Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217N928 | 20 October 1999 | Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised | |
ML20217H363 | 14 October 1999 | Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su | |
ML18152A281 | 12 October 1999 | Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. | Liquid penetrant |
ML20217P076 | 6 October 1999 | Non-proprietary, Farley Units 1 & 2 LBB Calculation Results Due to SG Replacement & SG Snubber Elimination Programs | |
ML20212J925 | 1 October 1999 | Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant | VT-2 |
ML20217D685 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20217G036 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
ML20211N261 | 8 September 1999 | Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable | |
ML20212E745 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Hcgs,Unit 1.With Summary of Changes,Tests & Experiments Implemented During Aug 1999.With | Safe Shutdown Temporary Modification |
ML20211J242 | 31 August 1999 | Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 | Earthquake |
ML20211J256 | 31 August 1999 | Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 | |
ML20216E494 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Jmfnp.With | |
ML20216E501 | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with | |
ML20210T079 | 13 August 1999 | Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable | |
ML20210T216 | 6 August 1999 | Draft SE Supporting Proposed Conversion of Current TS to ITS for Plant | Shutdown Margin High Radiation Area Grab sample Turbine Missile Offsite Circuit |
ML20211B201 | 4 August 1999 | Informs Commission About Results of NRC Staff Review of Kaowool Fire Barriers at Farley Nuclear Plant,Units 1 & 2 & Staff Plans to Address Technical Issues with Kaowool & FP-60 Barriers | Safe Shutdown Fire Barrier Coatings Exemption Request Fire Protection Program Backfit |
ML20210R603 | 31 July 1999 | Monthly Operating Repts for July 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
ML20210Q993 | 31 July 1999 | Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud | |
ML20210S141 | 31 July 1999 | Monthly Operating Repts for July 1999 for North Anna Power Station.With | |
ML20209E564 | 30 June 1999 | Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With | |
ML20196J379 | 30 June 1999 | Safety Evaluation of TR WCAP-14750, RCS Flow Verification Using Elbow Taps at Westinghouse 3-Loop Pwrs. Rept Acceptable | |
L-99-267, Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | 30 June 1999 | Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
ML20209G066 | 30 June 1999 | Monthly Operating Repts for June 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
L-99-023, Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with | 31 May 1999 | Monthly Operating Repts for May 1999 for Jfnp Units 1 & 2. with | |
ML20195G190 | 31 May 1999 | Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with | |
ML20206L483 | 10 May 1999 | SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping | Probabilistic Risk Assessment Incorporated by reference |
ML20206G747 | 4 May 1999 | Safety Evaluation Accepting Corrective Actions Taken by SNC to Ensure That Valves Perform Intended Safety Functions & Concluding That SNC Adequately Addressed Requested Actions in GL 95-07 | Power-Operated Valves Backfit |
ML20206Q667 | 30 April 1999 | Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20206C946 | 30 April 1999 | 1:Final Cycle 16 Freespan ODSCC Operational Assessment | |
L-99-020, Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
ML20205S039 | 21 April 1999 | SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) | Nondestructive Examination VT-2 Moisture barrier |
ML20205K304 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With | |
L-99-161, Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
ML20205N096 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
ML20204D727 | 15 March 1999 | ISI Refueling 15,Interval 2,Period 3,Outage 3 for Jm Farley Nuclear Generating Plant,Unit 1 | Hydrostatic Nondestructive Examination VT-2 Liquid penetrant |
ML20207K592 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With | |
ML20207M642 | 28 February 1999 | Monthly Operating Repts for Feb 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
ML20207E173 | 18 February 1999 | Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year | |
ML20203A265 | 31 January 1999 | Monthly Operating Repts for Jan 1999 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
ML20199D861 | 12 January 1999 | SER Accepting Relief Request for Inservice Insp Program for Plant,Units 1 & 2 | Boric Acid Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |
ML20199E659 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
ML20205A024 | 31 December 1998 | Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With | Safe Shutdown Boric Acid Shutdown Margin Fire Barrier Stroke time Post Accident Monitoring Hydrostatic Enforcement Discretion Coatings Temporary Modification Aging Management Foreign Material Exclusion License Renewal Exemption Request Earthquake Pressure Boundary Leakage Fire Protection Program |
ML20199C878 | 31 December 1998 | Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With | |
ML20206C808 | 31 December 1998 | Alabama Power 1998 Annual Rept | |
ML20198K409 | 18 December 1998 | COLR for Jm Farley,Unit 1 Cycle 16 | Shutdown Margin |
ML20198H954 | 3 December 1998 | Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant | Time of Discovery Non-Destructive Examination Nondestructive Examination Through-Wall Leak |
ML20198J556 | 3 December 1998 | ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps | |
ML20198B256 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for Jm Farley Nuclear Plant,Units 1 & 2.With | |
ML20197G855 | 30 November 1998 | Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With | |
ML20195E228 | 16 November 1998 | Safety Evaluation Authorizing Relief Request for Second 10-year ISI Program Relief Request 56 for Plant,Unit 1 | Non-Destructive Examination Hydrostatic Nondestructive Examination VT-2 Incorporated by reference |