Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217N32721 October 1999Part 21 Rept Re non-linear Oxygen Readings with Two (2) Model 225 CMA-X Containment Monitoring Sys at Bsep.Caused by High Gain Produced by 10K Resistor Across Second Stage Amplifier.Engineering Drawings Will Be Revised
ML20217K99314 October 1999Safety Evaluation Supporting Amend 234 to License DPR-56
ML20217B4335 October 1999Safety Evaluation Supporting Amend 233 to License DPR-56Anticipated operational occurrence
Minimum Critical Power Ratio
Fuel cladding
ML20217G35430 September 1999Monthly Operating Repts for Sept 1999 for Pbaps,Units 2 & 3. with
BSEP-99-0168, Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with30 September 1999Monthly Operating Repts for Sept 1999 for Bsep,Units 1 & 2. with
ML20216H70924 September 1999Safety Evaluation Supporting Amends 229 & 232 to Licenses DPR-44 & DPR-56,respectively
ML20212D12817 September 1999Safety Evaluation Supporting Proposed Alternatives CRR-03, 05,08,09,10 & 11Coatings
Nondestructive Examination
VT-2
Incorporated by reference
ML20212D04331 August 1999Monthly Operating Repts for Aug 1999 for Brunswick Steam Electric Plant,Units 1 & 2
ML20212A58731 August 1999Monthly Operating Repts for Aug 1999 for Peach Bottom,Units 2 & 3.With
ML20211D55023 August 1999Safety Evaluation Supporting Amends 228 & 231 to Licenses DPR-44 & DPR-56,respectivelyOffsite Dose Calculation Manual
ML20212H63119 August 1999Rev 2 to PECO-COLR-P2C13, COLR for Pbaps,Unit 2,Reload 12 Cycle 13Unanalyzed Condition
ML20210P94410 August 1999Safety Evaluation Accepting Licensee Assessment of Impact on Operation of Plant,Unit 1,with Crack Indications of 2.11, 6.36 & 1.74 Inches in Three Separate Jet Pump RisersSafe Shutdown Earthquake
Stress corrosion cracking
ML20210P91810 August 1999Safety Evaluation Authorizing Request for Reliefs CIP-01,02, 06,07,08,09,10 & 11 (with Certain Exceptions) & 12-18,for Second 10-year ISI Interval.Request CIP-04 & 05 Would Result in hardship,CIP-03 Not Required & CIP-11 Denied in PartCoatings
Nondestructive Examination
VT-2
Moisture barrier
ML20210N2345 August 1999SER Accepting Response to NRC GL 87-02, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issues (USI) A-46Safe Shutdown
Safe Shutdown Earthquake
Design basis earthquake
Earthquake
Manual Operator Action
ML20210N76431 July 1999Monthly Operating Repts for Jul 1999 for PBAPS Units 2 & 3. with
ML20210R11931 July 1999Monthly Operating Repts for July 1999 for Bsep,Units 1 & 2
BSEP-99-0118, Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with30 June 1999Monthly Operating Repts for June 1999 for Bsep,Units 1 & 2. with
ML20209H11230 June 1999Monthly Operating Repts for June 1999 for Pbaps,Units 2 & 3. with
ML20210R13130 June 1999Revised Monthly Operating Rept for June 1999 for Bsep,Unit 2
BSEP-99-0095, Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With31 May 1999Monthly Operating Repts for May 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20195H88431 May 1999Monthly Operating Repts for May 1999 for Pbaps,Units 2 & 3. with
ML20210M85814 May 1999B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, Rev 0Packing leak
Hydrostatic
Coatings
Anchor Darling
VT-2
Stress corrosion cracking
ML20211L37110 May 1999Rev 0 to ESR 98-00333, Unit 2 Invessel Feedwater Sparger EvaluationStress corrosion cracking
Liquid penetrant
Thermal fatigue
ML20206G1874 May 1999Safety Evaluation Approving Third 10-year ISI Program Requests for Relief (RR) RR-08,RR-15 & RR-17Incorporated by reference
Stress corrosion cracking
BSEP-99-0075, Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With30 April 1999Monthly Operating Repts for Apr 1999 for Brunswick Steam Electric Plant,Unit 1 & 2.With
ML20206N16630 April 1999Monthly Operating Repts for Apr 1999 for Pbaps,Units 2 & 3. with
ML20206N17923 April 1999Rev 0 to 2B21-0554, Brunswick Unit 2,Cycle 14 Colr
ML20206A29220 April 1999Safety Evaluation Concluding That Proposed Changes to EALs for PBAPS Are Consistent with Guidance in NUMARC/NESP-007 & Identified Deviations Meet Requirements of 10CFR50.47(b)(4) & App E to 10CFR50Safe Shutdown
Pressure Boundary Leakage
ML20205K7417 April 1999Safety Evaluation Supporting Amends 227 & 230 to Licenses DPR-44 & DPR-56,respectively
ML20205P58531 March 1999Monthly Operating Repts for Mar 1999 for Peach Bottom Units 2 & 3.With
BSEP-99-0059, Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With31 March 1999Monthly Operating Repts for Mar 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20205F90330 March 1999Safety Evaluation Supporting Proposed Rev to BSEP RERP to Licenses DPR-62 & DPR-71,respectively
BSEP-99-0043, Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With28 February 1999Monthly Operating Repts for Feb 1999 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20207G99728 February 1999Monthly Operating Repts for Feb 1999 for Peach Bottom Units 2 & 3.With
ML20206N18328 February 1999Rev 0 to Suppl Reload Licensing Rept for Bsep,Unit 2 Reload 13 Cycle 14Shutdown Margin
Anticipated operational occurrence
Power Uprate
Affidavit
ML20203D7069 February 1999SER Accepting Proposed Alternatives Contained in Relief Requests PRR-04,VRR-04,VRR-13,PRR-01,PRR-03,VRR-01.VRR-07, VRR-08 & VRR-09 DeniedReactor Vessel Water Level
Stroke time
Incorporated by reference
Excess Flow Check Valve
Breakaway torque
Cold shutdown justification
Overspeed trip
ML20206D36531 December 19981998 PBAPS Annual 10CFR50.59 & Commitment Rev Rept. withProcess Control Program
ML20206D35931 December 19981998 PBAPS Annual 10CFR72.48 Rept. with
BSEP-99-0005, Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With31 December 1998Monthly Operating Repts for Dec 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20205K03831 December 1998PECO Energy 1998 Annual Rept. with
ML20199E34731 December 1998Monthly Operating Repts for Dec 1998 for Peach Bottom,Units 1 & 2.With
ML20206P16531 December 1998Fire Protection for Operating Nuclear Power Plants, Section Iii.F, Automatic Fire DetectionSafe Shutdown
Fire Barrier
Locked High Radiation Area
Systematic Assessment of Licensee Performance
Exemption Request
Fire Protection Program
ML20196G7022 December 1998SER Authorizing Proposed Alternative to Delay Exam of Reactor Pressure Vessel Shell Circumferential Welds by Two Operating CyclesHydrostatic
Incorporated by reference
BSEP-98-0231, Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With30 November 1998Monthly Operating Repts for Nov 1998 for Brunswick Steam Electric Plant,Units 1 & 2.With
ML20198B85930 November 1998Monthly Operating Repts for Nov 1998 for Pbaps,Units 2 & 3. with
ML20196E82630 November 1998Response to NRC RAI Re Reactor Pressure Vessel Structural Integrity at Peach Bottom Units 2 & 3
ML20206R25717 November 1998PBAPS Graded Exercise Scenario Manual (Sections 1.0 - 5.0) Emergency Preparedness 981117 Scenario P84Operating Basis Earthquake
Earthquake
Fuel cladding
ML20198C6755 November 1998Rev 3 to COLR for PBAPS Unit 3,Reload 11,Cycle 12
BSEP-98-0218, Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with31 October 1998Monthly Operating Repts for Oct 1998 for Bsep,Units 1 & 2. with
ML20195E53431 October 1998Monthly Operating Repts for Oct 1998 for Pbaps,Units 2 & 3. with