Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217E302 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Pilgrim Nuclear Station.With | |
ML20212C292 | 16 September 1999 | SER Accepting Licensee Request for Relief from ASME Code Section XI Requirements as Endorsed by 10CFR50.55a for Containment Insp for Pilgrim Nuclear Power Station | Coatings Nondestructive Examination Incorporated by reference |
ML20216F351 | 8 September 1999 | ISI Summary Rept for Refuel Outage 12 at Pnps | VT-2 Moisture barrier EVT-1 |
ML20216E688 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Pilgrim Nuclear Power Station.With | |
ML20210R340 | 31 July 1999 | Monthly Operating Rept for July 1999 for Pilgrim Nuclear Power Station.With | |
ML20209C473 | 7 July 1999 | Addendum to SE on Proposed Transfer of Operating License & Matls License from Boston Edison Co to Entergy Nuclear Generation Co | |
ML20209H825 | 1 July 1999 | Provides Commission with Evaluation of & Recommendations for Improvement in Processes Used in Staff Review & Approval of Applications for Transfer of Operating Licenses of TMI-1 & Pilgrim Station | |
ML20209E619 | 30 June 1999 | Monthly Operating Rept for June 1999 for Pilgrim Nuclear Power Station.With | |
ML20196H245 | 29 June 1999 | SER Denying Licensee Proposed Alternative in Relief Request PRR-13,rev 2.Staff Determined That Proposed Alternative Provides Insufficient Info to Determine Adequacy of Scope of Implementation | Hydrostatic VT-2 Incorporated by reference Through-Wall Leak |
ML20209A890 | 28 June 1999 | SER Accepting Licensee Proposed Alternative to Use Code Case N-573 for Remainder of 10-year Interval Pursuant to 10CFR50.55a(a)(3)(i) | |
ML20209B986 | 23 June 1999 | Rev 13A to Pilgrim Nuclear Power Station COLR for Cycle 13 | |
ML20217N906 | 21 June 1999 | Rept of Changes,Tests & Experiments for Period of 970422-990621 | Safe Shutdown Shutdown Margin Ultimate heat sink Mission time Stroke time Emergency Lighting Abnormal operational transient Feedwater Controller Failure Fuel cladding |
ML20195K343 | 15 June 1999 | Safety Evaluation Granting Licensee Request to Use Guidance of GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water System Piping for Plant | Ultimate heat sink Weld Overlay Through-Wall Leak |
ML20195G823 | 31 May 1999 | Monthly Operating Rept for May 1999 for Pnps.With | |
ML20207E747 | 27 May 1999 | Safety Evaluation Granting Request Re Reduction of IGSCC Insp of Category D Welds Due to Implementation of HWC to License DPR-35 | |
ML20206M197 | 11 May 1999 | SER Accepting Request for Approval to Repair Flaws in ASME Code Class 3 Salt Svc Water Piping at Plant | Ultimate heat sink Weld Overlay Through-Wall Leak |
ML20206J661 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Pilgrim Nuclear Power Station.With | |
ML20205L022 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Pilgrim Nuclear Power Station.With | |
ML20207J547 | 9 March 1999 | Training Simulator,1999 4-Yr Certification Rept | |
ML20207F940 | 1 March 1999 | Long Term Program Semi-Annual Rept for Pilgrim Nuclear Power Station | Safe Shutdown Ultimate heat sink Coatings Foreign Material Exclusion Scram Discharge Volume Severe Accident Management Guideline Downpower |
ML20207H545 | 28 February 1999 | Monthly Operating Rept for Feb 1999 for Pilgrim Nuclear Power Station.With | |
ML20196E215 | 31 December 1998 | 1998 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept.With | Incorporated by reference |
ML20206Q274 | 31 December 1998 | Monthly Operating Rept for Dec 1998 for Pilgrim Nuclear Power Station.With | |
ML20197J359 | 30 November 1998 | Monthly Operating Rept for Nov 1998 for Pilgrim Nuclear Power Station.With | |
ML20195C995 | 31 October 1998 | Monthly Operating Rept for Oct 1998 for Pilgrim Nuclear Power Station.With | |
ML20154K072 | 30 September 1998 | Monthly Operating Rept for Sept 1998 for Pilgrim Nuclear Power Station.With | |
ML20153D390 | 22 September 1998 | Safety Evaluation Granting 970707 Request to Use Guidance in GL 90-05 to Repair Flaws in ASME Class 3 Salt Svc Water Sys Piping for Pilgrim Nuclear Power Station | Ultimate heat sink |
ML20197C501 | 4 September 1998 | Rev 12C,Pages 4 & 5 to Pilgrim Nuclear Power Station Colr | |
ML20197C547 | 31 August 1998 | Rev 12C to Pilgrim Nuclear Power Station Colr | |
ML20151W823 | 31 August 1998 | Monthly Operating Rept for Aug 1998 for Pilgrim Nuclear Power Station.With | |
ML20237E225 | 26 August 1998 | Suppl & Revs to SE for Amend 173 for Pigrim Nuclear Power Station | |
ML20237A994 | 31 July 1998 | Monthly Operating Rept for Pilgrim Nuclear Power Station | |
ML20236U820 | 13 July 1998 | Rev 12B to Pilgrim Nuclear Power Station COLR (Cycle 12) | |
ML20236P015 | 30 June 1998 | Monthly Operating Rept for June 1998 for Pilgrim Nuclear Power Station | |
ML20249A374 | 31 May 1998 | Monthly Operating Rept for May 1998 for Pilgrim Nuclear Power Station.W/Undated Ltr | |
ML20247H208 | 30 April 1998 | Monthly Operating Rept for Apr 1998 for Pilgrim Nuclear Power Station | |
ML20216G391 | 31 March 1998 | Monthly Operating Rept for Mar 1998 for Pilgrim Nuclear Power Station | |
ML20207B760 | 31 March 1998 | Final Rept, Pilgrim Nuclear Power Station Site-Specific Offsite Radiological Emergency Preparedenss Prompt Alert & Notification System Quality Assurance Verification, Prepared for FEMA | |
ML20216J374 | 19 March 1998 | Safety Evaluation Accepting Licensee Request to Evaluate Elevated Tailpipe Temp on Safety Relief Valve SRV 203-3B | |
ML20248L224 | 28 February 1998 | Monthly Operating Rept for Feb 1998 for Pilgrim Nuclear Station | |
ML20202G525 | 31 January 1998 | Monthly Operating Rept for Jan 1998 for Pilgrim Nuclear Power Station | |
ML20198L770 | 31 December 1997 | Monthly Operating Rept for Dec 1997 for Pilgrim Nuclear Power Station | |
ML20236M851 | 31 December 1997 | 1997 Annual Rept for Boston Edison & Securities & Exchange Commission Form 10-K Rept | Incorporated by reference |
ML20203D610 | 30 November 1997 | Monthly Operating Rept for Nov 1997 for Pilgrim Nuclear Power Station | |
ML20202D576 | 8 November 1997 | 1997 Evaluated Exercise | |
BECO-LTR-97-111, Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station | 31 October 1997 | Monthly Operating Rept for Oct 1997 for Pilgrim Nuclear Power Station | |
ML20217D643 | 1 October 1997 | Safety Evaluation Granting Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Class 3 SSW Piping for Pilgrim | Ultimate heat sink Through-Wall Leak |
ML20217H562 | 30 September 1997 | Monthly Operating Rept for Sept 1997 for Pilgrim Nuclear Power Station | |
ML20216J413 | 31 August 1997 | Monthly Operating Rept for Aug 1997 for Pilgrim Nuclear Power Station | |
ML20210J332 | 31 July 1997 | Monthly Operating Rept for Jul 1997 for Pilgrim Nuclear Power Station |