Issue date | Title | Topic | |
---|---|---|---|
ML20217N327 | 21 October 1999 | Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised | |
ML20217K993 | 14 October 1999 | Safety Evaluation Supporting Amend 234 to License DPR-56 | |
ML20217B433 | 5 October 1999 | Safety Evaluation Supporting Amend 233 to License DPR-56 | Anticipated operational occurrence Minimum Critical Power Ratio Fuel cladding |
ML20217G354 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with | |
BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with | |
ML20216H709 | 24 September 1999 | Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively | |
ML20212D128 | 17 September 1999 | Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11 | Coatings Nondestructive Examination VT-2 Incorporated by reference |
ML20212D043 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2 | |
ML20212A587 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With | |
ML20211D550 | 23 August 1999 | Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectively | Offsite Dose Calculation Manual |
ML20212H631 | 19 August 1999 | Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13 | Unanalyzed Condition |
ML20210P944 | 10 August 1999 | Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump Risers | Safe Shutdown Earthquake Stress corrosion cracking |
ML20210P918 | 10 August 1999 | Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in Part | Coatings Nondestructive Examination VT-2 Moisture barrier |
ML20210N234 | 5 August 1999 | SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46 | Safe Shutdown Safe Shutdown Earthquake Design basis earthquake Earthquake Manual Operator Action |
ML20210N764 | 31 July 1999 | Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with | |
ML20210R119 | 31 July 1999 | Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2 | |
BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with | 30 June 1999 | Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with | |
ML20209H112 | 30 June 1999 | Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with | |
ML20210R131 | 30 June 1999 | Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2 | |
BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With | 31 May 1999 | Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With | |
ML20195H884 | 31 May 1999 | Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with | |
ML20210M858 | 14 May 1999 | B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0 | Packing leak Hydrostatic Coatings Anchor Darling VT-2 Stress corrosion cracking |
ML20211L371 | 10 May 1999 | Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger Evaluation | Stress corrosion cracking Liquid penetrant Thermal fatigue |
ML20206G187 | 4 May 1999 | Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17 | Incorporated by reference Stress corrosion cracking |
BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With | |
ML20206N166 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with | |
ML20206N179 | 23 April 1999 | Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr | |
ML20206A292 | 20 April 1999 | Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50 | Safe Shutdown Pressure Boundary Leakage |
ML20205K741 | 7 April 1999 | Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively | |
ML20205P585 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With | |
BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With | |
ML20205F903 | 30 March 1999 | Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively | |
BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With | |
ML20207G997 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With | |
ML20206N183 | 28 February 1999 | Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14 | Shutdown Margin Anticipated operational occurrence Power Uprate Affidavit |
ML20203D706 | 9 February 1999 | SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 Denied | Reactor Vessel Water Level Stroke time Incorporated by reference Excess Flow Check Valve Breakaway torque Cold shutdown justification Overspeed trip |
ML20206D365 | 31 December 1998 | 1998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. with | Process Control Program |
ML20206D359 | 31 December 1998 | 1998 PBAPS Annual 10CFR72.48 Rept. with | |
BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With | |
ML20205K038 | 31 December 1998 | PECO Energy 1998 Annual Rept. with | |
ML20199E347 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With | |
ML20206P165 | 31 December 1998 | Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire Detection | Safe Shutdown Fire Barrier Locked High Radiation Area Systematic Assessment of Licensee Performance Exemption Request Fire Protection Program |
ML20196G702 | 2 December 1998 | SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating Cycles | Hydrostatic Incorporated by reference |
BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With | |
ML20198B859 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with | |
ML20196E826 | 30 November 1998 | Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3 | |
ML20206R257 | 17 November 1998 | PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84 | Operating Basis Earthquake Earthquake Fuel cladding |
ML20198C675 | 5 November 1998 | Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12 | |
BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with | |
ML20195E534 | 31 October 1998 | Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with |