ML20059K195 | 18 September 1990 | Clarifies Auxiliary Feedwater Sys Commitments Concerning Ability of Sys to Prevent Total Loss of Feedwater Following Various Pipe Breaks & Component Failures | |
ML20064A747 | 18 September 1990 | Discusses Response to Generic Ltr 88-17, Loss of Dhr. Development of Appropriate Tech Spec Changes for Reducing Cooling Flow Rate in Process.Changes Will Provide Increased Margin to Vortexing Conditions | |
ML20059H424 | 7 September 1990 | Forwards Performance Improvement Plan Implementation Program Schedule Status as of 900905 | New Project Manager |
ML20059H281 | 7 September 1990 | Forwards Rev 4 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. Rev Creates Std Format for Action Plans Which States Scope, Deliverables & Overall Objectives of Action Plan | |
ML20059F476 | 7 September 1990 | Forwards Rev 5 to Security Training & Qualification Plan.Rev Withheld | |
05000317/LER-1989-023, Advises That Licensee Plans to Complete Detailed Design for Automatic Isolation Sys Upgrade by 910401,per NRC Request for Schedule for Enhancement Implementation as Discussed in LER 89-23 Re Postulated Pipe Rupture | 24 August 1990 | Advises That Licensee Plans to Complete Detailed Design for Automatic Isolation Sys Upgrade by 910401,per NRC Request for Schedule for Enhancement Implementation as Discussed in LER 89-23 Re Postulated Pipe Rupture | |
ML20059B748 | 21 August 1990 | Forwards fitness-for-duty Program Performance Data for Jan-June 1990 | Fitness for Duty |
ML20058Q221 | 14 August 1990 | Forwards Performance Improvement Plan Implementation Program Schedule Status as of 900807.Synopsis of Activities Since Last Update & Updated List of Key Action Plan Info Also Encl | |
ML20058L727 | 1 August 1990 | Forwards Plant Performance Improvement Plan Implementation Program Schedule Status as of 900724 | |
ML20058L881 | 1 August 1990 | Withdraws License Amend Request Changing Tech Spec Pages 3/4 25a & 25b, RCS Pressure-Temp Limitations. Change Would Have Revised Min Reactor Vessel Flange bolt-up Temp from 70 F to 90 F | |
ML20058L215 | 27 July 1990 | Responds to NRC Re Unresolved Item Noted in Insp Repts 50-317/90-80 & 50-318/90-80.Corrective Action: Evaluation of Battery Charger Determined That Provisions Adequately Verify Requirements of Tech Spec 4.8.2.3.2 | Safe Shutdown |
ML20055H924 | 26 July 1990 | Forwards Decommissioning Plan for Calvert Cliffs Isfsi | |
ML20055G998 | 20 July 1990 | Responds to NRC Re Generic Implications & Resolution of Control Element Assembly Failure at Plant on 900607.New Control Element Assemblies Ordered.Addl Response Will Be Submitted at Least 60 Days Prior to Restart | |
ML20044B040 | 13 July 1990 | Forwards Rev 3 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. Brief Summary of Changes Listed | |
ML20055E080 | 3 July 1990 | Responds to NRC Re Violations Noted in Insp Repts 50-317/90-08 & 50-318/90-08.Corrective Actions:Instruction CCI-309B Re Control of Locked Valve Revised to Clarify Required Documentation and Verification of Locked Valves | |
ML19298E227 | 29 June 1990 | Confirms That Work Intended to Resolve Unresolved Items & Incorporate Improvement Suggestions Completed,Per Insp Repts 50-317/90-04 & 50-318/90-04 | |
ML20055D031 | 25 June 1990 | Submits Corrections to Commitments Re Hydrogen Analyzer Sys. Under Worst Case Condition,Hydrogen Recombiners Would Be Started Prior to Hydrogen Concentration Inside Containment Reaching 3.0% Hydrogen | Grab sample |
ML20043G177 | 12 June 1990 | Forwards Monthly Operating Repts for May 1990 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 & Revised Operating Rept for Apr 1990 for Calvert Cliffs Unit 1 | |
ML20043G593 | 8 June 1990 | Requests one-time Exemption from Requirement of 10CFR50.71(e) to Allow 3-month Extension to Schedule for Submitting 1990 Rev to Updated Fsar,Per NRC 1989 QA Audit & Insp Repts 50-317/89-27 & 50-318/89-28 Noting Weaknesses | |
ML20043F710 | 6 June 1990 | Suppls 900330 Response to Station Blackout Rule (10CFR50.63).Two Addl Class 1E Diesel Generators Added to Reduce Required Coping Duration.Required Coping Duration Is 4 H for One Unit | |
ML20043D728 | 4 June 1990 | Responds to NRC 900404 Ltr Re Weaknessess Noted in Maint Team Insp Repts 50-317/90-80 & 50-318/90-80.Efforts to Clean,Insulate & Paint Plant Areas to Improve Cleanliness Being Undertaken | |
ML20043C905 | 31 May 1990 | Notifies of Relocation of Ofcs,Effective 900604.New Addresses & Telephone Numbers Listed | |
ML20043C597 | 29 May 1990 | Forwards Startup Review Board Self-Assessment Rept:Apr 1990 Unit 1 Startup. Based on Assessment,Mgt Efforts Taken Through Performance Improvement Plan Appears Substantially on Track | Boric Acid |
ML20043B934 | 25 May 1990 | Advises of Licensee Progress to Date Re Unresolved Item Noted in Inps Repts 50-317/90-04 & 50-318/90-04 & Identify Slippage Past 900601 Target Date.Completion Date Extended to 900701 | |
ML20043B469 | 21 May 1990 | Reaffirms Licensee Intention to Submit Rept Re Deletion of Tech Spec 3/4.6.1.8, Containment Sys - Containment Vent Sys, Upon Receiving Notification That Vent Valves 1(2)-MOV-6900 & 1(2)-MOV-6901 Established | |
ML20043A338 | 15 May 1990 | Responds to NRC 900409 Ltr Re Violations Noted in Insp Repts 50-317/90-01 & 50-318/90-01.Corrective Actions:Detailed & Specific Directions for Radiography Will Be Incorporated in Radiography Procedures within NDE Program | Nondestructive Examination Condition Adverse to Quality |
ML20043A332 | 14 May 1990 | Responds to SALP Rept Dtd 900404 Covering Util Performance During 1989.Feedback Mechanisms Established to Improve Training & 10CFR50.59 Screening Procedure & Training Revised | |
ML20042G375 | 10 May 1990 | Forwards Changes 1-3 to Rev 0 to Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Plant,Units 1 & 2. Plan Revised to Include Volumetric & Surface Exams of Class 2 Piping Welds in Containment Spray & Shutdown Cooling Sys | |
ML20042G614 | 5 May 1990 | Requests Regional Temporary Waiver of Compliance to Provide Relief from Provision of Limiting Condition for Operation of Tech Spec 3.4.10.1, Structural Integrity of ASME Code Class 1,2 & 3 Sys. | Biofouling |
ML20042F577 | 4 May 1990 | Responds to NRC 900404 Ltr Re Violations Noted in Insp Repts 50-317/90-80 & 50-318/90-80.Corrective Actions:Surveillance Test Procedure M-538-1 Revised to Include Verification of Alarm Function & Alarm Testing Reviewed | |
ML20042G458 | 4 May 1990 | Responds to Request for Addl Info Concerning Tech Spec Amend Re Emergency Diesel Generators.Preventive Maint Procedures Prepared on 900411 & Final Approval Will Be Completed After Issuance of Amend | Grace period |
ML20042E827 | 30 April 1990 | Forwards Rev 2 to Calvert Cliffs Performance Improvement Plan Implementation Program. Accountability Improvements, Engineering Planning & Sys Circles Action Plans Completed. New Sections to Rev Listed | |
ML20042F010 | 30 April 1990 | Forwards Update of Tables 1C,2A,2B,3A & Page 7 of Semiannual Effluent Release Rept for Second Half of 1989 & Table 3A for Second Half of 1988 & First Half of 1989.Update Includes Strontium Results for Fourth Quarter for Gaseous Releases | |
ML20042F039 | 19 April 1990 | Submits Initial Response to SALP Rept Dtd 900404.Licensee Devoted Substantial Senior Mgt Attention & Resources to Improving Facility Performance & Committed to Continue Efforts to Attain High Stds of Safety & Quality | |
ML20012F551 | 6 April 1990 | Responds to NRC 900306 Ltr Re Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Corrective Actions:Operating Procedures Changed to Prohibit Testing of ECCS When in Solid Water Condition | |
ML20012F299 | 4 April 1990 | Revises Scheduled Completion Date for Implementation of Computerized Trending of Surveillance Test Data,In Response to Special Team Insp Repts 50-317/89-200 & 50-318/89-200 from 900601 to 901228 | |
ML20042D810 | 30 March 1990 | Forwards Supplemental Info,Clarifying Util 890414 Response to Station Blackout Rule Noting That Util Followed NUMAR-87-00 Methodology | |
ML20012F021 | 29 March 1990 | Responds to NRC 900227 Ltr Re Violations Noted in Insp Rept 50-317/89-25.Corrective Actions:Plugging Error Identified & Correct Tube Plugged & Corrective Action Procedures Revised | |
ML20012D311 | 19 March 1990 | Provides Followup Response to Violation Noted in Insp Repts 50-317/89-24 & 50-318/89-24.Corrective Actions:Radiation Safety Technicians Responsible for Safety Procedures Trained in Jan 1990 & Radwaste Scaling Factors Approved on 900201 | |
ML20012D187 | 16 March 1990 | Discusses Readiness for Restart of Facility | Safe Shutdown |
ML20012B912 | 9 March 1990 | Withdraws 891113 Request for Relief from ASME Code Section XI Requirements | |
ML20012B922 | 9 March 1990 | Responds to NRC 900207 Ltr Re Violations Noted in Insp Repts 50-317/89-27 & 50-318/89-28.Corrective Actions:Demineralized Water & Chemicals Added to Steam Generators to Restore Chemical Concentrations to Required Specs | Safe Shutdown |
ML20012B611 | 7 March 1990 | Responds to NRC 900229 Ltr Re Violations Noted in Readiness Assessment Team Insp Rept 50-317/89-81.Corrective Actions: Memo Issued re-emphasizing Importance of Mgt Controls & General Supervisor Counselled | |
ML20012D727 | 5 March 1990 | Responds to Violations Noted in Insp Repts 50-317/90-03 & 50-318/90-03 on 900108-12.Corrective Actions:Medical Svcs Tested All Members of Nuclear Security Force for Glaucoma & field-of-vision Requirements | |
ML20011F425 | 1 March 1990 | Forwards Page 4-9 of Rev 25 to Security Plan,Originally Submitted on 900228.Encl Withheld (Ref 10CFR73.21) | |
ML20012A153 | 28 February 1990 | Forwards Rev 11 to Safeguards Contingency Plan & Details of Changes Made by Rev.Encls Withheld (Ref 10CFR73.21) | |
ML20012A148 | 28 February 1990 | Forwards Rev 25 to Security Plan & Details of Changes Made by Rev.Encls Withheld (Ref 10CFR73.21) | |
ML20011F449 | 28 February 1990 | Forwards 1989 Steam Generator Insp Results Rept.Rept Includes Number & Extent of Tubes Examined,Imperfections Noted & Identity of Tubes Plugged.No Steam Generator Tube Exams Conducted on Unit 1 During 1989 | |
ML20011F414 | 27 February 1990 | Forwards Rev 2 to, Evacuation Time Estimates within Plume Exposure Pathway EPZ for Calvert Cliffs Nuclear Power Plant. Evacuation Time Estimates Updated to Reflect Population & Road Network Changes Since 1981 | |
ML20012A233 | 26 February 1990 | Advises That Erosion/Corrosion Program Controlling Implementing Procedure 5.05, Secondary Sys Piping Erosion/ Corrosion Insp Program, Fully Implemented on 891229 |