ML20195H927

From kanterella
Jump to navigation Jump to search
Rev 0 to UNT-5-013, Administrative Procedure Fire Protection Program
ML20195H927
Person / Time
Site: Waterford Entergy icon.png
Issue date: 11/18/1988
From:
LOUISIANA POWER & LIGHT CO.
To:
Shared Package
ML20195H920 List:
References
UNT-5-013, UNT-5-13, NUDOCS 8812010119
Download: ML20195H927 (44)


Text

?..... . .P C. :=:TT~=- ' : =". " ~:~: ^ . ..

\

unnemma mnmi a uswr conwam e ___._.._._

PoM voluts UNT-5-013 PCM SECTION REVIsIoM 0 i

LFDl. V!- 3 D,T.CCPDS

" [,y /o s _ g; l s1 t ..m

c. tf - ui p'g 7,}aI,s c. D .Cs *g ',f,tp/

DO NO1 UGE IN ANY SAT-ETY-P. ELATED TESTING, MAINTENANCE. OR OPERATIONAL ACTIVITY ADMINISTRATIVE PROCEDURE FIRE PROTECTION PROGRAM PORC Meeting No. MMI3 Reviewed r om  % / It

/DAIX i ff7CAC Chalzmaa Ayyreved h- /

I/ I f Last (danFsat-duclear DAIX Elfactive Date 8912010119 831123 PDR ADOCK O'.'0003SI P FDC

. P, e

PORC REVIEW COVER S1E17 REVIEW Ori UNT-5-013 , Fire Protection Program (Rev. 0)

PORC REVIEV The PORC has reviewed this ites sad determined that a safe:y evaluation was performed (as applicable), that sa unreviewed safety question does set exist (as applicable), that a change to the Technical Specifications is set required, and that nuclear safety)d7was not adversely affected.

ORDER OF REC 0tRSNDED PORC HEH3ER PORC HDiSER REVIEW FOR APPROVAL DATI

$!GNATURE TIS NO Maintensace Superintendent -[ ,

f

//,!/7[$

! Operatiosa Superistandest c ~Agg-

///<

7/88 Radiation Protection ,

Superistendent V li 7 gg $

n.eseee-ew ue==

Sapport-end-As**ese**t- i 0pllll$$$ j$ ca Manage .

/[ // //j[f/-

?

Plant Engineering Superintendent y r t/[7hf Assistaat Plant Namager i

PORC Chairman u>wpav uw

/ f PORC P. sting No. 8h 8 I e. O Datet //-// b [

This itas is recommended for approval?- TES Q NO This ites requires SRC/NRC review prior Fo implementation? O TES if yes, ensure documentation supporting review is attached. gM0 PLANT MANAGER IfUCLIAR APPROVAL (RETIR TO 5.4.12.1)

Comments:

j Approved by d/4 Plant Manager-Nuclear Data ~

N/#  ;

r UNT-1-004 Revision 8 Attachment 6.1 (1 of 1) 20

c- - .. . . . . . . , .. . . . . . . . _ . . . . . . . . _ ,. . _. -

. WATERFORD 3 SIS PLANT OPERATING MMUAL Check Block Below NEW PROCEDURI REQUEST IflPON l[lPORC-S/C PROCEDURI NO.LAuT. s- ci"E, RKV NO. Cd PROCIDURE TTPEJ w ai m us TITLI Vin.e P2 e e,,su L ?.'h ' -

' W g_- - C .= 2 Ylk ITFICTIVE DATE (IT APPLICABLE)

Atml0R A L. Meese EIPIRATION DATI (IT APPLICABLE)

DESCRIPTICW 0F PROCEDURI Soute m i som ~ -,<_,w ac .u.m n e, ,_ ,_ en m ,--.- u.mt e.a Cu um a % (mt RIASON TOR PROCIDURE % a< ~m ea m s - .a .c h ,. m h,ws 35.13 3rto me un n 3,, , u m m w e., c , (m (%.t o).

N Ano 6 m .!nere h h*/J.

3.tf41f .

, AM? / '

AM2iD BT h71 Oh DATI[8<f>

/

M / M N REVIIW Plaar dankver-Nuclear (POST l Does this procedure: Assist. Plant Manager-Nuclear (PCRC-S/C)

. 1. Change the design function and/or operation of a , .

systas structure or coeponent described in the TSAR? TIS NO /

2. Change the procedures as described in the TSAR 7 TIS NO <
3. Conduct tests /arperiments not described in the TSAR 7 TIS NO /
4. Require a change to the Technical Specifications? TIS k NO ./
5. Does this procedure alter implementation of cossaitaents? TIS No w If the answer to any of the above is TIS, complete and attach a 10CTR50.59 SATETY EVALUATION.

SATITT/C0!!iITMENT REVIIV JA - x C 6* Le

  • O 7 Signa ture , 'Authe r Date TICHNICAL REVIIV (( MM Signature, 'ecunical Reviewer 9.28'88 Data d -

GROUP BIAD REVIIV ,e -a m W ///n!fv

,Spgnature,GroupHead / Date

~

Applicable Conditions (Temporary Procedures Only):

UNT-1-003 Revision 10 Attachment 6.6 (1 of 1) 29

. m. 5 c 7, - n _ ...o ~ - .- - -

1 Administrative Procedura UNT-5-013  ;

Fire Protection Program Revision 0 TABLE OF CONTENTS f 1.0 PURPOSE 2.0 REFEREFCES 3.0 DEFINITION F .

4.0 RESPONSIBILITIES 4

5.0 PROCEDURE l 9

5.1 General 5.2 Operation Maintenance, Impairments and Testing of Fire Protection Systeme' '

5.3 Plant Nodifications 5.4-FiteL^revention P Activities .

' 5.5 Fire Energencies -

' I 5.6 Pre-Fire Strategies. .

5.7 Training Equipment .

5.4 Fire Protection Program Auidts 5.9 Quality Assurance Activitt,es 5.10 Fire Watch i 5.11 Coatractors/ Services l 5.12 Nousekeeping i 5.13 Records I

(

6.0 AftACHNEFTS

. t LIST OF EFITCTIVE PAGES

(

Title Revision 0 1-41 Revision 0 i

i 1 l i

Administrative Procedure UNT-5-013

,, Fire Protectica Pr: gram Revisita 0

, e 1.0 PURPOSE This procedure describes, delineates. responsibilities, control and imple-menting requirements for the Fire Protection Program for the Waterford 3 SES. It is intended for this document to be operationally based and to provide the plant staff with a practical and working guide to the fire protectisa program. Additionally, this procedure provides guidance for operation of the Fire Protection System with respect to operability, surveillance testing and compensatory measures necessary for inoperable or degraded operability of systems. This procedure is intended to replace those portions of the plant's original Technical Specifications regarding Fire Protection.

2.0 REFERENCES

- 2,.1 10CTR50 Appendix R -

2.2 NURIG - 0800 Standard Review Plan, Section 9.5.1 1 2.3 Branch Technical Position APCSB 9.5-1 2.4 NRC Supplementary Guidance - Nuclear Plant Fire Protection Functional Responsibilities, Administrative Controls and Quality Assurance i

2.5 Waterford Steam Electric Station, Unit 3, Facility Operating License, j No. NPT-38 2.6 Waterford Steam Electric Station, Unit 3; Final Safety Analysis Report 2.7 NURIG - 0787 - Waterford Steam Electric Station, Unit 3; Safety l Evaluation Report 2.8 Nuclear Ope ~ rations Management Manual - Section VI, Chapter 1 - Fire Protection l

2

. . - - , -. - - - . , . - , a

w. e .- --..e.-.~..--. g_.-m. - - .- .

)

Administrative Procedura UNT-5-013

, , Fire Protection Pr: gras , Revision 0 2.9 FP-1-014 - Duties of a Fire Watch .

2.10 FP-1-015 - Fire Protection System Impairments 2.11 FP-1-016 - Hot Work Activities 2.12 FP-1-017 - Transient Combustibles and Hazardous Materials 2.13 FP-1-018 - Pre-Tire Strategies 2.14 TP-1-019 - Fire Brigade Equipment 2.15 FF-1-020 - Fire Emergency / Fire Report 2.16 FF-1-021 - Fire Barrier Removal and Restoration 2.17 FP-1-022 - Station Modification Fire Protection / Safe Shutdown Review 2.18 FP-1-023 - Fire Protection and Safety Records 2.19 PE-2-006 - Plant Engineering Design Change 2.20 NTP-202 - Fire Protection Training 2.21 UNT-5-002 - Condition Identification 2.22 UNT-5-015 - Work Authorization, Preparation and Implementation 2.23 UFT-5-003 - Clearance Requests, Approval, and Release 2.24 UNT-7-006 - Housekeeping

Aaministrative Procedura 1917 0 1 3 Fire Pr:te: tion Pr: gram Revision 0 2.25 RP-1-001 - Recognition and Classification of Emergency Conditions 2.26 FP-CLC Combustible Load Calculations 2.27 NRC Generic Letter 46-10 2

2.23 NRC Generic Letter 88-12 1

2.29 UNT-5-012 - Repetitive Task Identification 3.0 DEFINITIONS 3.1 Channel Functional Test: The inject. ion of a simulated signal into j channel as close to the senaar as practicable to verify CPERABILITY

] including alars and/or trip functions.

j 3.2 Emergency Coordinator: A designated individual having the responsi-j bility and authority for implementing the Emergency Response Plan aad

, who coordinates all efforts to limit the conasquences of the emergency ,

and bring it under control. This position is further detailed in l Reference 2.25..

j 3.3 Fire Brigade: A team of plant personnel assigned to fire fighting ,

duties on a shift-by-shift basis and under the direction of the

! $$/CRS or Emergency Coordinator.

3.4 Tire Brigade Leader: An individual who through training and demon-strated experience through Reference 2.20 meets the necessary require-ments to direct the brigade during fire fighting activities and who is designated as "in charge" of the fire scene and of the brigade and is responsible for directing fire fighting activities at the location e

of the fire for both the brigade and off-site support.

4

.c . . . c. c ._m. . ..... .- .

9 Administrative Pro:edure UNT-5-013

, Fir] Protcetion Pr: gram Revision 0 3.5 Fire Protection Engint An engineer who is a graduate of an engineering curriculus of accepted standing and shall have completed not loss than 6 years of engineering attainment indicative of growth in engineering competency and achievement, 3 years of which shall have been in responsible charge of fire protection engineering work. These requirements are the eligibility requirements for "Member" grade in the Society of Fire Protection Engineers (STPE).

3.6 Fire Protection Permit: A form used to establish fire protection controls associated with traa lent combustibles, and ignition sources, and fire rated assemblies (references 2.11, 2.12, 2.16).

3.7 Fire Protection Systems: Passive and active elements of systems whose functions are to detect, suppress, and/or retard a fire.

Passire elements include fire barriers; i.e. , fire rated doors, hatch ts, penetrations,' duct dampers, walls., floors, and ceilings; separition design cciteria; access and exit routes; and design criter?.a for safety-related equipment on minimization .and/or isolatisa of combustibles. Active elements include the fire detectioe and alarm systems, fire water suppression systems, and hslon extinguishing systems.

3.8 Fire Watch: A trained person assigned to patrol or continuously observe an area or room for the purpose of detecting, reporting, and acting on fire hazards and fire occurrences in accordance with TP-1-015 - Duties of a Fire Watch.

3.9 Offsite Fire Departments: The offsite fire department is the Hahnv111e Volunteer Fire Department which has autual aid agreements with Luling and Killona Volunteer Fire Departments.

e 4

h 5

____ _ _ - -_. ,. , _ . ~ _ - . . _m . ~ _. - -- - - - - - - - - - - - --

I AA=4mistrative Procedura -

UNT-5-013 ,

Fire Pr;t:ction Pr:grsa Revinica 0  !

I 3.10 Operable - Operability: A system, subsystem, train, component, or device shall be OPERABLE or have OPERABILITY when it is capable of performing its specified functions), and when all necessary attendant instrumentation, controls, electrical power, cooling or l seal water, lubrication or other auxil4ary equipment that are  !

required for the system, subsystem, train, component, or device to perform its function (s) are also capable of performing their related ,

support function (s). l l

l 3.11 Pre-Tire Strategy: A document containing pertinent data for combating fires involving safety-related or other designated . ,

equipe,nt which supports plant operation. l t

3.12 Surveillance: A planned evaluation of an activity to ve-ify compliance with governing irocedures through observations record I L

review, and. visual examination..

4.0 RESPONSIBILITIES f

4.1 Sr. Vice President - Nuclear Operations The Sr. Vice Presideut - Nuclear Operations is responsible for the  !

overall management of the Firs Protection Program.  !

4.2 Vice-President - Nuclear i 1

1 The Vice-President - Nuclear is the senior % tite individual responsible for the fire Protection Prog. m arough the Plant Manager - Nuclear he ensures the implement. se and maintenauce of the program.

t i

i 6

,.___._m___.....__... . _ - - . . _ . _ _ . . .

Administr tive Pr:cedura UNT-5-013 Fire Pratsctica Pragram Revisien 0 4.3 Plant Manager - Nuclear The Plant Manager - Nuclear is responsible for the on-site formulation and implementation of the Fire Protection Program. As station Eeersency CoorMnator, he provides the on-site point of contact and control for all contingencies. This is accomplished through Reference 2.23.

4.4 Nuclear Operations Engineering and Construction (NOEC)

The Nuclear t.yerations Engineering and Construction Manager is responsible for maintaining plant design in accordance with regulatory commitments and as described in Reference 2.8.

4.5 Quality Assurance Manager .

The Quality Assurance Manager has responsibility far ths formulation ~

.and coordination of the implementation of the LP&L Quality Program directly related to the Waterford-3 SES Fire Protection Program.

4.6 Nuclear Services han q q The Nuclear Services Manager is responsible for coordinating the preparation of the Emergency Plan and Implementing Procedures, and preparation of emergency drill scenarios and cor. duct of practice drills.

4.7 Nuclear Safety and Regulatory Affairs Manager The Nuclear Safety & Regulatory Affair Manager is responsible for licensing activities associated with the Fire Protection Program including FSAR Update and maintaining LP&L's current commitments to NRC requitenects.

7

~ w ~ -. - u . . .w .

m.-w-...-..., . . - . . ~ . . . . - . , - - . . . . . - . . . - . . .

~

Adminicerctiva Proccdure UNT-5-013 Fire Protection Program Revision 0 4.8 Assistant Plant Manager - Technical Services The Assistant Plant Manager - Technical Sarvices is responsible for ensuring that the formulation, review and implementation of the Fire Protection Program is carried out. He is also responsible for providing overall direction to the Fire Protection and Safety Depart-ment regarding the Fire Protection Program.

4.9 As sistant Plant hanager - Operations and Maintenance The Assistant Plant Manager - Operations and Maintenance is respon-sible for implemantation, development and performance of the Fire Protection Program as related to operational and maintenance' activities.

4.10 Fire Protection and Safety Department .

T,a Fire Protection and Safety Department under the direction of the Loss Control Engineer is responsible for the control and implamentation of the Fire Protection Program and all other fire protection activities.

This is to include such areas, but is not limited to, proceddre development, technical assistance, interface with offsite organiza-tions, liaison to local fire departments, fire brigade coordination, .

approving members of the fire brigade, fire hazard analysis and insurance activity supervision. A member of this group shall serve as Reviewer on all permanent changes and revisions to Fire Protection Administrative. Operating, Surveillance and Preventive Maintenance Procedures, thereby ensuring the Fire Protection Program is maintaihed.

T , duties of the Fire Protection and Safety Department are further ned in reference 2.8.

l l 8 1

l

I Administr:tive Pr:c; dura UNT-5-013 -

Fira Pr:tcetica Pergram R.visica 0 4.11 Operations Superintendent - Nuclear The Operations Superintendent - Nuclear is responsible for overall safe and proper operation and surveillance testing of the plant systema to include the fire appliances.

4.12 Shift Supervisor / Control Room Supervisor (SS/CRS) ,

The SS/CRS is responsible for the operation of fire appliances in accordance with the FSAR, The Fire Protection Program, and established plant procedures. He is responsible to ensure adequate fire protec-tion measures are taken to compensate for inoperable fire protection systems. He is also responsible to ensure that five (5) qualified fire brigade members are on duty at all times. The SS/CRS reports to

. the Operations Superintendent for direction.

4.13 Fire' Brigade / Brigade Leader The Fire Brigade / Brigade Leader is responsible for the direction and performance of all fire fighting activities that may become necessary at the site. The Brigade Leader is responsible for direction of the brigade, coennunications and interface with the offsite fire departments.

4.14 Emergency Coordinator the Emergency Coordinator is responsible for implementation of the Emergency Plan and for providing necessary support to the plant staff and all contingencies thereto.

9

_ - . . - . . . . . . - . . . - . . . ~ . . . . . . . .. . .

7 .. . . ,

Administe:tive Prce: dura UNT-5-013 Fire Pr:tection Program Revision.0 4.15 Nuclear Operations Training Manager The Nuclear Operations Training Manager is responsible for scheduling and providing training and drills so as to maintain a qualified fire brigade in accordance with reference 2.1.

4.16 Radiation Protection Superintendent The Radiation Protection Superintendent is responsible for providing necessary radiological monitoring support to the Fire Brigade and -

for maintaining the Self Containment Breathing Apparatus (SCBA's) for use by the brigade.

4.17 Maintenance Superintendent - Nuclear The uaintenance Superintendent - Naclear is responsible for the maintenance and surveillance testing of the fire appliances and assuring that maintenance is conducted in accordance with approved methods and procedures.

5.0 PROCEDURE ,

5.1 GENERAL NOTE Specific Fire Protection System requirements are found in Attachment 6.1.

5.1.1' The Shift Supervisor and other plant personnel shall refer to this procedure when determining the operability, or testing requirements for fire protection systems. [

. 5.1.2 This, procedure replaces those portions of the Plant's Technical Specifications regarding Fire Protection Systems.

10

- ... .. _. + .... .

r Administrstiva Procedura UNT-5-013 Fire Protection Program Revision 0 5.1.3 Interpretations and revisions to this procedure shall require an evaluation in accordance with 10CFR50.59 and license condition 2.c.9 that the change does not significantly reduce the level of fire protection nor involves an unreviewed safety question, and the approval of a qualified Fire Protection Engineer.

5.1.4 Surveillance Requirements shall be applicable during the OPERATIONAL MODES or other conditions specified for individual systems unless otherwise stated in an indivihal Surveillance Requirement.

5.1.5 Each Surveillance Requirement shall be performed within the specified time interval with:

5.1.5.1 .

A enzimum allowable . extension not .to exceed 25%' of -

the surveillance interval, and 5.1.5.2 The combined time interval for any three consecutive surveillance intervals not to exceed 3.25 tLees the specified surveillance interval.

5.1.6 Failure to perform a Surveillance Requirement within the.

specified time interval shall constitute'a failure to meet the OPERABILITY requirements for a Specific System for Opera-tion. Exceptions to these requirements are stated in the individual specifications. Surveillance Requirements do not have to be performed on inoperable equipment.

5.1.7 Failure to comply with the compensatory "Action Statement" requirements or failure to complete the surveillance require-ments within the specified time for any of the systems or components listed in the following sections shall be documented and evaluated in accordance with reference 2.4. As part of this evaluation a review by a qualified Fire Protection Engineer shall,be required.

11

- - . . = . n ...., . w .~ ... . - - -.... .. . .. .- . . . . . .

Administrative Pr:cedura UNT-5-013

. Fire Protection Program Revision 0 5.2 0"<?!i d NTENANCE IMPAIRMENTS AND TESTING OF FIRE PROTECTION YJD P

o ,

.'e appliances are operated in accordance with applicable system Operating Procedures. Surveillance Testing of these systems is performed in accordance with Surveillance Test Procedures that satisfy surveillance requirements of Technical Specifications. Preventive and corrective maintenance of these systems is performed in accordance with written procedures or work instructions via References 2.21, 2.22 and 2.29.

Impairments to the fire protection system are controlled as specified in Reference 2.10.

5.2.2 Testing shall be planned and performed as necessarr to verify, acceptance of fire protection systems following maintenance or installation of approved modifications. Such testing. , ,

requirements shall be stipulated by the Work Authorisation (WA) that governs the maintenance or modification work activity.

5.2.3 Maintenance activities are reviewed prior to work by the Fire Protection and Safety Department and/or maintenance planners for potential impact to the program or system.

5.2.4 Maintenance is controlled by References 2.21, 2.22 and 2.29.

5.2.5 Specific requirements have been developed for activities involving fire rated assembly degradation. The controls and -

requirements are specified in Reference 2.16.

5.3 PLANT HODIFICATIONS l

5.3.1 All plant modifications are reviewed for impact on the fire protection system and program. Those that may involve such impacts are furthered reviewed by a qualified FPE to ensure compliance with Reference 2.5. This is accomplished via Reference 2.17.

12

y-....... . . 1.- .a. . . . . a . a .c ~. . . . . . . . . . . - . - . .. -

Administr:tive Pr:cedura UNT-5-013 Fira Pratcctica Pragram R;visica 0 5.4 FIRE PREVENTION ACTIVITIES

~

5.4.1 Fire Prevention activities are controlled by administrative and work procedures. Controls are established on combustibles (Section 5.4.2), ignition sources (Section 5.4.3), as well as operational and maintenance activities that may impact aspects of the Fire Protection Program as discussed below.

5.4.2 Control of Combustibles Insitu combustible materials are considered in References 2.6 and 2.26, and thus do not appear here. Transient combustibles that could potentially increase the anticipated fire loading of an area are controlled by Reference 2.12. This procedure utilizes a permit system to administratively control the hazard.

5.4.3 Ignition Sources Ignition Sources (i.e. , hot work, welding, cutting, grinding) activities are controlled by way of a hot work permit system.

This permit specifies .the fire watch and extinguisher require-ments. Programmatic controls are detailed in Reference 2.11.

5.4.4 Leak Testing Open flames or combustion generated smoke used for leak tests are strictly prohibited under any circumstances.

5.4.5 Smoking nestrictions Smoking is not permitted in areas other than those designated as "Smoking Areas".

I 13

~...-.w.. m... . . . . . . . - - . . . . ~ - . . . . . . .

Administr:tiv] Prse: dura UNT-5-013 Fire Protection Program Revision 0 5.5 FIRE EMERGENCIES 5.5.1 Response to fire emergencies is described in Reference 2.15.

This procedure prescribes instructions for announcing fire emergencies, fire fighting, requesting off-site assistance and the coordination thereof, interaction with the emergency plan and recovery from fire emergencies.

5.5.2 The Waterford 3 area is served by off-site personnel from the Hahnville Volunteer Fire Department. These men and

. equipment, through letters of agreement found in the W3SES Emergency Plan, will respond when requested and be under the direction af the plant Fire Brigade Leader who will interface closely with their Fire Chief or officer in charge.

. 5.~5.3 A site fire brigade of at least five. members shall be maintained on site at all times.

5.5.4 The fire brigade shall not include the Shift Supervisor, the Shift Technical Advisor, nor the two other members of the minimum shift crew necessary for safe shutdown of the unit or any personnel required for other essential functions during a fire emergency.

5.6 PRE-FIRE STRATEGIES 5.6.1 Pre-fire Strategies have been developed for all fire areas containing Safety-Related Equipment. These pre-fire strategies are available for use in the control room as'well as at the brigade lockers and provide all necessary information to effect fire fighting activities. Detailed requirements for these strategies are set forth in Reference 2.13.

14 l

1 i

Administrativa Procedura UNT-5-013 I Fira Prot:ctica Pr: gram Revisica 0

..=

5.7 TRAINING / EQUIPMENT 5.7.1 Fire Protection training shall be provided by the Nuclear Operations Training Department to members of the plant staff commensurate with their level of responsibility ~ The Fire

. Protection training staff will ensure that the following training is provided for those persons designated as requiring such:

5.7.2 Fire Watch Training 5.7.2.1 Firewatch Training shall be provided for those individuals designated to stand fire watch duty in accordance with References 2.9, 2.11, 2.12 and 2.20.

5.7.3 Fire Brigade Training 5 .' 7 . 3 .1 Fire Brigade Training shall be provided in accordacce with Reference 2.20 and shall meet the requirements of References 2.1, 2.2, 2.3 and 2.4.

5.7.4 Fire Brigade Leader Training 5.7.4.1 Fire Brigade Leader Training shall be provided in accordance with Reference 2.20 and shall meet the requirements of References 2.1, 2.2, 2.3 and 2.4.

l l 5.7.5 Fire Protection and Safety Department Staff Training 5.7.5.1 Fire Protection and Safety Staff Training should be provided on an annual basis to update the staff on current Fire Protection Methods and Philosophy.

Attendance at seminars and conferences is preferable (i.e., Edison Electric Institute, NFPA, IAFC, ASSE, etc.)

l ..

15 l

[

t

,i.........- ...u. . -.. .  :. . - . - - - - - ,

Administrative Proccduco UNT-5-013

. Fire Protection Program Revision 0 5.7.6 General Employee Training 5.7.6.1 General Employee Training shall include training on Fire Protection commen'surate with the employees position.

5.7.7 Handling of Flammable Liquids, Gases, and Chemicals 5.7.7.1 Training shall be provided for those individuals handling flammable liquids, gases, and chemical in accordance with Reference 2.20.

5.7.8 Response Training for Off-Site Groups 5.7.8.1 Training and Off-Site' Groups shall be provided in

- accordance 'with Reference 2.20 and shall' ocet the , ,

~

requirements of Refe'rences 2.1, 2.2, 2.3 and 2.4.

5.7.9 Fire Brigade Equipment is selected and maintained in accordance with accepted industry and fire service standards (i.e, UL or FM) as well as NFPA codes. Specifications, maintenance and

inventory requirements are detailed in Reference 2.14.

5.8 FIRE PROTECTION PROGRAM AUDITS 5.8.1 Audits and reviews of the fire protection program are conducted.to accomplish the following:

5.8.1.1 Review the Fire Protection Program and Laplementing procedures at least once per 24 months from a Quality Assurance point of view.

1 16

....,.-----..~---c-a a .w. . - - . , . . . . - .

i Administrative Procedura UNT-5-013

, Fira Prat:ctica Pr: gram Revisica 0 l..

5.8.1.2 An independent fire protection and loss prevention inspection and audit shall be performed annually utilizing either qualified off-site licensee personnel or a qualified outside firm.

5.8.1.3 An inspection and audit of the fire protection and loss prevention program shall be performed by a qualified outside fire consultant at intervals no greater than 3 years.

l l

5.8.2 These audits are further detailed in Reference 2.8.

l 1

5.9 QUALITY ASSURANCE ACTIVITIES l

5.9.1 Quality Assurance activities are discussed in detail in the

. FSAR' Section ,17.2 and Re'ference 2.8 .

5.10 FIRE WATCH 5.10.1 Assignments Fire watches shall be assigned as required by the Fire Protection Program. The SS/CRS shall ensure the initial assignment of fire watches as required. Where saintenance is needed prior to securing the fire watch assigned by Operations, the cognizant Maintenance Supervisor shall provide a relief fire watch as soon as possible. Where required by Fire Protection Permits, the cognizant Maintenance Supervisor shall ensure the assignment of the fire watch in accordance with References 2.11 and 2.12.

5.10.2 Duties Individual fire watch activities shall be performed in accord-ance with Reference 2.9 which details the duties of the watch.

17

)

l Ad=4n4 tr tiva Pr:sedurs UNT-5-013  !

- Fire Protection Program Revision 0 5.11 CONTRACTORS / SERVICES l

5.11.1 onsite contractors who maintain, modify, inspect and/or test fire protection systems shall be required to comply with the Fire Protection Program. In this regard, such contractors shall be required to either comply with applicable provisions of applicable plant procedures or with their procedures which l

have been reviewed for compliance with applicable provisions of this procedure. A qualified Fire Protection Engineer will review the qualifications of contract organizations performing specific work on fire protection related equipment or providing fire protection services when not directly supervised by the utility before beginning work. This may be accomplishment by serving as the contract manager for FP related contracts /

services.

5.12 HOUSEKEEPING 5.12.1 Periodic housekeeping inspections focused on fire protection are conducted for the plant areas under the provisions set forth in Reference 2.24.

5.13 RECORDS 5.13.1 Records generated to document performance of the surveillance t

requirements of this procedure shall be transmitted and stored by Project Files consistent to records documenting operations in accordance with the Facility Operating License.

6.0 ATTACHMINTS 6.1 Fire Prctection System Operability Requirements 6.2 Spray and/or Sprinkler Systems (1 page) l 6.3 Fire Hose Stations (2 pages) 6.4 Yard Fire Hydrants and Associated Hydrant Hose Houses (1 page)

W l

18

.. FIRE PROTECTION SYSTDi OPERABILITY REQUIREMENTS 6.1 FIRE DETECTION INSTRUMENTATION 6.I.1 As a minimum, the fire detection instrumentation for each fire detection zone shown in Attachment 6.2 shall be OPERABLE.

6.1.2 APPLICABILITY

Whenever equipment protected by the fire detection instrument is required to be OPERABLE.

6.1.3 ACTION

6.1.3.1 With any, but not more than one-half the total in any fire zone Function A fire detection instruments shown in Attachment 6.2 inoperable except in the annulus, restore the inoperable instrument (s) to OPERABLE STATUS within 14 days or within the next I hour establish a firs watch patrol to inspect the zone (s) with.the inoperable instrument (s) at least once per hour, italess the instrument (s) is located inside the containment', then inspect that' containment zone at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor and record air temperature at least once per hour at each of the operable Containment Fan Cooler Air Intakes.

6.1.3.2 With more than one-half of the function A fire detection instruments in at.f fire zone shown in Attachment 6.2 inoperable except in the annulus, or with any Function B fire detection instruments shown in Attachment 6.2 inoperable, or with any two or more adjacent fire detection instruments shown in Attach-ment 6.2. inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect the zone (s) with the inoperable instrument (s) at least once per hour, unless the instrument (s) is located inside the containment, then inspect that containment zone at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor air temperature at least once per j hour at each of the operable Containment Fan Cooler l Air Intakes.

UNT-5-013 Revision 0 Attachment 6.1 (1 of 16) j 19

r ._-..._-..1..e-. . .. . a ...__:....-_..z... .. , . . . . .

NOTE With SLield Building Ventilation System inoperable the annulus detection will be inoperable.

6.1.3.3 With both annulus detection instruments inoperable, restore at least 1 detector to operable status or within the next 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect the zone at least once per eight hours except during performance of the monthly Technical Specification Surveillance for Shield Building Ventilation.

6.1.4 Surveillance Requirements 6.1.4.1 Each of the above required fire detection instruments which are accessible during~ plant operation shall be demonstrated OPERABLE at least once per 6 months by

.perforuance.of a CHANNEL FUNCTIONAL TEST. Fire detectors which are not~ accessible during plant operation shall be demonstrated'0PERABLE by the performance of a CHANNEL . FUNCTIONAL TEST during each COLD SHUrDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.

6.1.4.2 The NI'PA Standard 72D supervised circuit supervision associated with the detector alarms of each of the above required fire detection instruments which are accessible during plant operation shall be demonstrated OPERABLE at least once per 6 months. Circuits which are not accessible during plant operation shall be demonstrated OPERABLE during each COLD SHUTDOWN exceeding 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> unless performed in the previous 6 months.

6.1.4.3 Each of the thermistor wires required by Attachment 6.2 shall be demonstrated OPERABLE at least once per 6 months by verifying the proper thermistor resistance.

UNT-5-013 a8evisiot 0 Attachment 6.1 (2 of 16) 20

- - . m - m =-.--.= m w - w ... - _ ...--n _ .. .- . - . . .. . .-

.- 6.2 FIRE SUPPRESSION WATER SYSTDi

  • 6.2.1 The fire suppression water system shall be OPERABLE vith:

6.2.1.1 Two fire suppression pumps, each with a rated capacity of 2000 spe, with their discharge aligned to the fire suppression header, 6.2.1.2 Separate water supplies, each with a minimum contained volume of 237,000 gallons (33 feet), and 6.2.1.3 An OPERABLE flow path capable of taking suction from the east fire water tank and transferring the water through distribution piping with OPERABLE sectiona-lizing control or isolation valves to the yard hydrant curb valves, the last valve ahead of the water flow alarm device on each sprinkler or hose standpipe, and the last valve ahead of the deluge valve on each deluge or spray system required to be OPERABLE per Sections 6.3, 6.5, and 6.6 of this procedure.

6.2.2 APPLICABILIT_T ' At all times.

6.2.3 ACTION

l 6.2.3.1 With one pdep and/o. one water supply inoperable, restore at least two pumps and/or water supplies to OPERABLE status within 7 days or provide an alternate backup pump or supply.

6.2.3.2 With the fire suppression water system otherwise inoperable, establish a backup fire suppression water system within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

UNT-5-013 Revision 0 Attachment 6.1 (3 of 16) 21

c. ,m - -r_. .~ w - m .-. . . . . e . e=- _ . --.m.._ -., . . . . _

4 .

NOTE A backup water supply may be established by use of a fire department pumper or alignment to another plant system. In eicher case the backup supp'ly shall be able to supply an equivalent flow and discharge pressure.

6.2.4 Surveillance Requirements 6.2.4.1 The fire suppression water system shall be demonstrated OPERABLE:

6.2.4.1.1 At least once per 7 days by verifying the contained water supply volume.

6.2.4.1.2 At least once per 31 days by starting the electric motor-driven pump and operating it for at least 15 minutes.

6.2.4.1.3 At least once per 31 days by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position is in its correct position.

6.2.4.1.4 At least once per 12 months by performance of a system flush.

l 6.2.4.1.5 At least. once per 12 months by cycling each testable valve in the flow path through at least one complete cycle of ,

full travel. I 1

UNT-5-013 Revision 0 Attachment 6.1 (4 of 16) 22

w- u .+-~ - . x.n.. . . - w ~ ~. c . - . . - - - < u. .- -. . . - - . . . . . . .-

s' 6.2.4.1.6 At least .once per 18 months by performing

. a system functional test which includes

. aisulated automatic actuation of the system throughout its operating sequence, and:

A. Verifying that each pump developes at least 2000 gym at a total head 100 paid by verifying at least 3 points on the pump performance curve during performance testing.

B. Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel, and C. Verifying tha*. each fire suppression pump starts (sequentially) to maintain the fire suppression water system pressure greater than or, equal to 96,5 psig.

6.2.4.1.7 At least once per 3 years by performing a flow test of the system in accordance with Chapter 5, Section 11 of the Fire j Protection Handbook,14th Edition, published

by the National Fire Protection Assoc.ation.

a 6.2.4.2 Each fire pump diesel engine shall be demonstrated

. OPERABLE

6.2.4.2.1 At least once per 31 days by verifying:

A. The diesel fuel oil day storage tank contains at least 170 gallons of f

fuel, and UNT-5513 Revision 0 Attachment 6.1 (5 of 16)

! 23

p- -- - m .- -aw.m - - - - -

B. The diesel starts from ambient condi-ti.ons and eperates for at least 30 minutes.

6.2.4.2.2 At least once per 92 days by verifying that a sample of diesel fuel from the fuel storage tank, obtained in accordance with ASTM-D270-75, is within the acceptable limits specified in Table 1 of ASTM D975'-77 when checked for viscosity, water and sediment.

6.2.4.2.3 At least once per 18 months during shutdown, by subjecting the d'esel i to an inspection in accordance with procedures prepared in conjunction with its manufacturer's recommendations for the class of service.

6.2.4.3 .Each fire pump diesel startin'g 12-valt battery bank and charger shall be' demonstrated OPERABLE:

6.2.4.3.1 At least once per 7 days by verifying that:

l A. The electrolyte level of each battery is above the plates, and B. The overall battery is greater than or equal to 12 volts.

6.2.4.3.2 At least once per 92 days by verifying that the specific gravity is appropriate for continued service of the battery.

UNT-5-013 Revision 0 Attachment 6.1 (6 of 16) 24 j

m m m m -- m a s. r--m w a n -u...-am .s ,.c.,a m - w.-. . . . . - - -

l 6.2.4.3.3 At least once per 18 months by verifying l that:

A. The batteries and battery racks show not visual indication of physical damage or abnormal deterioration, an!

l B. The battery-to-battery and terminal connections are clean, tight, free of corrosion, and coated with anticorro-sion material.

6.3 SPRAY AND/OR SPRINKLER SYSTDfS 6.3.1 As a minimum, the Spray and/or Sprinkler Systems 11sted in Attachment 6.3 shall be OPERAPLE.

6.3.2 APPLICABILITY

Whenever equipment protected by the spray /

. sprinkler systera i.s required to be OPERABLE. ,

6.3.3 ACTION

6.3.3.1 With one or more of the above required spray and/or sprinkler systems inoperable, within I hour establish a continuous fire watch with backup fire suppression equipment for those areas in which redundant systems or components could be damage unless the spray and/or sprinkler system (s) is located inside the containment, then inspect that containment area at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> or monitor air temperature at least once per hour at erch of the operable Containment Fan Cooler air intakes, for other areas, establish an hourly fire watch patrol.

UNT-5-013 Revision 0 Attachment 6.1 (7 of 16) 25

_ - - _ _ _ _ _ _ _ _ _ _ _ _ - . - - - - - - - - - _ ---------------.--o

~ =. zw, m-m.-,-~--......--

6.3.4 Surveillance Requirements ,

. 6.3.4.1 Each of the Spray and/or Sprinkler Systems listed in Attachment 6.3 shall be demonstrated OPERABLE:

6.3.4.1.1 At least once per 31 days by verifying that each valve (manual, power-operated, or automatic) in the flow path that is not locked, sealed, or otherwise secured in position is is its correct position.

6.3.4.1.2 At least once per 12 months by cycling each testable valve in the flow path through at least once complete cycle of full travel.

6.3.4.1.3 At least once per 18 month:

, . A. .By performing a system functional test

' ' ~

which it.cludes simulated automatic -

actuation of the system, and:

B. Verifying that the automatic valves in the flow path actuate to their correct position on a thsemal/ .

preaction test signal, and C. Cycling each valve in the flow path that is not testable during plant operation through at least one complete cycle of full travel.

D. By a visual inspection of the dry L pipe spray and sprinkler headers to verify their integrity, and. l I

UNT-5-013 Revision 0 Attachment 6.1 (8 of 16) 26 l

w wrnmmenmm__, .ggm.p. w.w =._ , . i. ; w w.- . ;._a. _ .

, , , -E. By a visual inspection of each nozzle's spray area to verify the

. spray pattern is not obstructe'd.

NOTE The charcoal filter unit spray nozzles need only be inspected each time the charcoal is removed.

6.3.4.1.4 At least ov.c per 3 years by performance .

of an air flow test through each open head spray and/or sprinkler system and verifying that each open head spray nozzle and sprinkler header system is unobstructed.

6.4 HALON SYSTEMS 6 .~ 4 .1 The Plant Computer Room Subfloor Halon System shall be OPERABLE.

6.4.2 APPLICABILITY

Whenever equipment protected by the Halon system is required to be OPERABLE.

6.4.3 ACTION

6.4.3.1 With the above required Halon system inoperable, withir I hour establish an hourly fixe watch patrol.

6.4.4 Surveillance Requirements 6.4.4.1. The Plant Computer Room Subfloor Halon System shall be demonstrated OPERABLE:

UNT-5-013 Revision 0 Attachment 6.1 (9 of 16) 27

_,,__y_ ._._ m

. _ _ mg,.___._m_._.,.,..

~

. 6.4.4.1.1 At least once per 31 days by verifying -

that each valve (manual, power-operated, or automatic) in the flow path is in its correct position.

6.4.4.1.2 At least once per 6 months by verifying Halon storage tank weight to be at least 95% of full charge weight (level) and pressure to be at least 90% of full charge pressure.

6.4.4.1.3 At least once per 18 months by verifying:

A. The systea, including associated ventilation dampers and fire door release mechanisms, actuates manually and automatically, upon receipt of a i simulated test signal, and.

1 j B. , Performance of a flow test through headers and nozzles to assure no blockage.

6.5 FIRE HOSE S?ATIONS 6.5.1 The Fire Hose Stations list in Attachment 6.4 shall b'e OPER\BLE.

6.5.2 APPLICABILITY

Whenever equipment in the areas protected by the fire hose stations is required to be OPERABLE.

UNT-5-013 Revision 0 Attachment 6.1 (10 of 16) 28

-m ~me.ww -%.-- .. .

~

...~ 6.5.3 , ACTION:

  • 6.5.3.1 With one or more of the fire hose stations shown in Attachment 6.4 inoperable, provide gated wye (s) on the nearest operable hose station (s). One outist of the wye shall be connected to the standard length of hose provided for the hose station. The second outlet of the wye shall be connected to length of hose sufficient to provide coverage for'the area left-unprotected by the inoperable. house station. Where

, it can be demonstrated that the physical routing of the fire hose would result in a recognizable hazard to operating technicians, plant equipment, or the hose itself, the fire house shall be stored in a roll at the outlet of the operable hose station.

l Signs shall be mounted at the gated wye (s) to identify the proper hose to use. The above action shall be accomplished within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> if the inoperable fire l hose, is .the , primary.means of fire suppression;, ,

~o therwise, ro'ute the additional hose within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

6.5.4 SURVEILLANCE REQUIREMENTS 6.5.4.1 Each of the Fire Hose Stations in Attachment 6.3 I

shall be demonstrated OPERABLE.

6.5.4.1.1 At least once per 31 days by visual inspection of the stations accessible during plant operation to assure all required equipment'is at the station.

6.5.4.1.2 At least once per 18 months by:

a. Visual inspection of the stations not accessible during plant operations to

-- assure all required equipment is at the station.

UNT-5-013 Revision 0 Attachment 6.1 (11 of 16) 29

yv ^s. ::: 43=n~=m..w= ww-?v-, "-:: ~ - - - = - - -- m: =: : . .- x. := .:= =- 1 B. Removing the hose for inspection and reracking, and C. Inspecting all garkets and replacing any degraded gaskets in tiie couplings.

6.5.4.1.3 At least once per 3 years by:

A. Partially opening each hose station valve to verify valve OPERABILITY and no flow'blocka p.

B. Conducting a hose hydrostatic test at a pressure of 150 psis or at least 50 psig above maximum fire main operating pressure, whichever is greater.

6.6 YARD. FIRE HYDRANTS AND HYDRANT HOSE HOUSES 6.6.1 The Yard Fire Hydrants and Associated Hydrant Hose Houses listed in Attachment 6.5 shall be OPERABLE.

6.6.2 APPLICABILITY

Whenever equipment in the areas protected by the yard fire hydrants is required to be OPERABLE.

6.6.3 ' ACTION 6.6.3.1 With one or more of the yard fire hydrants or associated hydrant hose houses shown in Attachment 6.5 inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> have sufficient addi-tional lengths of 2-1/2-inch diameter hose located in an adjacent OPERABLE hydrant hose house to provide service to the unprotected ares (s) if the inoperable fire hose is the primary means of fire suppression; otherwise, provide the additional hose within 24 ho urs,.

UNT-5-013 Revision 0 Attachment 6.1 (12 of 16) 30

nyrrme"wwmm=-c- =-:.- t = =. . .:_w- ,.v. _._.. m .. -...z.- .. . . .

, , , 6.6.4 SURVEIIIANCE REQUIRE!fENTS

. 6.6.4.1 Each of the Yard Fire Hydrants and Associated Hydrant Hose Houses shown in Attachment 6.5 shall be demon-strated OPERABLE:

6.6.4.1.1 At least once per 31 days by visual inspection of the hydrant hose house to assure all required equipment is at the hose house.

6.6.4.1.2 At least once per 12 months by:

A. Conducting a hose hydrostatic test at a pressure of 150 psig or at least 50 psig above marimum fire main operating pressure whichever is greater.

B. Inspecting all the gaskets and replacing ,

any degraded gaskets in the couplings. -

C. Performing a flow check of each hydrant to verify its OPERABILITY.

D. Visually inspecting each yard fire hydrant and verifying that the hydrant barrel and the hydrant are not damaged.

UNT-5-013 Revision 0 Attachment 6.1 (13 of 16) 31

- w. ~ . . :. - c . ,,..~.a . . .- . .

~

  • - 6.7 FIRY RATED ASSEMBLIES 6.7.1 All fire rated assemblies (walls, floor / ceilings, cable tray enclosures, and other fire. barriers) separating safety-related fire areas or separating portions of redundant systeer Laport-ant to safe shutdown within fire area and all sealing devices in fire rated assembly penetrations (fire doors, fire windows, fire dampers, cable, piping, and ventilation duct penetration seals) chall be OPERABLE.

6.7.2 APPLICABILITY

At all times.

6.7.3 ACTION

a 6.7.3.1 With one or more of the above required fire rated

assemblies and/or sealing devices inoperable, within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> either establish a continuous fire watch on at least one side of the affected assembly, or ,

, , verify the OPERABILITY of the , fire detectors on at, least one side of the inoperable assembly and establish an hourly fire watch patrol.

6.7.4 Surveillance Requirements i

~

i l 6.7.4.1 At least once per 18 acoths the above required fire

rated assemblies and penetration sealing devices
other than fire doors shall be verified OPERABLE by

6.7.4.1.1 Performing a visual inspection of the exposed surfaces of each fire rated assembly.

i i

l r .-

)

i i

l UNT-5-013 Revision 0 Attachment 6.1 (14 of lo) i 32

m . ._ - . _. .. .. m _ -..

6.7.4.1.2 Prefooning a visual inspr , nf each fire window / fire dasper/5- see .ated a hardware.

6.7.4.1.3 Performing a visual inspection of at least 10% of each type of sealed penetration. If apparent changes in appearance or abnormal degradationa are found, a visual inspection of an .

additional 10% of each type of sealed penetration shall be made. This .

inspection process shall continue until a 10% sample with no apparent changes in appearance or abnormal degradation is found. Samples shall be selected such that each penetration seal will be inspected at least once per 15 years.

6.7.4.2 ,Each of the above required ' fire. doors shall be verified OPERABLE by insp'ecting the automatic hold-open, release, and closing mechanism and latches at least once per 6 months, and by verifying:

6.7.4.2.1 The OPERABILITY of the fire door supervision system for cach electrically srpervised fire dior by performing a C.IANNEL FUNCTIONAL TEST at lesst once per 31 days.

6.7.4.2.2 That each locked-closed fire door is closed at least once per 7 days.

UNT 5-013 Revision 0 Attachment 6.1 (15 of 16) 33

e m .zies-ee=.:. .

..:.- ..::.. . y a ... ,.:.= : w= . . . . : ; ; w.. :- --- - - -- - -- --. - =---

.n

.? 6.7.4.2.3 That doors with automatic hold-open and' ~ l releast- mechanisms are free of obstructions at laast once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and performing a functional test of these mechanisms at least once per 18 months.

6.7.4.2.4 that each unlocked fire door without t electr'.'...' eupervision is closed at least once per s4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. ,

r

?

r a

f J

4 i i

4 r

L

. t f

L i

i UNT-5-013 Revision 0 Attachant 6.1 (16 of 16) I 3/

l

.c. , .,,,..-,,nn -

.w .

wnw. :.v..:.: .mn wa. nim x m war y.u s. w w n.m .~w .

., FIRE DETECTION INSTRUMENTS

. ELEVATION HEAT FLAME SMOKE ZONE ROOM NAME/ NUMBER (ft) QLy), QLy), QLy,),

1. REACTOR AUXILIARY BUILIDING RAB 1A Main Control Panels 1,2,3,4,6,7,8,35,36 +46 10/0 RAB 1A Control Room Proper /304 +46 20/0 RAB 1B Emergency Equip. H&V Room /314 +46 0/12 RAB 1D Computer Raos (above raised floor)/306 +46 5/0 Computer Room (below raised floor)/306 +46 0/7 RAB 2 Ventilation Equip. Room /299 +46 0/35 RAB 3 RAB Corridor to Relay Rooe/261 +35 0/1(3) 4/0 RAB HVAC Switchgear Equip. Room /323 +46 0/10 RAB 3A RAB Battery Exhaust Fan Rooe/406 +69 0/2 RAB 4 Cable Valult/260 +35 0/27 RAB 5 Electrical Penetration Area "A"/263 +35 0/13 RAB 6 Electrical Penetration Area "B"/263A +35 0/14 RAB 7 Relay Rooe/262 +35 (3) 12/0 Isolation Panels (9 Compartments +35 2/0

- 2 per comp.)

RAB 8A High Voltage Switchgest Roon "A"/212A +21 0/1(1) 18/0 l

RAB 8B Electrical Equip. Roort/225B and High +21 0/1(2) 28/0

. Voltage Switchgear Roon "B"/212 480V Switchgear 3AB2 Foom +21 (2) 2/0 RAB 8C High Voltage Switchgear Room +21 (1)~

8/0 '

"A-B"/2123 - -

RAB 8E CEA M/G Set Room /216 +21 2/0 RAB 9 Remote SLutdown Panel Room /217 +21 1/0 RAB 11 Battery Roon "B"/213 +21 2/0 RAB 12 Battery Roon "AB"/214A +21 2/0 RAB 13 Battery Roos "A"/214 +21 2/0 RAB 15 Emergency Diesel Gen. "B" Room /222 +21 0/1 RAB 15A Emergency Diesel Gen. "B" Feed Tk +46 0/1 Room /328A RAB 16 Emergency Diesel Gen. "A" Room /221 +21 0/1 Emergency Diesel Gen. ".v' Feed Tk.

RAB 16A +46 0/1 Room 328A RAB 17 CCW Heat Exchanger "B"/236 +21 0/4 RAB 18 CCW Heat Exchanger "A"/220 +21 0/4 RAB 19 CCW Pump "A"/235 +21 0/2 RAB 20 CCW Pump "AA"/234 +21 0/2 RAB 21 CCW Pump "B"/233 +21 1/0 R/B 21 Corridor to CCY Pumps /218, Corridor +21 0/39 to CCW Heat EIchangers/219 and Corrider to Emergency Diesel Gen./225A (1) Common Thermistor Wire (2) Common Therwistor Wire (3)Cosmon Thermistor Wire UNT-5-013 Revision 0 Attachment 6.2 (1 of 3)

O

  • 35 i

_ _ _ __ _ _ _ _ __ g ._. _, , , ___

~

FIRE DFTECTION INSTRUMENTS

  • FLAME SMOKE ELEVATION HEAT ZONE ROOM NAME/ NUMBER (ft) M MM
1. REACTOR AUZILIARY BUILIDING (Con'tinued)

RAB 25 Equip. Access Area /226 (wing area) +21 15/0 RAB 27A R&V Room /124 +7 0/6 RAB 276 Electrical Area and Health Physics +7 0/35 Offices /122 RAB 27C I&C Room /120 +7 0/6 RAB 27D Communications Equip. Rooe/123 +7 1/0 RAB 31 Corridors and Passageways -4 0/24 Corridors on eastside -4 . 0/21 RAB 32 Wing Area westside - Auxiliary Coe- -35 32/0 ponent Cooling Water Pump "A"/B53 &

and Pipe Penetration Area /B100 -4 Wing Area Canter /B53 and B100 -35 & 28/0

-4 Wing Area eastside-Component Cooling -35 31/0 Water Puey "B"/B53 and Pipe Penetrae. ion Ares /B100 -4 RAR 33 S/D Cooling Heat Exchangers A&B/B20 -35 0/18

& B48 -

RAB 34 V'alve Operating Enclosurv Bay Ro w '-15.5 2/0 "A"/B54. .

Valve Operating Enclosure Bay Room -15.5 ' 4/0 "B" B55A RAB 35 .* afety Injection Pump Roos B/B16 -35 10/0 RAB 36 Safety Injection Pump Room A/ BIS -35 10/0 RAB 37 Motor-Driven Emergency Feedpump -35 0/1 "A"/B49A RAB 38 Motor-Driven Emergency Feedpump -35 1/0 "B"/349B RAB 39 General Equipment Area /B5, 12, 13 35 0/10 i & 49 l

Corr! dors & General Equip. Areas /B5, -35 0/28 1, 2, 3, 4, 39, 40, 41, 42, 44 & 46 East Corridor & General Equip. Areas / -35 0/15 B17, 23 & 25 BA Make-up Tank "A"/B38 -35 4/0 BA Make-up Tank "B"/B53A -35 4/0 2AM 40 Diesel Storage Tank "A"/B50 -35 3/0 RAB 41 Diesel Scorage Tank "B"/B52 -35 3/u UNT-5-013 xtvision 0 Attachment 6.2 (2 of 3) 36 m-

      • CV"i, W - M E.M W MHCt$ ssG W M Mukrk';.3sO.-s=m;ZM & 5'iCS B % ~ L K- Q* * ~ ' * ~ " --

l

~* . .-

[

i

_F_Ing wT:CTION InsTRuuErrS j ELEVATION REAT FLAME SM0EE -

M ROON NAME/NIBIBER (ft) ,(x/gl ,(xfzl @ f

2. REACTOR CONTAINMENT BUILIDIN0**

f RCB 1-1 Amaulus/420*** -

+46 2/0  !

34/0 ,

t RCB 2 Electrical Penetration Area A +21 24/0 [

RCB 3 - Electrical Penetration Area B +21 21/0 '

RCB 4 Reactor Cable Trays +44 16/0 CT 1&3 Wt & Dry Coeling Tower "A" Cable Tray 1/0 ,

CT 244 W t & Dry Coeling Tower "B" Cable Tray 1/0 t

!3. FUEL MANDLING BUILDIN0 .

f FEB 2 Purification Pump Room /3155, Fuel Pool +1 '10/0 Pump "A"/3157, Fuel Pool Pump "B"/

B156, Fuel Pool Heater Eachanger/ [

B154 and Access Area /3-161 i Emergency Filter Train Unit /3152 +1 6/0  ;

Emergency Elect. Equip. Room /8151 +1 . 1/0 i FEB 4 Operating Floor /361 +44 16/0 l

4. CEARCOAL AIR FILTER 11 NITS [

i E-35 FEB Imergency Filter Train Unit "A" +1 1/0 L (3A-SA). . .

FEB Emergency Filter Train Unit'"B" E-35'

+1 1/0 '

.[

(38-53) t E-17 Shield Building Ventilation System +44 1/0 l (3A-SA) Filter Traia "A" .

E-17 Shield Bailding Ventilatisa System +44 1/0  !

(3B-83) Filter Traia "B" ' {

I-23 controlled Yeatilation Area +46 '1/0  !

(3A-SA) System Filter Trais "A" ,

E-23 Controlled Ventilation Area +46 1/0 ,

(3A-SB) System Filter Train "B" t S-4 Contrel Ream Emergency +46' 1/0  !

(Ja-SA) Filter Train "A" l S-3 Control Room Emergency +44 1/0 (33-58) Filter Train "B" TABLE NOTATIONS 0(m/y): a is the number of Function A (early warning fire detection and noti.fication f esly) instruments. i y is the number of Function 3 (actuation of fire suppession systems and early [

.; warmias and notification) instruments. }

f l **The fire detection instruments located within the containment are not required to be  !

OPERABLE during the performance of Type A containnsat leakage rate tests. {

~

      • Annulus detection'is profided by smoke detectors sounted in the duct of the Annulus N:sstive Pressure System. This segment of duct is physically located in the +46 RAB R&V Equipment Room (2P9).

f ,

l' i

UNT-5-013 Revision 0 Attachment 6.2i3of3) 37

-.. - ,_,_, - - _wr , ,-.-------,,.,_-_,me-

m- - m..-mee.r ueo-ce m -- . % ..e..m.~ .o-.

. ,, SPRAY AND/0R SPRINEIZR SYSTEMS 8prinkler No. Blda./Elev. Location -

FPM-1 RCB ' Reactor Coolant Pumps 1A, IB TPM-2 RCB Reactor Coolant Pumps 2A, 2B TPM-3A RAB +21, +44 Diesel Generator Area A, Feed Tank Room A FPM-4B RAB +21, +44 Diesel Generator Area B, Feed Tank Room B FPM-11A RAB -35 Emergency D/G Fuel Oil Tank A .

TPM-12B RAB -35 Emergency D/G Fuel Oil Tank B TPM-16 . WPH +15 Fire Water Pump House TPM-17 RAB +35 Cable Vault Area  ;

TPM-18 RAB +35 Electrical.Penetratien Area 1

, TPM-19 RAB +35 Electrical Penetration Area 2 FPM-22 RAB -4 Corridor and Blowdown Tank Rooms FPM-23 RAB -35 Corridor,' Shutdown Heat Exchanger Rooms, l EW Pump Roon l TPM-24 RAB +21 Corridors, CCW Area l FPM-255 ,

RAB +21, ,

North High, Voltage Switchgear Room FPM-26 RAB +46 Ventilation' Equipment Rooms .

TPM-27 RAB +7 HVAC Rooms I

TPM-28 RAB -35 Auxiliary Component Cooling Water Pump. Rooms ,

TPM-29 RAB +35 Relay Room, Corridor TPM-30A RAB +21 South High Voltage Switchgear Room i

TPM-33 RAB +46 E-17 (3A-SA) Shield Building Ventilation Systes Filter Train "A" Charcoal Absorber  ;

TPM-34 RAB +46 E-17 (3B-SB) Shield Building Ventilation Systes  !

i T11ter Train "B" Chascoal Absorber TPM-36 RAB +46 E-23 (3A-SA) Controlled Ventilation-Area System s

Filter Train "A" Charcoal Absorber FPM-37 RAB +46 E-23 (3B-53) Controlled Ventilation Area System i

] . Filter Train "B" Ch:.rcoal Absorber

! I i L

.-  ?

UNT-5-013 Revision 0 Attachment 6.3 (1 of 1)

. 38  !

.,-..-en.~.--

. .w,- ~ - . - . _ _ _ _ , _.

~ , _ . . - - . _ . , -, - ,.-_ - -..-.-----. ,- .-.,, - -

-_.,-n

m- .n = w w w.v- w m as m -w. ---e=s m e . ~. a m :. w "

.8 FIRE HOSE STATIONS ,

IbCATION BLDG / COLUMN ELEVATION (Feet MSL) HOSE RACE IDENTIFICATION FEB 2FH-U -35 FH/A-010 FEB 3FH-V +1 FN/A-020 FEB 5FN-V +1 FH/A-021 FEB 2FI-T +21 FH/A-040 I FIB 2FR-V +18 FI/A-041 l FEB Iscape Exit +21 F5/A-043 -

FEB 6FI-W +18 FR/A-042 FIB '2FN-T +46 FE/A-030 FEB 7FN-W +46 FN/A-031 RAB 'J-9A -35 ,RA/F-101 RAB J-6A -35 RA/F-102 RAB N-4A -35 RA/F-103 RAB J-3A -35 RA/F-104 RAB K-4A -35 RA/F-105 RAB M-10AZ -35 RA/C-106 RAB M-3A -35 RA/A-107 RAB M-2AC -20 RA/K-108 s RAB M-11AZ -20 RA/L-109 RAB K-10A -35 RA/F-110 RAB K-11A -4 RA/D-201 RAB M-11A -4 RA/D-202 '

W l. J-10A -4 .RA/E-203 ,

'RAB .J-6A '

-4 RA/H-204' RAB H-4A -4 RA/I-205 RAB K-4A -4 RA/J-206 RAB M-10AZ -4 RA/C-207 RAB M-3A -4 RA/A-208 RAB LY-8A -4 RA/B-209 RAB K12A +7 RA/D-301 RAB J11A +7 RA/D-302 RAB H-11A +21 RA/E-401 RAB R-9A +21 RA/E-402 RAB K-11A +21 RA/D-403 RAB L-7A +21 RA/C-411 RAB N-10AZ +21 RA/C-405 RAB J-6A +21 RA/I-406 RAB R-44 +21 RA/I-407 RAB J-1A +21 RA/I-408 RAB K-4A +21 RA/J-409 RAB L-7A +21 RA/G-410 RAB N-4A +21 RA/A-412 RAR L-2A +21 RA/A-413 RAB R-12A +35 RA/E-501 RAB K-11A +35 RA/E-502 RAB N-10AZ +35 RA/C-503 UNT-5-013 Revision 0 Attachnent 6.4 (1 of 2) 39

ge - -

3-_  : y; - _

_s- . _y; - -- - w;;..;;;._ w  :;.c... : ;r ;. .:c . .;c 2__ ..:.---

ce

  • o. TIRE BOSE STATIONS s

LOCATION BLDG / COLUMN ELEVATION (Feet MSL) HOSE RACK IDENTIFICATION RAB Northeast Stairwell +21 RA/C-404 RAB N-10A +35 RA/E-504 RAB K-9A +35 RA/E-505 RAB L-9A +35 RA/C-506 RAB LY-6A +35 RA/A-507 RAB J-9A +35 RA/E-508 rah L-8A +35 RA/E-509 RAB G-9A +35 RA/E-510 RAB J-12A +46 RA/E-601 RAB K-11A +46 RA/G-602 RAB K-10A +44 RA/G-603 RAB K-8A +46 RA/G-604 RAB G-7A +46 RA/G-605 RAB K-6A +46 RA/J-606 RAB K-2A +46 RA/J-607 RAB J-2A +46 RA/J-60$

RAB J-3A +46 RA/J-609 PJ. :t K-2A +69 RA/J-701

  • R8 i 19 -4 K/A-201
  • RCS 12 -4 R/A-202
  • RCB 6 -4 - .R/B-203 '
  • RCB 1 -4 R/B-204; "

.cRCB ' 20 +21 ' , .R/A-401.

  • RCB 13 +21 R/A-402
  • RCB 7 +21 R/B-403 ,
  • RCB 1 +21 R/B-404
  • RCB 13 +35 R/A-502

! *RCB 20 +46 R/A-601

  • RCB 13 +46 R/A-602
  • RCB 7 +46 R/A-603 CRCB 2 +46 R/B-604
  • Indicater all hose stations not accessible during plant operations and shall be demonstrated operable at least once per 18 months.

UNT-5-013 Revision 0 Attachment 6.4 (2 of 2) 40

p.r , e_: c. = v w .x - cov - ,wv e ,- - - - -~~~ ~ - -

e

, pC YARD FIRE HYDRANTS AND ASSOCIATED HYDRANT HOSE HOUSES E0 CATI 0g HYDRANT N Northeast Side RA8 4 Northeast Corner 11tB 6 Northwest Corner FEB 7 Northeast Corner Service Buildia's 9 UNT-5-013 Revision 0 Attachment 6.5 (1 of 1) 41

_ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ .. -- --__ - - -