Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18066A6901 November 1999Rev 5 to Palisades Nuclear Plant Colr.Shutdown Margin
ML20217F28913 October 1999Drill 99-08 Emergency Preparedness Exercise on 991013Grab sample
ML17241A4897 October 1999LER 99-004-00:on 990912,noted That MSSV Surveillance Was Outside of TS Requirements.Caused by Setpoint Drift.Subject MSSVs Are Being Refurbished & Retested Prior to Unit Startup from SL1-16 Refueling Outage.With 991007 Ltr
ML17241A49530 September 1999Monthly Operating Repts for Sept 1999 for St Lucie,Units 1 & 2.With 991014 Ltr
ML18066A67630 September 1999Monthly Operating Rept for Sept 1999 for Palisades Nuclear Plant
ML20217G72130 September 1999Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with
ML20217E33830 September 1999Monthly Operating Repts for Sept 1999 for Songs,Units 2 & 3
ML20212A14713 September 1999Special Rept:On 990904,condenser Monitor Was Declared Inoperable.Difficulties Encountered During Component Replacement Precluded SCE from Restoring Monitor to Service within 72 H.Alternate Method of Monitoring Was Established
ML20211N0513 September 1999SER Approving Exemption from Certain Requirements of 10CFR50.44 & 10CFR50 App A,General Design Criterion 41 to Remove Requirements from Hydrogen Control Systems from SONGS Units 2 & 3 Design BasisSevere Accident Management Guideline
Exemption Request
Fuel cladding
ML18066A6272 September 1999LER 98-011-01:on 981217,inadequate Lube Oil Collection Sys for Primary Coolant Pumps Was Noted.Caused by Design Change Not Containing Appropriate Level of Rigor.Exemption from 10CFR50,App R Was Requested.With 990902 Ltr
ML17241A47431 August 1999Rev 1 to PCM 99016, St Lucie Unit 1,Cycle 16 Colr.
ML17241A45931 August 1999Monthly Operating Repts for Aug 1999 for St Lucie,Units 1 & 2.With 990913 Ltr
ML18066A63531 August 1999Monthly Operating Rept for Aug 1999 for Palisades Nuclear Plant
ML18066A67731 August 1999Operating Data Rept Page of MOR for Aug 1999 for Palisades Nuclear Plant
ML20211Q21431 August 1999Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With
ML20211Q82031 August 1999Monthly Operating Repts for Aug 1999 for Songs,Units 2 & 3. with
ML20211H86223 August 1999Safety Evaluation Accepting Licensee Requests for Relief RR-E-2-03 - RR-E-2-08 from Exam Requirements of Applicable ASME Code,Section Xi,For First Containment ISI IntervalCoatings
ML18066A62220 August 1999LER 99-002-00:on 990722,TS Surveillance Was Not Completed within Specified Frequency.Caused by Failure to Incorporate Revised Frequency Into Surveillance Schedule in Timely Manner.Verified Implementation.With 990820 Ltr
ML20210P47311 August 1999COLR Cycle 10 Songs,Unit 2Shutdown Margin
Anticipated operational occurrence
Fuel cladding
ML20210P47911 August 1999COLR Cycle 10 Songs,Unit 3Shutdown Margin
Anticipated operational occurrence
Fuel cladding
ML20210Q65231 July 1999Monthly Operating Repts for July 1999 for Songs,Units 2 & 3
ML20210S05831 July 1999Monthly Operating Rept for July 1999 for Waterford 3.With
ML20210Q63631 July 1999Corrected Monthly Operating Rept for July 1999 for Waterford 3
ML18066A60631 July 1999Monthly Operating Rept for July 1999 for Palisades Nuclear Plant.With 990803 Ltr
ML17241A43031 July 1999Monthly Operating Repts for Jul 1999 for St Lucie Units 1 & 2.With 990805 Ltr
ML20210L27730 July 1999SONGS Unit 3 ISI Summary Rept 2nd Interval,2nd Period Cycle 10 Refueling Outage U3C10 Site Technical ServicesNondestructive Examination
VT-2
Liquid penetrant
ML20210D89523 July 1999Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020
ML17241A41116 July 1999LER 99-007-00:on 990610,unplanned Cooldown Transient Occurred Due to Personnel Error.Trained & Briefed Personnel & Revised Procedures.With 990716 Ltr
ML17241A4046 July 1999LER 99-005-00:on 990604,CEA Drop Resulted in Manual Reactor Trip.Caused by Procedural Inadequacies.Procedure Changes Are Planned to Correct Lack of Procedural Guidance for CEA Subgroup Power Switch Replacement.With 990706 LtrRod Drop Event
ML17241A4036 July 1999LER 99-006-00:on 990605,sub-critical Reactor Trip Occurred Due to Inadvertent MSIV Opening.Caused by Personnel Error. Provided Operation Supervision Instruction to Operating Crews,Stand Down Meetings & Operator Aids.With 990706 LtrShutdown Margin
ML18066A52030 June 1999Monthly Operating Rept for June 1999 for Palisades Nuclear Plant.With 990702 Ltr
ML17241A40930 June 1999Monthly Operating Repts for June 1999 for St Lucie,Units 1 & 2.With 990712 Ltr
ML17241A39430 June 1999LER 99-004-01:on 990415,as Found Cycle 10 Psv Setpoints Were Outside TS Limits.Caused by Manufacturing Process Defect. All Three Psvs Were Replaced with pre-tested Valves During Cycle 11 Refueling Outage.With 990630 Ltr
ML17355A36830 June 1999Revised Update to Topical QA Rept, Dtd June 1999Safe Shutdown
Non-Destructive Examination
Fire Barrier
Commercial Grade Dedication
Coatings
Nondestructive Examination
Condition Adverse to Quality
License Renewal
Control of Heavy Loads
Early Warning Fire Detection
ML20209H37830 June 1999Monthly Operating Rept for June 1999 for Waterford 3 Ses. with
ML20209C92830 June 1999Monthly Operating Repts for June 1999 for Songs,Units 2 & 3. with
ML20195J89517 June 1999Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii)Incorporated by reference
ML17241A3554 June 1999LER 99-002-00:on 990505,both Trains of Safety Injection Actuation Were Blocked During Surveillance.Caused by Procedure Error.Procedure Revised.With 990604 Ltr
ML20207E8633 June 1999Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3
ML20195D3062 June 1999Safety Evaluation of TR SCE-9801-P, Reload Analysis Methodology for San Onofre Nuclear Generating Station,Units 2 & 3. Rept AcceptableShutdown Margin
Job Performance Measure
ML20195H54931 May 1999Monthly Operating Rept for May 1999 for Songs,Units 2 & 3
ML20195K33931 May 1999Monthly Operating Rept for May 1999 for Waterford 3 Ses.With
ML18066A48431 May 1999Monthly Operating Rept for May 1999 for Palisades Nuclear Plant.With 990603 Ltr
ML17241A36331 May 1999Monthly Operating Repts for May 1999 for St Lucie Units 1 & 2.With 990610 Ltr
ML20195C30428 May 1999Annual Rept on Abb CE ECCS Performance Evaluation ModelsFuel cladding
ML17241A33217 May 1999LER 99-004-00:on 990415,determined That as Found Cycle 10 Psv Setpoints Outside TS Limits.Root Cause Under Investigation.Psvs Replaced with pe-tested Valves During Cycle 11
ML20196L32211 May 1999SONGS Unit 2 ISI Summary Rept 2nd Interval,2nd Period Cycle-10 Refueling OutageBoric Acid
Fire Barrier
Hydrostatic
Nondestructive Examination
VT-2
Code Reconciliation
Maintenance Rule Program
Liquid penetrant
Scaffolding
ML17241A3276 May 1999LER 99-003-00:on 990406,ECCS Suction Header Leak Resulted in Both ECCS Trains Being Inoperable & Entry Into TS 3.0.3. Caused by Chloride Induced OD Stress Corrosion Cracking of Piping.Made Code Repairs & Coated Piping.With 990506 LtrBoric Acid
Coatings
Through Wall Leak
Power change
ML20206H2615 May 1999Part 21 Rept Re Defect Found in Potter & Brumfield Relays. Sixteen Relays Supplied in Lot 913501 by Vendor as Commercial Grade Items.Caused by Insufficient Contact Pad Welding.Relays Replaced with New Relays
ML20206S74030 April 1999Monthly Operating Rept for Apr 1999 for Waterford 3.With