Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20217G21615 October 1999Errata Pages 2 & 3 for Safety Evaluation Supporting Amend 168 Issued to FOL DPR-63 Issued on 990921.New Pages Change Description of Flow Control Trip Ref Cards to Be Consistent with Application for AmendFuel cladding
ML20216J92530 September 1999Suppl to Special Rept:On 990621,11 Containment Hydrogen Monitoring Sys Chart Recorder Was Indicating Below Normal Operating Range.Caused by Excessive Wear on Valve Body & Discs of Bypass Pump.Sample Pump Replaced
ML20217K46330 September 1999Monthly Operating Rept for Sept 1999 for Nine Mile Point, Unit 1.With
JAFP-99-0277, Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With30 September 1999Monthly Operating Rept for Sept 1999 Fpr Ja FitzPatrick Nuclear Power Plant.With
ML20249C84930 September 19991999 Third Quarter Rept of Completed Changes,Tests & Experiments Evaluated,Per 10CFR50.59(b)(2), for Dresden Nuclear Power Station. withTemporary Modification
ML20217A99330 September 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data
ML20217A16922 September 1999Part 21 Rept Re Engine Sys,Inc Controllers,Manufactured Between Dec 1997 & May 1999,that May Have Questionable Soldering Workmanship.Caused by Inadequate Personnel Training.Sent Rept to All Nuclear Customers
ML20212F73021 September 1999Special Rept:On 990907,CR Operators Declared 12 Containment Hydrogen Monitoring Sys Inoperable for Planned Maint.Cause of Low Flow Condition Was Determined to Be Foreign Matl. Replaced Sample Pump Valve Discs
ML20212B90814 September 1999Special Rept:On 990901, 12 Containment Hydrogen Monitoring Sys Was Declared Inoperable for Planned Maint.Caused by Planned Maint Being Performed as Corrective Action.Check Valves with O Rings Were Replaced
ML20216F51431 August 1999Rept on Status of Public Petitions Under 10CFR2.206Unanalyzed Condition
Hydrostatic
ML20212C46031 August 1999Monthly Operating Rept for Aug 1999 for Nine Mile Point Nuclear Station,Unit 1.With
JAFP-99-0261, Monthly Operating Rept for Aug 1999 for Jafnpp.With31 August 1999Monthly Operating Rept for Aug 1999 for Jafnpp.With
JAFP-99-0236, Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with31 July 1999Monthly Operating Rept for July 1999 for Ja FitzPatrick Npp. with
ML20210U45931 July 1999Monthly Operating Rept for July 1999 for Nine Mile Point, Unit 1.With
ML20210R60831 July 1999Monthly Operating Repts for July 1999 for Dresden Nuclear Power,Units 1,2 & 3.With
ML20216D95428 July 1999Safety Evaluation Authorizing Proposed Alternatives for Second 10-year Interval Pursuant to 10CFR50.55a(a)(3)(ii)VT-2
Incorporated by reference
Liquid penetrant
Dissimilar Metal Weld
ML20209D0292 July 1999Special Rept:On 990621,operator Identified That Number 11 Hydrogen Monitoring Sys (Hms) Chart Recorder Was Indicating Below Normal Operating Range.Cause Indeterminate.Licensee Will Complete Troubleshooting of Subject Hms by 990709
JAFP-99-0211, Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With30 June 1999Monthly Operating Rept for June 1999 for Ja FitzPatrick Nuclear Power Plant.With
ML20209E12930 June 1999Monthly Operating Repts for June 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With
ML20210B90830 June 1999Monthly Operating Rept for June 1999 for Nine Mile Point Unit 1.With
ML20196H86230 June 1999NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 ReptHigh Radiation Area
Power change
ML20210D30730 June 1999Corrected Page 8 to MOR for June 1999 for DNPS Unit 3
ML20209J34830 June 19991999 Second Quarter Rept of Completed Changes,Tests & Experiments, Per 10CFR50.59.WithSafe Shutdown
Temporary Modification
ML20209F8818 June 1999Rev 1 to NMP Unit 1 COLR for Cycle 14
ML20207G2267 June 1999SER Accepting Proposed Mod to Each of Four Core Shroud Stabilizers for Implementation During Current 1999 Refueling Outage at Plant,Unit 1
JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with2 June 1999Annual Summary of Changes,Tests & Experiments for 1997/1998. withSafe Shutdown
High winds
Shutdown Margin
Loop seal
High Radiation Area
Non-Destructive Examination
Fire Barrier
Stroke time
Temporary Modification
Liquid penetrant
Fire Protection Program
Fire Watch
Grace period
Power Uprate
Overexposure
ML20196E21131 May 1999Monthly Operating Rept for May 1999 for Nmp,Unit 1.With
ML20195G63831 May 1999Monthly Operating Repts for May 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.WithEnforcement Discretion
JAFP-99-0181, Monthly Operating Rept for May 1999 for Jafnpp.With31 May 1999Monthly Operating Rept for May 1999 for Jafnpp.With
ML20195B25919 May 1999Rev 66a to CE-1-A,consisting of Proposed Changes to QAP for Dnps,Qcs,Znps,Lcs,Byron & Braidwood StationsOffsite Dose Calculation Manual
Process Control Program
ML20207B02418 May 1999Safety Evaluation of Topical Rept TR-107285, BWR Vessel & Intervals Project,Bwr Top Guide Insp & Flaw Evaluation Guidelines (BWRVIP-26), Dtd December 1996.Rept AcceptableSafe Shutdown Earthquake
Finite Element Analysis
EVT-1
ML20206U53517 May 1999SER Accepting GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, for Plant, Units 1 & 2Backfit
ML20206N28230 April 1999Monthly Operating Repts for Apr 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With
JAFP-99-0166, Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With30 April 1999Monthly Operating Rept for Apr 1999 for Ja FitzPatrick Nuclear Plant.With
ML20196L23030 April 1999Monthly Operating Rept for Apr 1999 for Nmp,Unit 1.With
ML20205L0541 April 1999Nonproprietary Replacement Pages to HI-91738,consisting of Section 5.0, Thermal-Hydraulic AnalysisFinite Element Analysis
Fuel cladding
ML20205S57031 March 1999Monthly Operating Rept for Mar 1999 for NMP Unit 1.With
JAFP-99-0142, Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With31 March 1999Monthly Operating Rept for Mar 1999 for Ja FitzPatrick Nuclear Power Plant.With
ML20206B19031 March 1999First Quarter Rept of Completed Changes,Tests & Experiments Per 10CFR50.59 for Dresden Nuclear Power Station. withShutdown Margin
Fire Barrier
Temporary Modification
Severe Accident Management Guideline
ML20205N74931 March 1999Monthly Operating Repts for Mar 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.With
ML20207M92312 March 1999Amended Part 21 Rept Re Cooper-Bessemer Ksv EDG Power Piston Failure.Total of 198 or More Pistons Have Been Measured at Seven Different Sites.All Potentially Defective Pistons Have Been Removed from Svc Based on Encl Results
ML20207G2671 March 1999Special Rept:On 990315,Nine Mile Point,Unit 1 Declared Number 12 Containment Hydrogen Monitoring Sys Inoperable. Caused by Degraded Encapsulated Reed Switch within Flow Switch FS-201.2-1495.Technicians Replaced Flow Switch
ML20204C99728 February 1999Monthly Operating Rept for Feb 1999 for Nine Mile Point,Unit 1.With
ML20207M69228 February 1999Monthly Operating Repts for Feb 1999 for Dresden Nuclear Power Station,Units 1,2 & 3.WithHydrostatic
JAFP-99-0092, Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With28 February 1999Monthly Operating Rept for Feb 1999 for Ja FitzPatrick Nuclear Power Plant.With
ML20207E93126 February 1999Part 21 Rept Re Sprague Model TE1302 Aluminum Electrolytic Capacitors with Date Code of 9322H.Caused by Aluminum Electrolytic Capacitors.Affected Capacitors Replaced
ML20202J0893 February 1999Safety Evaluation Accepting Rev 2 of Third Interval Inservice Testing Program for Pumps & Valves for James a FitzPatrick Nuclear Power PlantStroke time
Incorporated by reference
Power-Operated Valves
Power Operated Valves
ML17059C55031 January 1999Rev 0 to MPR-1966(NP), NMP Unit 1 Core Shroud Vertical Weld Repair Design Rept.Operating Basis Earthquake
Design basis earthquake
Foreign Material Exclusion
Liquid penetrant
Flow Induced Vibration
ML20199M08922 January 1999Part 21 Rept Re Failure of Square Root Converters.Caused by Failed Aluminum Electrolytic Capacitory Spargue Electric Co (Model Number TE1302 with Mfg Date Code 9322H).Sent Square Root Converters Back to Mfg,Barker Microfarads,Inc
JAFP-99-0011, Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With31 December 1998Monthly Operating Rept for Dec 1998 for Ja FitzPatrick Nuclear Power Plant.With