Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217N928 | 20 October 1999 | Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised | |
ML20217H363 | 14 October 1999 | Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su | |
ML18152A281 | 12 October 1999 | Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. | Liquid penetrant |
ML20212J925 | 1 October 1999 | Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant | VT-2 |
ML18152B353 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Surry Power Station,Units 1 & 2.With 991012 Ltr | Reserve Station Service Transformer |
ML20217D685 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With | |
RBG-45144, Monthly Operating Rept for Sept 1999 for River Bend Station. with | 30 September 1999 | Monthly Operating Rept for Sept 1999 for River Bend Station. with | |
ML20216G120 | 9 September 1999 | Rev 3 to Rbs,Cycle 9 Colr | Shutdown Margin Anticipated operational occurrence |
ML20211N261 | 8 September 1999 | Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable | |
ML18152B665 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Surry Power Station Units 1 & 2.With 990915 Ltr | Temporary Modification |
ML20216E501 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with | |
ML20211J256 | 31 August 1999 | Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 | |
ML20211J242 | 31 August 1999 | Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 | Earthquake |
RBG-45110, Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With | 31 August 1999 | Monthly Operating Rept for Aug 1999 for River Bend Station, Unit 1.With | |
ML18152B441 | 27 August 1999 | LER 99-005-00:on 990731,effluent Radiation Monitors Were Declared Inoperable.Caused by Degraded Heat Trace Circuits for Monitors Sample Suction Line.Degraded Heat Trace Circuit Was Replaced & Addl Heat Trace Is Being Installed | |
ML18152B442 | 27 August 1999 | LER 99-006-00:on 990802,determined That Plant Was Outside of App R Design Basis Due to Fire Barrier Deficiencies. Caused by Original Plant Design Deficiencies.Fire Watches Were Established & Mods Have Been Completed.With 990827 Ltr | Safe Shutdown Fire Barrier Fire Watch |
ML18152B377 | 13 August 1999 | LER 99-004-00:on 990714,TS Violation Due to non-safety Related Fans Effect on CR Boundary Was Noted.Cause of Event Has Not Yet Been Determined.Cable Spreading Room Doors Were Operned to Reduce Pressure in Rooms | |
ML18151A398 | 13 August 1999 | SPS Unit 2 ISI Summary Rept for 1999 Refueling Outage. | Hydrostatic |
ML20210T079 | 13 August 1999 | Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable | |
RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection | 6 August 1999 | Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection | |
ML20210K472 | 3 August 1999 | SER Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves | Power-Operated Valves Backfit |
RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With | 31 July 1999 | Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With | |
ML18152B379 | 31 July 1999 | Monthly Operating Repts for July 1999 for Surry Power Station,Units 1 & 2.With 990811 Ltr | Temporary Modification Biofouling |
ML20210S141 | 31 July 1999 | Monthly Operating Repts for July 1999 for North Anna Power Station.With | |
ML20210Q993 | 31 July 1999 | Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud | |
ML20210C639 | 2 July 1999 | Rev 2 to River Bend Station,Cycle 9 Colr | |
RBG-45055, Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With | 30 June 1999 | Monthly Operating Rept for June 1999 for River Bend Station, Unit 1.With | |
ML18152B391 | 30 June 1999 | Monthly Operating Repts for June 1999 for Surry Power Station,Units 1 & 2.With 990713 Ltr | |
ML20209E564 | 30 June 1999 | Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With | |
ML20196J803 | 24 June 1999 | Rev 1 to Rbs,Cycle 9 Colr | |
ML20195G190 | 31 May 1999 | Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with | |
ML18152B434 | 31 May 1999 | Monthly Operating Repts for May 1999 for Surry Power Station,Units 1 & 2.With 990614 Ltr | Temporary Modification Biofouling |
ML20195E240 | 31 May 1999 | Rev 2 to COLR for SPS Unit 2 Cycle 16 Pattern Ag | |
RBG-45028, Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With | 31 May 1999 | Monthly Operating Rept for May 1999 for River Bend Station, Unit 1.With | |
ML18152B418 | 18 May 1999 | LER 99-002-00:on 990425,MSSVs Tested Out of Tolerance for as Found Setpoint.Caused by Minor Setpoint Drift.No Immediate Action Required.Deviation Rept Submitted for Each Valve.With 990518 Ltr | Time of Discovery |
ML20206L483 | 10 May 1999 | SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping | Probabilistic Risk Assessment Incorporated by reference |
ML18152B416 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 990512 Ltr | Temporary Modification |
ML20206Q667 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With | |
RBG-45016, Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With | 30 April 1999 | Monthly Operating Rept for Apr 1999 for River Bend Station, Unit 1.With | |
ML18152B411 | 28 April 1999 | LER 99-003-00:on 990331,potential Loss of Charging Pumps Was Noted.Caused by Main CR Fire.Station Deviation Was Issued on 990331.With 990428 Ltr | Safe Shutdown Fire Protection Program Fire Watch Hourly Fire Watch |
ML20205S039 | 21 April 1999 | SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) | Nondestructive Examination VT-2 Moisture barrier |
ML20206A211 | 21 April 1999 | Safety Evaluation Authorizing Pump Relief Request PRR-001 & Valve Relief Request VRR-001 & Denying Valve Relief Request VRR-002 | Stroke time Incorporated by reference Power-Operated Valves |
ML20205K304 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20205S060 | 31 March 1999 | Rept on Status of Public Petitions Under 10CFR2.206 with Status Change from Previous Update,990331 | Fuel cladding |
ML18152B651 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2 | |
RBG-44969, Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With | 31 March 1999 | Monthly Operating Rept for Mar 1999 for River Bend Station, Unit 1.With | |
ML18153A274 | 29 March 1999 | LER 99-002-00:on 990301,prematurely Released Fire Watches Resulted in Violation of TS 3.21.B.7.Caused by Inadequate Procedure.Procedure for Opening & Sealing Fire Stops Was Revised on 990212 | Fire Barrier Fire Protection Program Fire Watch |
ML20205D548 | 26 March 1999 | SER Accepting Util Proposed Alternative to Exam Weld AA with Weld Volume Coverage of 62 Percent for First 10-year Insp Interval Pursuant to 10CFR50.55a(a)(3)(ii) & 10CFR50.55a(g)(6)(ii)(A)(5) | Incorporated by reference |
ML18153A268 | 19 March 1999 | LER 98-013-01:on 981122,turbine/reactor Tripped on High Due to Short Circuit in Summator for MSL C Loop Channel III Flow Transmitter.Replaced 1-MS-FT1494 Summator & Module Repair Procedure Revised.With 9903190 Ltr | Shutdown Margin |
ML20207K592 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With |