Requalification Program Inspection - Vogtle Electric Generating Plants Units 1 & 2
ML15141A333
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/20/2015
From: Eugene Guthrie
NRC/RGN-II/DRS/EB
To: Taber B
Southern Nuclear Operating Co
References
Download: ML15141A333 (6)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 20, 2015 Mr. Brian K. Taber, VP Nuclear Plant Site Southern Nuclear Operating Co., Inc.

Vogtle Electric Generating Plant 7821 River Road Waynesboro, GA 30830

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - VOGTLE ELECTRIC GENERATING PLANT UNITS 1 & 2

Dear Mr. Taber:

In a telephone conversation on May 14, 2015, Mr. Bruno Caballero, Senior Operations Engineer, Mr. Darren Stiles, Operations Training Manager and Mr. Keith Lewis, Licensed Operator Requalification Supervisor, made arrangements for the NRC to inspect the licensed operator requalification program at Vogtle Electric Generating Plant Units 1 & 2. The inspection is planned for the week of August 23, 2015, which coincides with your regularly scheduled requalification examination cycle. The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program. It is our understanding that you have committed to maintain your plant-referenced simulator in accordance with ANSI/ANS-3.5-1985, American National Standard for Nuclear Power Plant Simulators for Use in Operator Training and Examination, and that you have also committed to ANSI/ANS-3.4-1983, Medical Certification and Monitoring of Personnel Requiring Operator Licenses for Nuclear Power Plants.

In accordance with 10 CFR 55.59, the NRC has requested that you submit the material by the due dates specified in paragraph A of the Enclosure, in order to support the NRC's in-office inspection program needs. The NRC has further requested that you have all items as specified in paragraph B of the Enclosure available for review for the inspectors on the first day they arrive on site. Mr. Darren Stiles has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number Part 55 (3150-0018), which expires on April 30, 2016.

The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by Internet electronic mail at infocollectsresource@nrc.gov;

B. Taber 2 and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB approval number.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html. (The Public Electronic Reading Room).

Thank you for your cooperation in this matter. If you have any questions regarding this inspection please contact Mr. Bruno Caballero at (404) 997-4608, (Internet E-mail:

Bruno.Caballero@nrc.gov), or me at (404) 997-4662, (Internet E-mail:

Eugene.Guthrie@nrc.gov).

Sincerely,

/RA/

Eugene F. Guthrie, Chief Operations Branch 2 Division of Reactor Safety Docket Nos.: 50-424, 50-425 License Nos.: NPF-68, NPF-81

Enclosure:

Materials Request List cc: Distribution via Listserv

__ML15141A333______________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE BLC2 EFG NAME CABALLERO GUTHRIE DATE 5/18/2015 5/2015 5/ /2015 5/ /2015 5/ /2015 5/ /2015 5/ /2015 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Materials Request List The items listed below are necessary to support the Licensed Operator Requalification Program inspection (IP-71111.11) in August 2015 at Vogtle Electric Generating Plants Units 1 & 2. Items listed under In-office inspection material must be received in the NRC Region II office by the due dates specified below. Items listed under On-site inspection material should be ready for review upon arrival of the inspectors on Sunday, August 23, 2015.

A. In-office inspection material:

1. List of all licensed individuals (active and inactive; RO and SRO) including license restrictions. [June 1, 2015]
2. Organizational Chart for the training department, including the simulator fidelity staff, with phone number/email contact information. [June 1, 2015]
3. Weekly examination schedules for the weeks that the 2015 annual operating exams will be administered, including a list of personnel scheduled for testing the week of August 23, 2015. [June 1, 2015]
4. All 2014 biennial written examinations, final answer keys, re-take examinations, and spreadsheets or outlines that show the usage of written examination questions on the different versions of these written examinations. [June 1, 2015]
5. Site procedure(s) governing the conduct (process and content) of license operator requalification training (classroom and simulator), examination development/administration, remedial training, and examination security. [June 1, 2015]
6. Site procedure(s) governing simulator configuration control, maintenance, and fidelity testing methods used to fulfill ANSI/ANS 3.5-1985 requirements. [June 1, 2015]
7. All JPMs, including spreadsheets or outlines that show the usage of the JPMs in all of the 2015 Segment 5 annual exam weeks. [June 15, 2015, EXAM SECURITY RELATED]
8. All simulator scenarios that will be administered in the 2015 Segment 5 annual exam weeks, including which scenarios are assigned to a specific week. [July 13, 2015, EXAM SECURITY RELATED]
9. Self-assessment reports, condition reports, and/or Licensee Event Reports, written since September 2013 (last biennial requalification inspection), which document operator errors or performance problems that occurred in the actual plant/main control room, including the corrective actions. [June 15, 2015]

B. On-site inspection material [Due Sunday, August 23, 2015]:

1. Requalification training attendance records for the current two year biennial training cycle.
2. Examination results since last requalification inspection (weekly operating & written examinations); copies of examinations with pass/failure rates outside the average.

Enclosure

2

3. Copies of the simulator scenarios for the inspectors to observe the operating crews and evaluators on Sunday, August 23 and Monday, August 24, 2015.
4. All remedial training documentation for any licensed operator that failed an examination since the last requalification inspection, i.e., since September 2013.
5. List of all operators that reactivated their licenses since the last requalification inspection, i.e., since September 2013.
6. Records that support verification of time on shift under instruction and complete plant tours for both the reactivating operator and the supervising active license, including:
a. Documentation of time on shift under instruction.
b. Security system and HP/dosimetry records for plant areas toured by reactivating individual and accompanying licensed operator.
7. Records providing documentation of maintenance of active license status (time on shift) for all licensed operators since last requalification inspection, i.e., since September 2013.
8. Medical records for all licensed (active and inactive) operators.
9. Simulator maintenance and testing records, including:
a. List of all open simulator discrepancies
b. List of all simulator discrepancies closed within the past 12 months
c. List of simulator performance tests
d. Simulator performance testing records and associated documentation