Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20217L893 | 31 October 1999 | Rev 1 to BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs | Probabilistic Risk Assessment Nondestructive Examination Large early release frequency Flow Induced Vibration |
ML20217F289 | 13 October 1999 | Drill 99-08 Emergency Preparedness Exercise on 991013 | Grab sample |
ML20212L114 | 1 October 1999 | Safety Evaluation Granting Request for Exemption from Technical Requirements of 10CFR50,App R,Section III.G.2.c | Safe Shutdown Fire Barrier Foreign Material Exclusion Moisture barrier Hemyc Exemption Request Continuous fire watch Fire Protection Program Fire Watch |
ML20217G721 | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Waterford 3 Ses. with | |
0CAN109902, Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With | 30 September 1999 | Monthly Operating Repts for Sept 1999 for Arkansas Nuclear One,Units 1 & 2.With | |
ML20217F992 | 30 September 1999 | Monthly Operating Rept for Sept 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20216J627 | 27 September 1999 | Rev 0 to CALC-98-R-1020-04, ANO-1 Cycle 16 Colr | Shutdown Margin |
ML20212F564 | 23 September 1999 | SER Concluding That All of ampacity-related Concerns Have Been Resolved & Licensee Provided Adequate Technical Basis to Assure That All of Thermo-Lag Fire Barrier Encl Cables Operating within Acceptable Ampacity Limits | Fire Barrier |
ML20212F526 | 22 September 1999 | SER Approving Request Reliefs 1-98-001 & 1-98-200,parts 1,2 & 3 for Second 10-year ISI Interval at Arkansas Nuclear One, Unit 1 | Liquid penetrant |
ML20211Q317 | 9 September 1999 | Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 | |
ML20216E488 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Grand Gulf Nuclear Station.With | |
ML20211Q214 | 31 August 1999 | Monthly Operating Rept for Aug 1999 for Waterord 3 Ses.With | |
0CAN099907, Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with | 31 August 1999 | Monthly Operating Repts for Aug 1999 for Ano,Units 1 & 2. with | |
ML20211F428 | 25 August 1999 | Safety Evaluation Concluding That Licensee Provided Acceptable Alternative to Requirements of ASME Code Section XI & That Authorization of Proposed Alternative Would Provide Acceptable Level of Quality & Safety | Probabilistic Risk Assessment Nondestructive Examination Large early release frequency Dissimilar Metal Weld |
ML20210Q636 | 31 July 1999 | Corrected Monthly Operating Rept for July 1999 for Waterford 3 | |
ML20210S058 | 31 July 1999 | Monthly Operating Rept for July 1999 for Waterford 3.With | |
0CAN089904, Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with | 31 July 1999 | Monthly Operating Repts for July 1999 for Ano,Units 1 & 2. with | |
ML20211A692 | 31 July 1999 | Monthly Operating Rept for July 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20210K883 | 29 July 1999 | Non-proprietary Addendum B to BAW-2346P,Rev 0 Re ANO-1 Specific MSLB Leak Rates | |
ML20210D895 | 23 July 1999 | Safety Evaluation Accepting First 10-yr Interval Inservice Insp Plan Requests for Relief ISI-018 - ISI-020 | |
ML20209J196 | 12 July 1999 | Special Rept 99-001:on 990528,smoke Detectors Failed to Alarm During Performance of Routine Channel Functional Testing.Applicable TRM Interim Compensatory Measure of Establishing Roving Hourly Fire Patrol Was Implemented | |
ML20196K498 | 1 July 1999 | Safety Evaluation Authorizing PRR-E12-01,PRR-E21-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01.Concludes That Alternatives Proposed by EOI Acceptable | High Radiation Area Stroke time Incorporated by reference Foreign Material Exclusion Power-Operated Valves Scaffolding |
ML20209G069 | 30 June 1999 | Monthly Operating Rept for June 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20209H378 | 30 June 1999 | Monthly Operating Rept for June 1999 for Waterford 3 Ses. with | |
0CAN079903, Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with | 30 June 1999 | Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with | |
ML20195J895 | 17 June 1999 | Safety Evaluation Granting Relief for Listed ISI Parts for Current Interval,Per 10CFR50.55a(g)(5)(iii) | Incorporated by reference |
ML20207E863 | 3 June 1999 | Safety Evaluation Accepting Licensee 990114 Submittal of one-time Request for Relief from ASME B&PV Code IST Requirements for Pressure Safety Valves at Plant,Unit 3 | |
ML20207E723 | 2 June 1999 | Safety Evaluation Authorizing Proposed Alternative Exam Methods Proposed in Alternative Exam 99-0-002 to Perform General Visual Exam of Accessible Areas & Detailed Visual Exam of Areas Determined to Be Suspect | |
ML20196A625 | 31 May 1999 | Non-proprietary Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs | Non-Destructive Examination Probabilistic Risk Assessment Large early release frequency Flow Induced Vibration |
ML20196A019 | 31 May 1999 | Monthly Operating Repts for May 1999 for Arkansas Nuclear One,Units 1 & 2.With | |
ML20195K339 | 31 May 1999 | Monthly Operating Rept for May 1999 for Waterford 3 Ses.With | |
ML20196A116 | 31 May 1999 | Monthly Operating Rept for May 1999 for Grand Gulf Nuclear Station.With | |
ML20195D199 | 28 May 1999 | Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14 | Boric Acid Nondestructive Examination |
ML20195C304 | 28 May 1999 | Annual Rept on Abb CE ECCS Performance Evaluation Models | Fuel cladding |
ML20206M771 | 11 May 1999 | SER Accepting Relief Request from ASME Code Section XI Requirements for Plant,Units 1 & 2 | |
0CAN059903, Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with | 30 April 1999 | Monthly Operating Repts for Apr 1999 for Ano,Units 1 & 2. with | |
ML20206S740 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Waterford 3.With | |
ML20206Q483 | 30 April 1999 | Monthly Operating Rept for Apr 1999 for Grand Gulf Nuclear Station Unit 1.With | |
ML20206J120 | 30 April 1999 | Redacted ME-98-001-00, Pressure Locking & Thermal Binding Test Program on Two Gate Valves with Limitorque Actuators | |
ML20206F069 | 29 April 1999 | Safety Evaluation Accepting Licensee Re ISI Plan for Third 10-year Interval & Associated Requests for Alternatives for Plant,Unit 1 | Boric Acid Nondestructive Examination VT-2 Incorporated by reference |
ML20205T262 | 22 April 1999 | LER 99-S02-00:on 990216,contract Employee Inappropriately Granted Unescorted Access to Plant Protected Area.Caused by Personnel Error.Security Personnel Performed Review of Work & Work Area That Individual Was Involved with | |
ML20205M694 | 12 April 1999 | Safety Evaluation Granting Relief for Second 10-yr Inservice Inspection Interval for Plant,Unit 1 | VT-2 Incorporated by reference Dissimilar Metal Weld |
ML18016A901 | 12 April 1999 | Part 21 Rept Re Defect in Component of DSRV-16-4,Enterprise DG Sys.Caused by Potential Problem with Connecting Rod Assemblies Built Since 1986,that Have Been Converted to Use Prestressed Fasteners.Affected Rods Should Be Inspected | |
ML20205P877 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Grand Gulf Nuclear Station,Unit 1.With | |
ML20205D606 | 31 March 1999 | Safety Evaluation Supporting Licensee Proposed Approach Acceptable to Perform Future Structural Integrity & Operability Assessments of Carbon Steel | Time of Discovery Nondestructive Examination Through-Wall Leak |
ML20205R635 | 31 March 1999 | Monthly Operating Repts for Mar 1999 for Ano,Units 1 & 2. with | |
ML20205N967 | 31 March 1999 | Monthly Operating Rept for Mar 1999 for Waterford 3 Ses.With | |
ML20205E853 | 30 March 1999 | Corrected Pages COLR 3/4 1-4 & COLR 3/4 2-6 to Rev 1, Cycle 10, Colr | |
ML20205D471 | 26 March 1999 | SER Accepting Util Proposed Alternative to Employ Alternative Welding Matls of Code Cases 2142-1 & 2143-1 for Reactor Coolant System to Facilitate Replacement of Steam Generators at Arkansas Nuclear One,Unit 2 | |
ML20205A633 | 25 March 1999 | SER Accepting Request to Use Mechanical Nozzle Seal Assemblies as an Alternative Repair Method,Per 10CFR50.55a(a)(3)(i) for Reactor Coolant Sys Applications at Plant,Unit 3 | Hydrostatic Incorporated by reference |