Issue date | Title | Topic | |
---|---|---|---|
ML18066A690 | 1 November 1999 | Rev 5 to Palisades Nuclear Plant Colr. | Shutdown Margin |
ML20217F289 | 13 October 1999 | Drill 99-08 Emergency Preparedness Exercise on 991013 | Grab sample |
ML17241A489 | 7 October 1999 | LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr | |
ML17241A495 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr | |
ML18066A676 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant | |
ML20217G721 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with | |
ML20217E338 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3 | |
ML20212A147 | 13 September 1999 | Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established | |
ML20211N051 | 3 September 1999 | SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design Basis | Severe Accident Management Guideline Exemption Request Fuel cladding |
ML18066A627 | 2 September 1999 | LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr | |
ML17241A474 | 31 August 1999 | Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr. | |
ML17241A459 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr | |
ML18066A635 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant | |
ML18066A677 | 31 August 1999 | Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant | |
ML20211Q214 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With | |
ML20211Q820 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with | |
ML20211H862 | 23 August 1999 | Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI Interval | Coatings |
ML18066A622 | 20 August 1999 | LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr | |
ML20210P473 | 11 August 1999 | COLR Cycle 10 Songs,Unit 2 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20210P479 | 11 August 1999 | COLR Cycle 10 Songs,Unit 3 | Shutdown Margin Anticipated operational occurrence Fuel cladding |
ML20210Q652 | 31 July 1999 | Monthly Operating Repts for July 1999 for Songs,Units 2 & 3 | |
ML20210S058 | 31 July 1999 | Monthly Operating Rept for July 1999 for Waterford 3.With | |
ML20210Q636 | 31 July 1999 | Corrected Monthly Operating Rept for July 1999 for Waterford 3 | |
ML18066A606 | 31 July 1999 | Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr | |
ML17241A430 | 31 July 1999 | Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr | |
ML20210L277 | 30 July 1999 | SONGS Unit 3 ISI Summary Rept 2nd Interval,2nd Period Cycle 10 Refueling Outage U3C10 Site Technical Services | Nondestructive Examination VT-2 Liquid penetrant |
ML20210D895 | 23 July 1999 | Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020 | |
ML17241A411 | 16 July 1999 | LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr | |
ML17241A404 | 6 July 1999 | LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 Ltr | Rod Drop Event |
ML17241A403 | 6 July 1999 | LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 Ltr | Shutdown Margin |
ML18066A520 | 30 June 1999 | Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr | |
ML17241A409 | 30 June 1999 | Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr | |
ML17241A394 | 30 June 1999 | LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr | |
ML17355A368 | 30 June 1999 | Revised Update to Topical QA Rept, Dtd June 1999 | Safe Shutdown Non-Destructive Examination Fire Barrier Commercial Grade Dedication Coatings Nondestructive Examination Condition Adverse to Quality License Renewal Control of Heavy Loads Early Warning Fire Detection |
ML20209H378 | 30 June 1999 | Monthly Operating Rept for June 1999 for Waterford 3 Ses. with | |
ML20209C928 | 30 June 1999 | Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with | |
ML20195J895 | 17 June 1999 | Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii) | Incorporated by reference |
ML17241A355 | 4 June 1999 | LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr | |
ML20207E863 | 3 June 1999 | Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3 | |
ML20195D306 | 2 June 1999 | Safety Evaluation of TR SCE-9801-P, Reload Analysis Methodology for San Onofre Nuclear Generating Station,Units 2 & 3. Rept Acceptable | Shutdown Margin Job Performance Measure |
ML20195H549 | 31 May 1999 | Monthly Operating Rept for May 1999 for Songs,Units 2 & 3 | |
ML20195K339 | 31 May 1999 | Monthly Operating Rept for May 1999 for Waterford 3 Ses.With | |
ML18066A484 | 31 May 1999 | Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr | |
ML17241A363 | 31 May 1999 | Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr | |
ML20195C304 | 28 May 1999 | Annual Rept on Abb CE ECCS Performance Evaluation Models | Fuel cladding |
ML17241A332 | 17 May 1999 | LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11 | |
ML20196L322 | 11 May 1999 | SONGS Unit 2 ISI Summary Rept 2nd Interval,2nd Period Cycle-10 Refueling Outage | Boric Acid Fire Barrier Hydrostatic Nondestructive Examination VT-2 Code Reconciliation Maintenance Rule Program Liquid penetrant Scaffolding |
ML17241A327 | 6 May 1999 | LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 Ltr | Boric Acid Coatings Through Wall Leak Power change |
ML20206H261 | 5 May 1999 | Part 21 Rept Re Defect Found in Potter & Brumfield Relays. Sixteen Relays Supplied in Lot 913501 by Vendor as Commercial Grade Items.Caused by Insufficient Contact Pad Welding.Relays Replaced with New Relays | |
ML20206S740 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Waterford 3.With |