 October 2022 NRC Analysis of NextEra Energy Duane Arnolds Decommissioning Funding Status Report, Docket No. 50-331 IR 05000331/20220022022-07-13013 July 2022 NRC Inspection Report Nos. 05000331/2022002(DNMS) and 07200032/2022002(DNMS) ML22090A1922022-05-26026 May 2022 Letter to B. Coffey, FPL from M. Doell - Duane Arnold Post Shutdown Activities Report Review Letter ML22132A2872022-05-24024 May 2022 ISFSI DQAP Approval Letter ML22111A0332022-05-20020 May 2022 Operating License Page Correction Letter to B. Coffey, Florida Power and Light, from M. Doell NG-22-0055, Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan2022-05-20020 May 2022 Revision to Duane Arnold Energy Center (DAEC) ISFSI-Only Emergency Plan ML22089A0492022-05-12012 May 2022 Sfmp Review Letter NG-22-0053, 2021 Annual Radiological Environmental Operating Report2022-05-0606 May 2022 2021 Annual Radiological Environmental Operating Report NG-22-0052, Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative2022-05-0404 May 2022 Regulatory Issue Summary 2000-11. NRC Emergency Telecommunications System, Statement of Intent to Implement the Proposed Voluntary Initiative IR 05000331/20224012022-04-27027 April 2022 Decommissioning Security Inspection Report 05000331/2022401 NG-22-0050, Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 02022-04-26026 April 2022 Revised Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program, Revision 0 NG-22-0049, 2021 Annual Radioactive Material Release Report2022-04-26026 April 2022 2021 Annual Radioactive Material Release Report ML22066A7632022-04-25025 April 2022 ISFSI-Only Emergency Plan License Amendment Approval L-2022-068, NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 22022-04-25025 April 2022 NextEra Energy Duane Arnold Quality Assurance Topical Report (FPL-3) Revision 2 NG-22-0035, Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 02022-04-13013 April 2022 Response to Request for Additional Information Relating to Decommissioning Quality Assurance Program. Revision 0 NG-22-0047, Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool2022-04-11011 April 2022 Registration of Independent Spent Fuel Installation Storage Cask and Notification of Permanent Removal of All Spent Fuel Assemblies from the Spent Fuel Pool NG-22-0042, Registration of Independent Spent Fuel Installation Storage Casks2022-04-0808 April 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0041, And Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report2022-03-31031 March 2022 And Independent Spent Fuel Storage Installation, 2022 Annual Decommissioning and Spent Fuel Management Funding Status Report NG-22-0030, Registration of Independent Spent Fuel Installation Storage Casks2022-03-23023 March 2022 Registration of Independent Spent Fuel Installation Storage Casks NG-22-0031, 2021 Annual Exposure Report - Form 5s2022-03-23023 March 2022 2021 Annual Exposure Report - Form 5s ML22080A1822022-03-22022 March 2022 Letter to B. Coffey from M. Doell - Duane Arnold ISFSI QAPD RAI Letter L-2022-012, Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3)2022-03-16016 March 2022 Florida Power & Light Company Nuclear Property Insurance - 10 CFR 50.54(w)(3) ML22059A7462022-03-10010 March 2022 ISFSI-Only Physical Security Plan License Amendment Approval NG-22-0025, Registration of Independent Spent Fuel Installation Storage Casks2022-03-0808 March 2022 Registration of Independent Spent Fuel Installation Storage Casks 2024-09-04
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan ML22005A0862022-01-0404 January 2022 1-4-2022 Email Communication to Duane Arnold Regarding Its ISFSI Related Exemption Request on Supplemental Information Needed ML21335A0712021-12-0101 December 2021 Request for Additional Information - Duane Arnold Energy Center ISFSI Only Emergency Plan ML21335A0702021-12-0101 December 2021 Cover Letter to B. Coffey from K. Conway - Duane Arnold Energy Center RAI Re License Amendment Request for ISFSI Only Emergency Plan ML21250A3002021-09-0808 September 2021 Defueled Physical Security Plan RAI Cover Letter ML21006A4052021-01-0606 January 2021 NRR E-mail Capture - Final RAI - Duane Arnold - Post-Shutdown Decommissioning Activities Report ML20316A0212020-11-10010 November 2020 NRR E-mail Capture - Final RAI - Duane Arnold - Duane Arnold Amendment for Proposed Defueled EP and EAL Scheme ML20153A3772020-05-28028 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center Quality Assurance Topical Report (FPL-3) - EPID L-2020-LLQ-0002) ML20141L8132020-05-19019 May 2020 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Exemption Request for Security Training Requirements Due to COVID-19 Pandemic - EPID L-2020-LLE-0042 to 45, L-2020-LLE-0051 ML20133K0482020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20127H8662020-05-0505 May 2020 NRR E-mail Capture - Duane Arnold Energy Center (DAEC) - Request for Additional Information (RAI) - Request for Exemptions from 10 CFR 50.82(a)(8)(i)(A) and 1O CFR 50.75(h)(1)(iv) - EPID L-2020-LLE-0011 ML19280A0352019-10-0404 October 2019 NRR E-mail Capture - Final - RAI Related to License Amendment Request (TSCR-182) for Proposed Changes to the Emergency Plan for Permanently Defueled Conditions at Duane Arnold Energy Center (DAEC) - L-2019-LLA-0075 ML18283B0522018-10-0909 October 2018 NRR E-mail Capture - Final Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18255A2922018-09-11011 September 2018 NRR E-mail Capture - Draft Second Round - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18247A2002018-08-21021 August 2018 E-Mailed Request for Information for Duane Arnold, Dated 08/21/18 (DRS-M.Holmberg) ML18166A2982018-06-15015 June 2018 NRR E-mail Capture - Draft Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - LAR TSCR-166, Adoption of EAL Scheme Pursuant to NEI 99-01 - EPID L-2017-LLA-0420 ML18088A0102018-03-28028 March 2018 NRR E-mail Capture - Final RAI for Duane Arnold (DAEC) 5th-10 Year ISI (RR-05) ML18058A0522018-02-27027 February 2018 Enclosurequest for Additional Information (Letter: RAI Regarding Florida Power and Light/Nextera Decommissioning Funding Plan Updates for St. Lucie, Units 1 & 2; Seabrook Station; Duane Arnold Energy Center; and Point Beach, Units 1 and 2) ML18037B0032018-02-0606 February 2018 NRR E-mail Capture - Draft Request for Additional Information - Duane Arnold Energy Center (DAEC) - License Amendment Request (TSCR-170), Revision to Technical Specification 3.5.1, ECCS-Operating - EPID L-2017-LLA-0288 ML17347A8752017-12-12012 December 2017 NRR E-mail Capture - Second Round of Request for Additional Information - Duane Arnold Energy Center (DAEC) - LAR to Adopt TST-542, Revision 2, Reactor Pressure Vessel Water Inventory Control - CAC No. MF9829 ML17277A3652017-10-0404 October 2017 NRR E-mail Capture - Final Request for Additional Information - Duane Arnold - Application to Revise Technical Specifications to Adopt TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control - CAC No. MF9829 ML17240A0082017-08-25025 August 2017 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center (DAEC) - Fifth Ten Year Service Inspection Interval - Relief Request No. RR-04, Rev. 0 - Proposed Alternative for Seal Weld Procedure Qualification - MF937 ML17220A3332017-08-0808 August 2017 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center - Relief Request No. RR-03 - Alternative Requirements for Nozzle Inner Radius and Nozzle-To-Shell Welds - CAC No. MF9374 ML17159A7962017-06-0707 June 2017 17 Duane Arnold Energy Center - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection (Mxg) ML17068A0632017-03-0808 March 2017 NRR E-mail Capture - Final - Request for Additional Information (RAI) - Duane Arnold Energy Center (DAEC) - Revision to Staff Augmentation Times in the Duane Arnold Energy Center (DAEC) Emergency Plan (Eplan) - MF8390 ML16333A4622016-11-28028 November 2016 NRR E-mail Capture - Final Request for Additional Information - Duane Arnold Energy Center - LAR - SFP Criticality - MF7486 ML16326A0092016-11-18018 November 2016 NRR E-mail Capture - Request for Additional Information Re. Nextera/Fpl LAR to Adopt TSTF-545 - CACs MF8203, MF8204, MF8208, and MF8209 ML16313A0742016-11-0808 November 2016 NextEra Audit Plan Nov 2016 (DAEC SFP Criticality LAR) ML16075A0032016-03-14014 March 2016 NRR E-mail Capture - Request for Additional Information - Duane Arnold Energy Center - LAR to Reduce the Reactor Steam Dome Pressure Specified in the Technical Specifications 2.1.1, Reactor Core Safety Limits - MF6618 ML16074A3142016-03-14014 March 2016 NRR E-mail Capture - Second Round RAIs - Duane Arnold Energy Center - LAR (TSCR-143) to Extend Containment Leakage Test Frequency - MF6619 ML16021A0122016-01-21021 January 2016 Request for Additional Information by the Containment & Ventilation Branch and PRA Licensing Branch License Amendment Request - Extension of the 10 CFR 50 Appendix J Containment Type a & Type C Test Intervals ML16022A0092016-01-21021 January 2016 NRR E-mail Capture - Request for Additional Information - LAR to Revise and Relocate Pressure and Temperature Limit Curves to a Pressure and Temperature Limits Report - MF6617 ML16014A6962016-01-0707 January 2016 E-Mail: Duane Arnold, MOD/50.59 Inspection Request for Information (Jsp) ML16005A6082015-12-24024 December 2015 E-Mail: Duane Arnold Request for Information; December 24, 2015 (AAS) ML15175A0652015-06-23023 June 2015 Ltr. 06/23/15 Duane Arnold Energy Center - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information Inspection Report 05000331/2015003 (Axd) ML14057A7562014-02-25025 February 2014 14 Duane Arnold CDBI Request for Information ML14031A1462014-01-29029 January 2014 Update to NextEra Energy Duane Arnold, Llc'S Response to NRC Request for Additional Information Associated with Near-Term Task Force Recommendations ML13323B4432013-11-26026 November 2013 Interim Staff Evaluation and Request for Additional Information Regarding the Overall Integrated Plan for Implementation of Order EA-12-051, Reliable Spent Fuel Pool Instrumentation ML13255A1982013-09-16016 September 2013 Request for Additional Information Regarding Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) ML13175A3932013-06-27027 June 2013 Request for Additional Information for Review Regarding License Amendment Request to Adopt National Fire Protection Association Standard 805 ML13154A5112013-06-0404 June 2013 Rai'S Following Ifib Analysis of NextEra Energy'S 2013 Decommissioning Funding Status Reports for Duane Arnold Energy Center and Point Beach Units 1 and 2 ML12107A0592012-04-11011 April 2012 NRR E-mail Capture - ME7246 - DAEC - Request for Additional Information (RAI) Relief Requests NDR-R003, R010, R011, R014, R015 ML12056A0502012-03-12012 March 2012 Enclosure 4 - Recommendation 2.3: Flooding ML12056A0482012-03-12012 March 2012 Enclosure 2 - Recommendation 2.1: Flooding ML12056A0512012-03-12012 March 2012 Enclosure 5 - Recommendation 9.3: Emergency Preparedness ML12056A0492012-03-12012 March 2012 Enclosure 3 - Recommendation 2.3: Seismic ML12056A0472012-03-12012 March 2012 Enclosure 1 - Recommendation 2.1: Seismic ML1201203182012-01-17017 January 2012 Request for Additional Information Amendment to Change Emergency Action Levels ML12011A0602012-01-0404 January 2012 NRR E-mail Capture - ME6508 - DAEC - Emergency Action Level (EAL) Changes ML1132105812011-11-28028 November 2011 Request for Additional Information Regarding 60-Day Response to Bulletin 2011-01, Mitigating Strategies. 2024-07-12
[Table view] |
Text
December 3, 2007 Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
DUANE ARNOLD ENERGY CENTER - REQUEST FOR ADDITIONAL INFORMATION RELATED TO AMENDMENT REQUEST TO CHANGE TECHNICAL SPECIFICATION SECTIONS 3.7.4 AND 5.5.13 BASED ON MODEL TEXT FROM TECHNICAL SPECIFICATION TASK FORCE TRAVELER TSTF-448, REVISION 3, CONTROL ROOM HABITABILITY (TAC NO. MD6020)
Dear Mr. Anderson:
By letter to the Nuclear Regulatory Commission (NRC) dated June 29, 2007, FPL Energy Duane Arnold, LLC submitted a request to change Technical Specification (TS) Sections 3.7.4 and 5.5.13 based on model text from TS Task Force (TSTF), TSTF-448, for Duane Arnold Energy Center.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with Tony Browning of your staff on November 29, 2007, it was agreed that you would provide a response by January 11, 2008.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC=s goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-3079.
Sincerely,
/RA/
Karl D. Feintuch, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosure:
Request for Additional Information cc w/encl: See next page
Mr. Richard L. Anderson Vice President Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324-9785
SUBJECT:
DUANE ARNOLD ENERGY CENTER - REQUEST FOR ADDITIONAL INFORMATION RELATED TO AMENDMENT REQUEST TO CHANGE TECHNICAL SPECIFICATION SECTIONS 3.7.4 AND 5.5.13 BASED ON MODEL TEXT FROM TECHNICAL SPECIFICATION TASK FORCE TRAVELER TSTF-448, REVISION 3, CONTROL ROOM HABITABILITY (TAC NO. MD6020)
Dear Mr. Anderson:
By letter to the Nuclear Regulatory Commission (NRC) dated June 29, 2007, FPL Energy Duane Arnold, LLC submitted a request to change Technical Specification (TS) Sections 3.7.4 and 5.5.13 based on model text from TS Task Force (TSTF), TSTF-448, for Duane Arnold Energy Center.
The NRC staff is reviewing your submittal and has determined that additional information is required to complete the review. The specific information requested is addressed in the enclosure to this letter. During a discussion with Tony Browning of your staff on November 29, 2007, it was agreed that you would provide a response by January 11, 2008.
The NRC staff considers that timely responses to requests for additional information help ensure sufficient time is available for staff review and contribute toward the NRC=s goal of efficient and effective use of staff resources. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-3079.
Sincerely,
/RA/
Karl D. Feintuch, Project Manager Plant Licensing Branch III-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-331
Enclosure:
Request for Additional Information cc w/encl: See next page DISTRIBUTION:
PUBLIC LPL3-1 R/F RidsNrrDorlLpl3-1 RidsNrrPMAMuniz RidsNrrLATHarris RidsAcrsAcnwMailCenter RidsOgcRp RidsRgn3MailCenter RidsNrrDorlDpr RidsNrrPMKFeintuch ADAMS Accession Number: ML073201102 OFFICE LPL3-1/PM LPL3-1/LA LPL3-1/LA DSS/BC LPL3-1/(A)BC NAME KFeintuch BTully THarris RDennig CMunson PDM for DATE 12/3/07 11/30/07 11/30/07 12/3/07 12/3/07 OFFICIAL RECORD COPY
Duane Arnold Energy Center cc:
Mr. J. A. Stall U. S. Nuclear Regulatory Commission Senior Vice President, Nuclear and Chief Resident Inspector=s Office Nuclear Officer Rural Route #1 Florida Power & Light Company Palo, IA 52324 P. O. Box 14000 Juno Beach, FL 33408-0420 Mr. M. Warner Vice President, Nuclear Operations, North Mr. M. S. Ross Region Managing Attorney Florida Power & Light Company Florida Power & Light Company P. O. Box 14000 P. O. Box 14000 Juno Beach, FL 33408 Juno Beach, FL 33408-0420 Mr. D. A. Curtland Ms. Marjan Mashhadi Plant Manager Senior Attorney Duane Arnold Energy Center Florida Power & Light Company 3277 DAEC Rd.
801 Pennsylvania Avenue, NW Palo, IA 52324-9785 Suite 220 Washington, DC 20004 Mr. R. S. Kundalkar Vice President, Nuclear Technical Svcs.
Don E. Grissette Florida Power & Light Company Vice President, Nuclear Training and P. O. Box 14000 Performance Improvement Juno Beach, FL 33408 Florida Power & Light Company P. O. Box 14000 Daniel K. McGhee Juno Beach, FL 33408 Iowa Department of Public Health Bureau of Radiological Health John Bjorseth 321 East 12th Street Site Director Lucas State Office Building, 5th Floor Duane Arnold Energy Center Des Moines, IA 50319-0075 3277 DAEC Road Palo, IA 52324 Chairman, Linn County Board of Supervisors Steven R. Catron 930 1st Street SW Manager, Regulatory Affairs Cedar Rapids, IA 52404 Duane Arnold Energy Center 3277 DAEC Road Palo, IA 52324 October 19, 2007
REQUEST FOR ADDITIONAL INFORMATION DUANE ARNOLD ENERGY CENTER DOCKET NO. 50-331(TAC NO. MD6020)
In reviewing the FPL Energy Duane Arnold, LLC submittal dated June 29, 2007 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML072040245), related to request to change Technical Specification (TS) Sections 3.7.4 and 5.5.13 based on model text from TS Task Force (TSTF), TSTF-448, for Duane Arnold Energy Center, the Nuclear Regulatory Commission (NRC) staff has determined that the following information is needed in order to complete its review:
- 1. The licensee stated that the wording for TS 5.5.13.d differs from the model wording used in TSTF-448. More specifically, the wording has been changed to specify that the Control Building (CB) pressure is measured relative to the outside atmosphere instead of relative to all external areas adjacent to the CB Envelope.
It is the NRC staffs understanding that the primary purpose of measuring differential pressure (dp) relative to all external areas adjacent to the control room envelope (CRE) boundary is to determine the direction of air flow across the boundary of the CRE. It is not clear how measuring dp relative to outside atmosphere will provide any meaningful information that can be used to determine the direction of air flow across the CRE boundary.
Therefore, the NRC staff is requesting that the licensee measure dp relative to all external areas adjacent to the CRE boundary, as stated in TSTF-448, or explain in detail how measuring dp relative to outside atmosphere will provide information that can determine the direction of air flow across the CRE boundary.
- 2. The license referenced a previously performed hazardous chemical evaluation as docketed in a letter to the NRC dated January 28, 2005 (ADAMS Accession No. ML050390308). This evaluation found that there are no on-site or off-site stationary or mobile hazardous chemical sources that threaten CB habitability.
What program or programs currently exist at Duane Arnold Energy Center to ensure that the licensee revisits the issue of on-site and mobile sources of hazardous chemicals on a periodic basis?
ENCLOSURE