May 12, 2015, Meeting with Southern Nuclear Company, Draft Table B-1, Vogtle Electric Generating Plant, Units 1 and 2, Site On-Shift Table Comparison
ML15128A006
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/08/2015
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
Williams A
Shared Package
ML15127A455 List:
References
MF5884
Download: ML15128A006 (3)


Text

VEGP 1 & 2 Site On-Shift Table Comparison Major Functional Area Major Tasks Position Title / Expertise 0654 VEGP 1&2 VEGP 1&2 Table B-1 5 Rev 63 on-shift*

Plant Operation and Shift Supervisor (SRO) 1 1 1 Assessment of Operation Shift Foreman (SRO) 1 1 2 Aspects Control Room Operators 2 (per unit) 2 4 Auxiliary Operators 2 (per unit) 2 7 Shift Support Supervisor 1 Emergency Direction and Shift Technical Advisor, Shift 1** 1 1**

Control (Emergency Supervisor or designated facility Coordinator) *** manager Notification / Notify State/local and federal 1**** 2 2**

Communication **** personnel, maintain communication Radiological Accident In-Plant surveys HP Technicians 1 1 1 Assessment and Support of Chemistry / Radiochemistry Chem/HP Technicians 1 1 1 Operational Accident Offsite Surveys onsite (out of plant) Chemistry Technicians, System 5 2 Assessment Operator or other trained personnel FMT Communicator 1 Plant System Engineering Technical support Shift Technical Advisor 1 1 1**

Repair and Corrective Repair and Corrective Actions Mechanical Maintenance 1** 1 1 Actions Electrical Maintenance 1** 1 1 I & C Technician 1 1 Protective Actions (In-Plant) Radiation Protection: HP Technicians 2** 2 2

a. Access Control
b. HP Coverage for repair, corrective actions, search and rescue first-aid & firefighting
c. Personnel monitoring
d. Dosimetry Firefighting Fire Brigade per Tec Specs Rescue Operations and 2** 2** 2**

First-Aid Site Access Control and Security, firefighting Security personnel per security plan Personnel Accountability communications, personnel

accountability Total On-Shift 10 22 25

  • For each unaffected unit, maintain at least 1 SF, 1 CRO, 1 AO ***Overall direction to be assumed by EOF Dire when ERFs are fully manned
    • May be provided by shift personnel assigned other functions ****May be performed by engineering aid to shift supervisor

VEGP 1 & 2 Site 60 Minute Augmented ERO Table Comparison Major Functional Area Major Tasks Position Title / Expertise Table B-1 VEGP 1&2 VEGP 1&2 Augment Rev 5 Rev 63 (60 min)

Notification / Notify State/local and federal 2 2 2 Communication personnel, maintain communication Radiological Accident EOF Director Senior Manager 1 1 1 Assessment and Support of Dose Assessment HP Expertise Operational Accident Offsite Surveys HP Technicians 2 4 3 Assessment On-Site Surveys HP Technicians 1 In-Plant surveys HP Technicians 1 Chemistry / Radiochemistry Chem/HP Technicians 1 1 1 Plant System Engineering Technical Support Electrical 1 1 1 Mechanical 1 1 1 Engineering Supervisor Core Thermal / Hydraulic 1 Repair and Corrective Repair and Corrective Actions Mechanical Maintenance 1 1 1 Actions Rad Waste Operator 1 1 1 Electrical Maintenance 1 1 1 I&C Technician Protective Actions (In-Plant) Radiation Protection: HP Technicians 2 2 2

a. Access Control
b. HP Coverage for repair, corrective actions, search and rescue first-aid &

firefighting

c. Personnel monitoring
d. Dosimetry Total Augmented ERO 15 15 14