Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217G216 | 15 October 1999 | Errata Pages 2 & 3 for Safety Evaluation Supporting Amend 168 Issued to FOL DPR-63 Issued on 990921.New Pages Change Description of Flow Control Trip Ref Cards to Be Consistent with Application for Amend | Fuel cladding |
ML20217G996 | 14 October 1999 | SER Accepting First 10-year Interval Inservice Insp Requests for Relief for Plant,Units 1 & | VT-2 Incorporated by reference |
ML20217F289 | 13 October 1999 | Drill 99-08 Emergency Preparedness Exercise on 991013 | Grab sample |
ML20217G721 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with | |
BW990066, Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Braidwood Station, Units 1 & 2.With | |
ML17300B381 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Pvngs,Units 1,2 & 3.With 991007 Ltr | |
ML20217K463 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Nine Mile Point, Unit 1.With | |
ML20216J925 | 30 September 1999 | Suppl to Special Rept:On 990621,11 Containment Hydrogen Monitoring Sys Chart Recorder Was Indicating Below Normal Operating Range.Caused by Excessive Wear on Valve Body & Discs of Bypass Pump.Sample Pump Replaced | |
ML20217P635 | 29 September 1999 | Non-proprietary Rev 6 to HI-982083, Licensing Rept for Spent Fuel Rack Installation at Byron & Braidwood Nuclear Stations | Safe Shutdown Earthquake Operating Basis Earthquake Earthquake |
ML20217A169 | 22 September 1999 | Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers | |
ML20212F730 | 21 September 1999 | Special Rept:On 990907,CR Operators Declared 12 Containment Hydrogen Monitoring Sys Inoperable for Planned Maint.Cause of Low Flow Condition Was Determined to Be Foreign Matl. Replaced Sample Pump Valve Discs | |
ML20212B908 | 14 September 1999 | Special Rept:On 990901, 12 Containment Hydrogen Monitoring Sys Was Declared Inoperable for Planned Maint.Caused by Planned Maint Being Performed as Corrective Action.Check Valves with O Rings Were Replaced | |
ML20212A744 | 10 September 1999 | Safety Evaluation Concluding That Alternatives Contained in Relief Request 12R-07 Provide Acceptable Level of Quality & Safety | Hydrostatic VT-2 Incorporated by reference Finite Element Analysis Liquid penetrant |
BW990056, Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Braidwood Station, Units 1 & 2.With | |
ML17300B327 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Pvngs,Units 1,2 & 3 | |
ML20212C460 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Nine Mile Point Nuclear Station,Unit 1.With | |
ML20216F514 | 31 August 1999 | Rept on Status of Public Petitions Under 10CFR2.206 | Unanalyzed Condition Hydrostatic |
ML20211Q214 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With | |
ML17313B075 | 27 August 1999 | LER 99-002-00:on 990730,test Mode Trip Bypass for EDG Output Breakers Not Surveilled.Cause Under Investigation.Operations Personnel Conservatively Invoked SR 3.0.3 for SR 3.8.1.13. with 990827 Ltr | Missed surveillance |
ML20210R642 | 13 August 1999 | ISI Outage Rept for A2R07 | Boric Acid Hydrostatic VT-2 Moisture barrier Liquid penetrant |
ML20210U811 | 4 August 1999 | SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval Because Relief Applies to Valves Not Required by 10CFR50.55a | |
BW990048, Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With | 31 July 1999 | Monthly Operating Repts for Jul 1999 for Braidwood Station, Units 1 & 2.With | |
ML20210U459 | 31 July 1999 | Monthly Operating Rept for July 1999 for Nine Mile Point, Unit 1.With | |
ML17313B061 | 31 July 1999 | Monthly Operating Repts for July 1999 for Pvngs,Units 1,2 & 3.With 990810 Ltr | |
ML20210Q636 | 31 July 1999 | Corrected Monthly Operating Rept for July 1999 for Waterford 3 | |
ML20210S058 | 31 July 1999 | Monthly Operating Rept for July 1999 for Waterford 3.With | |
ML20210K986 | 30 July 1999 | Safety Evaluation Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs | Stroke time |
ML20210D895 | 23 July 1999 | Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020 | |
ML17313B019 | 16 July 1999 | LER 99-005-00:on 990618,RT on Low DNBR Was Noted.Caused by Hardware Induced Calculation Error.Cr Operator Was Taken to Place Reactor in Stable Condition IAW Appropriate Operating Procedure | Anticipated operational occurrence |
M990002, Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | 12 July 1999 | Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | |
ML20216D384 | 12 July 1999 | Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function | |
ML20209D029 | 2 July 1999 | Special Rept:On 990621,operator Identified That Number 11 Hydrogen Monitoring Sys (Hms) Chart Recorder Was Indicating Below Normal Operating Range.Cause Indeterminate.Licensee Will Complete Troubleshooting of Subject Hms by 990709 | |
ML17300B315 | 30 June 1999 | Monthly Operating Repts for June 1999 for Pvngs,Units 1,2 & 3.With 990714 Ltr | |
BW990038, Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With | 30 June 1999 | Monthly Operating Repts for June 1999 for Braidwood Station, Units 1 & 2.With | |
ML20210B908 | 30 June 1999 | Monthly Operating Rept for June 1999 for Nine Mile Point Unit 1.With | |
ML20209H378 | 30 June 1999 | Monthly Operating Rept for June 1999 for Waterford 3 Ses. with | |
ML17313A992 | 21 June 1999 | Special Rept:On 990525,RMS mini-computer Was Removed from Service to Implement Yr 2000 Mod & Was OOS Longer than 72 H Allowed.Caused by Planned Y2K Mods.Preplanned Alternate Sampling Program Was Initiated | Offsite Dose Calculation Manual |
ML17313A991 | 18 June 1999 | Special Rept:On 990510,loose-part Detection Sys Channel 2 Was Declared Inoperable.Caused by Malfunction of Mineral Cable Connector to Accelerometer.Licensee Will Implement Modifications Which Will Enhance loose-part Detection Sys | |
ML20195J895 | 17 June 1999 | Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii) | Incorporated by reference |
ML20209F881 | 8 June 1999 | Rev 1 to NMP Unit 1 COLR for Cycle 14 | |
ML20207G226 | 7 June 1999 | SER Accepting Proposed Mod to Each of Four Core Shroud Stabilizers for Implementation During Current 1999 Refueling Outage at Plant,Unit 1 | |
ML20207E863 | 3 June 1999 | Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3 | |
ML20195K339 | 31 May 1999 | Monthly Operating Rept for May 1999 for Waterford 3 Ses.With | |
ML20209H748 | 31 May 1999 | Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2 | |
BW990029, Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With | 31 May 1999 | Monthly Operating Repts for May 1999 for Braidwood Stations, Units 1 & 2.With | |
ML20196E211 | 31 May 1999 | Monthly Operating Rept for May 1999 for Nmp,Unit 1.With | |
ML17313A973 | 31 May 1999 | Monthly Operating Repts for May 1999 for Pvngs,Units 1,2 & 3.With 990608 Ltr | |
ML20195C304 | 28 May 1999 | Annual Rept on Abb CE ECCS Performance Evaluation Models | Fuel cladding |
ML20207B648 | 25 May 1999 | SER Accepting Revised SGTR Analysis for Byron & Braidwood Stations.Revised Analysis Was Submitted to Support SG Replacement at Unit 1 of Each Station | |
ML20195B259 | 19 May 1999 | Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood Stations | Offsite Dose Calculation Manual Process Control Program |