Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML15189A23830 June 2015NRR E-mail Capture - Acceptance Review - Vogtle End States
ML15170A06418 June 2015NRR E-mail Capture - Acceptance Review - Vogtle Nitrogen Cover Pressure
ML15170A03216 June 2015NRR E-mail Capture - Vogtle Electric Generating Plant - Acceptance Review - License Amendment Request
ND-15-1089, Southern Nuclear Operating Company Response to NRC Regulatory Issue Summary 2015-0715 June 2015Southern Nuclear Operating Company Response to NRC Regulatory Issue Summary 2015-07
IR 05000424/20154058 June 2015IR 05000424/2015405 and 05000425/2015405 on 04/29/2015, Vogtle Electric Generating Plant, U.S. Nuclear Regulatory Commission Security Target Set Inspection ReportAffidavit
NL-15-0956, Registration of Spent Fuel Cask Use8 June 2015Registration of Spent Fuel Cask Use
NL-15-0926, Request to Revise Technical Specification LCO 3.5.2 for a One-Time Change to Support a Unit 1 Residual Heat Removal Pump Motor Replacement4 June 2015Request to Revise Technical Specification LCO 3.5.2 for a One-Time Change to Support a Unit 1 Residual Heat Removal Pump Motor ReplacementMission time
Fire Barrier
Internal Flooding
Probabilistic Risk Assessment
Large early release frequency
Maintenance Rule Program
Fuel cladding
TAC:MF63234 June 2015
ML14290A4863 June 2015Y020140127 - Withdrawal of Order EA-05-007, Order Imposing Additional Security Measures
ML15083A0982 June 2015Issuance of Amendments (TAC Nos. MF4828, MF4829, MF4889, and MF4890)Shutdown Margin
Post Accident Monitoring
Hydrostatic
Nondestructive Examination
Pressure and Temperature Limits Report
ML15148A3761 June 2015Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Published June 9, 2015Safe Shutdown
Shutdown Margin
Safe Shutdown Earthquake
Exemption Request
ML15125A08726 May 2015May 12, 2015 Summary of Meeting with Southern Nuclear Operating Company to Discuss a Future Fleet Standard Emergency Plan Submittal
ML15112A05126 May 2015Second Integrated Assessment Extension Letter
ML15139A50821 May 2015May 21, 2015, Public Meeting with Vogtle Regarding GSI-191 Resolution Plan and Current StatusBoric Acid
Ultimate heat sink
Fire Barrier
Coatings
Large early release frequency
ML15141A33320 May 2015Requalification Program Inspection - Vogtle Electric Generating Plants Units 1 & 2
TAC:MF625519 May 2015
NL-15-0441, License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.319 May 2015License Amendment Request to Revise the Minimum Nitrogen Cover Pressure Specified in Technical Specification Surveillance Requirement 3.5.1.3Surveillance Frequency Control Program
ML15134A32618 May 2015Regarding the 2014 Steam Generator Tube Inspections
NL-15-0877, Submittal of Annual Radiological Environmental Operating Reports for 201415 May 2015Submittal of Annual Radiological Environmental Operating Reports for 2014Grab sample
Offsite Dose Calculation Manual
Met Tower
Annual Radiological Environmental Operating Report
Chernobyl
NL-15-0799, Registration of Spent Fuel Cask Use13 May 2015Registration of Spent Fuel Cask Use
NL-15-0422, License Amendment Request to Revise Technical Specifications Regarding Generic Letter 2008-01, Managing Gas Accumulation in Accordance with TSTF-523, Revision 2, Using the Consolidated Line Item Improvement Process (CLIIP)12 May 2015License Amendment Request to Revise Technical Specifications Regarding Generic Letter 2008-01, Managing Gas Accumulation in Accordance with TSTF-523, Revision 2, Using the Consolidated Line Item Improvement Process (CLIIP)Time to boil
Surveillance Frequency Control Program
CAC:MF621312 May 2015
ML15128A0038 May 2015May 12, 2015, Meeting with Southern Nuclear Company, Draft Vogtle Electric Generating Plant, Units 1 & 2, On-Shift and Augmented Emergency Response Organization Summary
ML15128A0028 May 2015May 12, 2015, Meeting with Southern Nuclear Company, Draft Emergency Response Organization Augmentation Plan for the Vogtle Electric Generating PlantHigh Radiation Area
Minimum staff
ML15128A0068 May 2015May 12, 2015, Meeting with Southern Nuclear Company, Draft Table B-1, Vogtle Electric Generating Plant, Units 1 and 2, Site On-Shift Table Comparison
ML15126A3038 May 2015Summary of Meeting with SNC on GSI-191 Program for the VEGPFire Barrier
IR 05000424/20154048 May 2015IR 05000424/2015404 and 05000425/2015404, on 04/24/2015, Vogtle Electric Generating Plant, U.S. Nuclear Regulatory Commission Security Inspection ReportSignificance Determination Process
Affidavit
IR 05000424/20150087 May 2015IR 05000424/2015-008 and 05000425/2015-008, Vogtle, Units 1 and 2 NRC Problem Identification and Resolution Inspection ReportCondition Adverse to Quality
NL-15-0820, Revision to Emergency Plans6 May 2015Revision to Emergency Plans
CAC:MF61976 May 2015
ML15126A2566 May 2015GSI-191 Program Chemical Effects Testing Strainer Headloss Testing NRC Public Meeting - November 6, 2014Boric Acid
Fire Barrier
Coatings
Scaffolding
NL-14-1870, License Amendment Request for Adoption of TSTF-432-A, Rev. 1, Change in Technical Specifications End States (WCAP-16294), Using the Consolidated Line Item Improvement Process6 May 2015License Amendment Request for Adoption of TSTF-432-A, Rev. 1, Change in Technical Specifications End States (WCAP-16294), Using the Consolidated Line Item Improvement ProcessSafe Shutdown
Ultimate heat sink
Grab sample
Probabilistic Risk Assessment
Surveillance Frequency Control Program
Pressure Boundary Leakage
CAC:ME95555 May 2015
NL-15-0812, Operating License Revisions Associated with License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk Informed Technical Specifications Initiative 4b5 May 2015Operating License Revisions Associated with License Amendment Request to Revise Technical Specifications to Implement NEI 06-09, Revision 0-A, Risk Informed Technical Specifications Initiative 4bProbabilistic Risk Assessment
Cyber Security
Safeguards Contingency Plan
IR 05000424/20150011 May 2015IR 05000424/2015001, 05000425/2015001; on 01/01/2015 - 03/31/2015; Vogtle Electric Generating Plant, Units 1 and 2; Event Follow-upEnforcement Discretion
FLEX
Significance Determination Process
Operability Determination
Offsite Circuit
Fire Protection Program
Power change
ML15120A2271 May 2015Biweekly FRN - Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication Date: May 12, 2015Safe Shutdown
Anticipated operational occurrence
Cyber Security
Incorporated by reference
Surveillance Frequency Control Program
Exemption Request
Earthquake
Turbine Missile
Fuel cladding
NL-15-0802, J.M. Farley, E.I. Hatch, Vogtle - Annual Non-Radioactive Environmental Operating Reports for 201430 April 2015J.M. Farley, E.I. Hatch, Vogtle - Annual Non-Radioactive Environmental Operating Reports for 2014
NL-15-0803, J. M. Farley, E. I. Hatch and Vogtle - Submittal of Annual Radioactive Effluent Release Reports for 201430 April 2015J. M. Farley, E. I. Hatch and Vogtle - Submittal of Annual Radioactive Effluent Release Reports for 2014Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
ML15103A06030 April 2015April 22, 2015, Summary of Meeting with Southern Nuclear Operating Company to Discuss a Future Fleet Standard Emergency Plan Submittal
ML15125A05430 April 2015J. M. Farley, E. I. Hatch and Vogtle - Submittal of Annual Radioactive Effluent Release Reports for 2014Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
TAC:MF588422 April 2015
ML15106A20422 April 2015April 22, 2015, Meeting with Southern Nuclear Company, Slide Presentation
NL-15-0751, Certificate Pertaining to FOCI Information Update21 April 2015Certificate Pertaining to FOCI Information Update
NL-15-0723, Reply to a Notice of Violation; EA-14-158, Inspection Report Nos. 05000424/2014009 and 05000425/201400921 April 2015Reply to a Notice of Violation; EA-14-158, Inspection Report Nos. 05000424/2014009 and 05000425/2014009Significance Determination Process
Preliminary White Finding
ML15054A29620 April 2015Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations Relating to Recommendation 2.1 of the NTTF ReviewSafe Shutdown Earthquake
Fukushima Dai-Ichi
Earthquake
TAC:MF377020 April 2015
NRC-2015-0104, Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal Register20 April 2015Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal RegisterFire Barrier
Anticipated operational occurrence
Surveillance Frequency Control Program
Time Critical Operator Action
Exemption Request
Fuel cladding
ML15106A91620 April 2015Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations - Publication in April 28, 2015, Federal RegisterFire Barrier
Anticipated operational occurrence
Surveillance Frequency Control Program
Time Critical Operator Action
Exemption Request
Fuel cladding
ML15106A22317 April 2015April 22, 2015, Meeting with Southern Nuclear Company, Draft Standard Emergency PlanHealth Physics Network
Emergency Lighting
Earthquake
Fuel cladding
Minimum staff
ML15105A18817 April 2015Correction Letter for Proposed Director'S Decision Regarding Saporito Petition Dated March 12, 2011